TenderDekho Logo
Closed GEM

Indian Army Department Of Military Affairs Tender for Non-Destructive Testing & Related Engineering Equipment Secunderabad Telangana 2025

Bid Publish Date

13-Nov-2025, 1:09 pm

Bid End Date

24-Nov-2025, 10:00 am

Progress

Issue13-Nov-2025, 1:09 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

7

Category

Non destructive testing using thermal/ infrared technique

Bid Type

Single Packet Bid

Key Highlights

  • Mandatory 25% quantity variation right and corresponding delivery extension calculations
  • Requirement to submit Detailed Design Drawings within 10 days of award
  • Delivery and commissioning site: FAE MCEME TRIMULGHERRY SECUNDERABAD TELANGANA
  • 1-year warranty from final acceptance or post-installation testing
  • Functional Service Centre in each consignee state; 30-day establishment window
  • Dedicated toll-free service support line required

Categories 12

Tender Overview

Indian Army Department Of Military Affairs invites bids for diverse engineering and testing services including non-destructive testing using thermal/infrared technique, oxygen purity check kits for field units, hydraulic lifting/towing systems for Cheetah/Cheetal Heptr, and fabrication of missile launcher components and gun feed mechanisms. Delivery location is Secunderabad, Telangana with a flexible quantity option of up to 25% during and after contract. Bidder must submit Detailed Design Drawings within 10 days of award, with buyer feedback in the subsequent 10 days; non-compliance may shift delivery timelines. The contract emphasizes fabrication per approved drawings and on-time delivery with modification allowances.

Technical Specifications & Requirements

  • Delivery address: FAE, MCEME, TRIMULGHERRY, SECUNDERABAD, TELANGANA.
  • Option clause: Purchaser may increase/decrease quantity by up to 25%; extended delivery time calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Drawings approval: Submit Detailed Design Drawings within 10 days; buyer to approve or list modifications within 10 days; delays in approval extend delivery without LD.
  • Warranty: Supplied products carry a 1-year warranty from final acceptance or after installation, whichever is later.
  • Service capability: Functional Service Centre in each consignee state; establish within 30 days of award; dedicated toll-free service line required.
  • Payment/Delivery: Not explicitly stated; delivery/installation to Secunderabad office; penalties and LD terms implied via general tender terms.

Terms, Conditions & Eligibility

  • Delivery timeline: Extends with option clause; minimum delivery adjustments include 30 days.
  • Warranty: 1 year warranty from acceptance/installation completion.
  • Service network: Must have a functional service centre in the state of each consignee; establish within 30 days if not present.
  • Support: Dedicated toll-free service number required.
  • Bidder eligibility: No liquidation or bankruptcy; must upload an undertaking confirming financial stability.
  • Drawings/process: Detailed Design Drawings must be approved by buyer; non-approval delays shift delivery without LD.

Key Specifications

  • Delivery address and scope include non-destructive testing (thermal/infrared) and hydraulic lifting/towing system fabrication

  • Estimated value not specified; quantity flexibility up to 25%

  • Engineering fabrication with Detailed Design Drawings within 10 days of award

  • 1-year warranty and service center network in each consignee state

  • Dedicated toll-free service support required

Terms & Conditions

  • Option Clause: quantity up to 25% with extended delivery time formula

  • 10-day drawing submission and 10-day buyer response cycle

  • 30-day establishment window for service centers if not existing

Important Clauses

Payment Terms

Not explicitly specified in tender; likely subject to standard Army procurement terms with milestone payments upon acceptance and service deliverables.

Delivery Schedule

Delivery starts after approval of Detailed Design Drawings; extension via option clause with minimum 30 days; extended delivery clamps to contracted rates.

Penalties/Liquidated Damages

Not detailed; implied penalties exist for delayed delivery or non-compliance with approved drawings and warranty terms.

Bidder Eligibility

  • No liquidation, court receivership, or bankruptcy filings

  • Demonstrated financial stability with supporting documents

  • Ability to establish functional service centre in each consignee state within 30 days

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Non destructive testing using thermal/ infrared technique , Oxygen purity check kit for field units , Hydraulic operated system for lifting and towing for Cheetah and Cheetal Heptr , Fabrication of missile launcher sml/mechanisum , Fabrication of Gun Amn feeding mechanisum , Aerodynamic analysis of balsa wood based model of cessna 175 skylark using wind tunnel , Flow visualisation using smoke or tufts for various shapes flat, shapes cylinder and dimpled sphere

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-8550786.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for relevant fabrication/engineering work

4

Financial statements / bankers’solvency certificate

5

EMD/Security deposit documentation (as applicable in tender terms)

6

Technical bid documents and compliance statements

7

OEM authorization / accreditation certificates (if applicable)

8

Detailed Design Drawings submission proof and approval correspondence

Financial Results

Rank Seller Price Item
L1
Hardik Decor(MII)   Under PMA
Item Categories : Non destructive testing using thermal/ infrared technique,Oxygen purity check kit for field units,H
L2
LM ENTERPRISES   Under PMA
Item Categories : Non destructive testing using thermal/ infrared technique,Oxygen purity check kit for field units,H
L3
Gupta & Sons   Under PMA
Item Categories : Non destructive testing using thermal/ infrared technique,Oxygen purity check kit for field units,H

Frequently Asked Questions

Key insights about TELANGANA tender market

How to bid for Indian Army Secunderabad tender with design approvals

Bidders must submit Detailed Design Drawings within 10 days of award, followed by a buyer review within 10 days. Ensure all drawings reflect the approved scope for hydraulic lifting systems and missile launcher components. Provide OEM authorizations if applicable and comply with the option clause up to 25% quantity variation.

What documents are required for Army procurement in Secunderabad 2025

Required documents include GST certificate, PAN, experience certificates, financial statements, EMD documentation, technical bid, OEM authorization, and Detailed Design Drawings proof. Prepare service-centre establishment evidence within 30 days and a dedicated toll-free service line record.

What are the technical specifications for the TGND CAD drawings in this tender

Technical specifics demand Detailed Design Drawings approved by the buyer, alignment with hydraulic lifting/towing system fabrication, and NDT testing capabilities (thermal/IR). Ensure drawings accommodate installation at MCEME, Secunderabad, with compliance to capacity and interface requirements in the scope document.

When is the delivery deadline if approval is delayed for drawings

Delivery is extended proportionally; however, if the buyer delays drawing approval, the final delivery date will be refixed accordingly without LD. Ensure tracking of approval timelines and maintain readiness to adjust production schedules as per revised dates.

What warranty terms apply to Army supplied equipment

A 1-year warranty starts from final acceptance or completion of installation/testing, whichever occurs later. The warranty covers defects and requires timely service support via the established center or on-site arrangements depending on the scope.

How to verify service centre requirements for the Secunderabad project

Bidder must demonstrate an existing functional service centre in the state of each consignee or commit to establishing one within 30 days of award. Payment release is contingent on documentary evidence of service capability readiness.

What is the scope of option clause in this Army tender

The purchaser may adjust quantity by up to 25% during contract; additional time is calculated as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. This enables flexible demand fulfillment while maintaining rates.

What are the eligibility criteria for financial standing in this bid

Bidders must not be under liquidation or bankruptcy; provide an undertaking on financial stability. Include financial statements and bank solvency proof to support eligibility for securing a multi-item, potentially high-value engineering contract for Secunderabad.