TenderDekho Logo
Active GEM

Western Railway Aerosol Fire-Detection & Suppression System Tender 2026 - RDSO 0192-2018 Non-Pyro, Wheel Mark

Bid Publish Date

25-Jul-2026, 9:52 am

Bid End Date

04-Aug-2026, 10:00 am

Location

RATLAM , MADHYA PRADESH

Progress

Issue25-Jul-2026, 9:52 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

20

Bid Type

Single Packet Bid

Key Highlights

  • RDSO/PE/SPEC/AC/0192-2018 (REV.1) compliance is mandatory
  • OEM makes: FIREPRO, STAT-X, PYROGEN or any other RDSO approved make
  • Wheel mark certification and marine suitability required for aerosol generator
  • 100 GM cartridge (1 No.) per unit with fixing arrangement
  • Installation, testing, commissioning, and training included in scope
  • Up to 25% quantity variation at contract performance with adjusted delivery
  • OEM warranty certificates to be submitted at the time of delivery
  • ATC requires exact Make and Model certification from the bidder

Tender Overview

Organization: Western Railway, a key Indian Railways unit. Product: Non-pyrotechnic fixed aerosol fire-detection and suppression system, including a 100 g cartridge (1 unit) with fixing arrangement, installed by the supplier. Location: Maharashtra region served by Western Railway. Estimated value/Quantity: Not disclosed; option clause allows up to 25% quantity variation. Unique differentiator: RDSO specification compliance (RDSO/PE/SPEC/AC/0192-2018 REV.1) and OEM authorization required; marine wheel mark certification for aerosol generator. Context: Procurement targets compliant, installable systems with post-installation support, per Annexure G1 and related RDSO directives.

Technical Specifications & Requirements

  • Non-pyrotechnic Fixed Aerosol Fire-Extinguishing System with automatic activation mechanism
  • Cartridge: 100 GM (1 No.) per unit, fixed with appropriate mounting arrangement
  • Compliance: RDSO SPEC: AC/0192-2018 (REV.1); RDSO letter EL/7.1.108 MSSBCD T. 17.09.2021; OEM makes FIREPRO/STAT-X/PYROGEN or any other RDSO approved make
  • Certification: Aerosol generator suitable for marine applications with wheel mark; test reports on demand confirming non-pyrotechnic/ non-explosive chemical usage
  • Installation scope: Supplier to cover installation, commissioning, and training; warranty as per specification; OEM warranty certificates required at delivery
  • Material/Construction: Category CONSTRUCTIONAL and GENERIC items; gross weight and housing material details to be verified per model
  • Documentation: GST advisory noted; bidder must upload required certificates for acceptance; ATC requires firm Make and Model certification

Terms, Conditions & Eligibility

  • Quantity flexibility: Up to 25% increase/decrease during contract and currency, with delivery timing adjusted accordingly
  • Certification/Make: RDSO approved makes only; OEM authorization mandatory; make and model certified in ATC
  • Warranties: OEM warranty to be submitted at delivery; post-installation service with installation, commissioning, training, and maintenance personnel
  • Documentation: GST registration guidance; bidder to supply experience certificates, financials, and test reports on demand; failure to provide certificates may lead to rejection
  • Compliance: All items must meet RDSO SPEC and be suitable for rail and marine use; supplier must ensure ongoing after-sales support in India

Key Specifications

  • Non-pyrotechnic fixed aerosol fire-extinguishing system with automatic activation

  • Cartridge capacity: 100 GM (1 No.) per unit

  • RDSO compatibility: AC/0192-2018 (REV.1) and related annexures

  • Approved makes: FIREPRO, STAT-X, PYROGEN or other RDSO approved makes

  • Wheel-mark certification and marine suitability for aerosol generator

  • Supply, installation, commissioning, and after-sales support by supplier

Terms & Conditions

  • Delivery quantity may vary up to 25% during contract and currency with adjusted timelines

  • OEM warranty certificates must be provided at delivery and installation included

  • RDSO-approved makes and Make/Model certification required in ATC

Important Clauses

Payment Terms

GST as per actuals; no specific advance terms stated; payment terms aligned with contract delivery milestones

Delivery Schedule

Delivery period linked to last date of original delivery order; extension applicable if option exercised with minimum 30 days

Penalties/Liquidated Damages

Details not explicitly stated; contract allows delivery extensions with option clause subject to conditions

Bidder Eligibility

  • RDSO approved makes for aerosol fire detection and suppression systems

  • OEM authorization or authorized dealer status

  • Ability to install, commission, and train railway personnel for the system

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Fixed Aerosol Fire - Extinguishing System (Q2)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Ratlam

Delivery Pincodes

457001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Isak Merchant457001,Sr.Material Manager, Diesel Store Depot, Diesel Shed, RatlamRatlamMadhya Pradesh4570012030-

Authority Records

MINISTRY OF RAILWAYSWESTERN RAILWAY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9660252.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
GENERIC Non Pyrotechnic Condensed Aerosol Generator Fixed Aerosol Fire-Extinguishing Systems Generally in compliance to NFPA:2010 and UL2775(UL Listed)
GENERIC Volume of the Room / enclosure for which system is suitable 0.9
GENERIC Non Pyrotechnic Automatic activation Mechanism Extinguishant Controller is capable of detecting fire by using the linear heat detection cable and activating the condensed aerosol fire extinguising units automatically, support one aerosol generator.
CONSTRUCTIONAL Gross Weight of the unit without bracket 100.0
CONSTRUCTIONAL Material of Aerosol Housing STAINLESS STEEL
CERTIFICATION Aerosol Generator should be suitable for marine applications with wheel mark Yes
CERTIFICATION Test Reports to be furnished to the buyer on demand including certification for chemical used being non pyrotechnic / non explosive Yes

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar aerosol systems supply/installation

4

Financial statements (audited) for the last 3 years

5

EMD/Security deposit (as applicable in tender terms)

6

Technical bid documents confirming compliance with RDSO 0192-2018

7

OEM authorization or authorized dealership proof

8

Manufacturer's technical specifications and warranty certificates

Frequently Asked Questions

How to bid for the aerosol fire suppression tender in Western Railway 2026?

Bidders must submit GST, PAN, financials, experience certificates, OEM authorization, and technical compliance to RDSO 0192-2018. Ensure OEM-approved make (FIREPRO/ STAT-X/ PYROGEN) and wheel-mark certification. Include installation, commissioning, and post-sale support details; provide 100 GM cartridge specifications and fixing arrangement per Annexure G1.

What are eligibility criteria for RDSO compliant aerosol system tender Western Railway?

Eligibility requires RDSO-approved makes, OEM authorization, proof of installation capability in India, and prior experience in similar rail aerosol systems. Submit warranty certificates, installation team details, and test reports confirming non-pyrotechnic chemistry. Ensure Make/Model certification in ATC and compliance with RDSO AC/0192-2018 REV1.

Which documents are mandatory for submission in this tender in Maharashtra?

Mandatory documents include GST certificate, PAN, audited financial statements, execution certificates for similar works, OEM authorization, technical compliance, and test reports on demand. Upload RDSO specification conformity documents and wheel-mark certification; ensure installation scope and after-sales support details are provided.

What does the 25% quantity option mean for the contract in Western Railway?

The purchaser may increase or decrease the bid quantity by up to 25% at contract placement and during the contract period. Delivery timing will adjust based on the ratio of increased/decreased quantity, with a minimum extension of 30 days if the original period is longer than 30 days.

What are the key standards and certifications required for the aerosol system?

Key standards include RDSO SPEC AC/0192-2018 (REV.1) and Annexure G1 requirements; wheel-mark certification for marine suitability; OEM warranty certificates; and a confirmation of non-pyrotechnic chemical usage in test reports as demanded by the buyer.

Who can supply and install the aerosol fire-detection system for Western Railway?

Only OEMs or their authorized dealers/sub-dealers with RDSO-approved makes (FIREPRO/STAT-X/PYROGEN or others) are eligible. The supplier must install, commission, train, and provide after-sales support across India, with OEM warranties documented at delivery.

What installation scope is expected from the successful bidder?

The bidder must supply and install the fixed aerosol system, perform commissioning, training, and provide maintenance support. Installation must conform to Annexure G1, with cartridge handling, mounting, and system integration included in the service package.

How is payment structured for the Western Railway aerosol tender 2026?

Payment terms align to contract milestones and GST applicability. Specific advance or milestone percentages are not stated; bidders should prepare to submit invoices on delivery/completion milestones and await clear terms in the final contract.