KNUCKLE BEARING FOR STLN,FIELD COIL 24V FOR STLN,SPEEDOMETER CABLE FOR STLN,CLUTCH PLATE FOR STLN,S
Indian Army
WEST TRIPURA, TRIPURA
Progress
Quantity
13
The Indian Army (Department Of Military Affairs) invites bids for multiple spare parts including Water Pump Assembly for TMB 3.5 Ton, Solenoid Switch for TATA 2.5 Ton, Speedometer Cable for TATA 2.5 Ton, Battery Cut off Switch for TMB 3.5 Ton, Field Coil Assembly for TMB 3.5 Ton, Combination Switch for STLN, Coolant Pump for STLN, Cable Speedometer for Maruti Gypsy, and Chain Sprocket Kit for Royal Enfield Motorcycle. The BOQ lists 9 items in total with unspecified quantities, and the estimated value is not disclosed. The buyer reserves a 25% quantity variation during procurement and contract execution, with delivery time calculations anchored to the original schedule. This tender targets OEMs and suppliers capable of providing automotive electrical and mechanical components to defense logistics, with standard compliance and delivery discipline as differentiators.
Product/service names and categories as listed in BOQ
Estimated value and EMD amount not disclosed in the summary data
Delivery period calculated from date of original delivery order with 30-day minimum extension
No explicit IS/ISO standards provided; bidders should seek alignment with defense procurement quality expectations
Warranty/AMC details not provided; verify in final tender documents
Quantity variation up to 25% during contract; price remains at contracted rates
Delivery timelines anchored to original order; extension rules apply with minimum 30 days
EMD and specific submission documents to be confirmed in official bid documents
Not specified in the data; bidders should obtain exact payment schedule and milestones from the RFP.
Delivery period starts from the last date of original delivery order; extended time proportional to quantity variation with minimum 30 days.
No LD details provided here; expect standard defense procurement penalties in final terms.
Experience in supplying automotive spare parts to defense or large fleet operators
Demonstrated OEM authorizations or authorized dealership status
Ability to meet delivery schedules with traceability and post-sale support
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
WEST TRIPURA, TRIPURA
Indian Army
BATHINDA, PUNJAB
Indian Army
BATHINDA, PUNJAB
Indian Army
SRINAGAR, JAMMU & KASHMIR
Indian Army
BATHINDA, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Water Pump Assembly for TMB 3.5 Ton | Water Pump Assembly for TMB 3.5 Ton | 1 | pieces | 988adregtsmwksp.gem.in | 15 |
| 2 | Solenoid Switch for TATA 2.5 Ton | Solenoid Switch for TATA 2.5 Ton | 2 | pieces | 988adregtsmwksp.gem.in | 15 |
| 3 | Speedometer Cable for TATA 2.5 Ton | Speedometer Cable for TATA 2.5 Ton | 2 | pieces | 988adregtsmwksp.gem.in | 15 |
| 4 | Battery Cut off Switch for TMB 3.5 Ton | Battery Cut off Switch for TMB 3.5 Ton | 1 | pieces | 988adregtsmwksp.gem.in | 15 |
| 5 | Field Coil Assembly for TMB 3.5 Ton | Field Coil Assembly for TMB 3.5 Ton | 1 | pieces | 988adregtsmwksp.gem.in | 15 |
| 6 | Combination Switch for STLN | Combination Switch for STLN | 2 | pieces | 988adregtsmwksp.gem.in | 15 |
| 7 | S oblique A pump Coolent for STLN | S oblique A pump Coolent for STLN | 1 | pieces | 988adregtsmwksp.gem.in | 15 |
| 8 | Cable Speedometer for Maruti Gypsy | Cable Speedometer for Maruti Gypsy | 2 | pieces | 988adregtsmwksp.gem.in | 15 |
| 9 | Chain Sprocket Kit for Motor Cycle Royal Enfield | Chain Sprocket Kit for Motor Cycle Royal Enfield | 1 | pieces | 988adregtsmwksp.gem.in | 15 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates from similar automotive spare parts supply
Financial statements (last 2-3 years)
EMD/Security deposit documents (as specified in Terms & Conditions)
Technical bid documents and compliance statements
OEM authorization or Authorized distributor certificate
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | BANSAL HARDWARE STORE Under PMA | - | 28-10-2025 14:31:13 | Qualified |
| 2 | M/S GOODWILL ENTERPRISES Under PMA | - | 03-11-2025 12:44:53 | Qualified |
| 3 | S S SALES Under PMA | - | 28-10-2025 15:06:46 | Qualified |
| 4 | SAKSHAM TRADERS Under PMA | - | 02-11-2025 18:00:32 | Qualified |
| 5 | SINGH TRADERS Under PMA | - | 01-11-2025 14:35:40 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | S S SALES( MSE Social Category:General ) Under PMA | ₹21,943 | Item Categories : Water Pump Assembly for TMB 3.5 Ton,Solenoid Switch for TATA 2.5 Ton,Speedometer Cable for TATA 2.5 |
| L2 | M/S GOODWILL ENTERPRISES( MSE Social Category:General ) Under PMA | ₹29,240 | Item Categories : Water Pump Assembly for TMB 3.5 Ton,Solenoid Switch for TATA 2.5 Ton,Speedometer Cable for TATA 2.5 |
| L3 | SAKSHAM TRADERS( MSE Social Category:General ) Under PMA | ₹30,235 | Item Categories : Water Pump Assembly for TMB 3.5 Ton,Solenoid Switch for TATA 2.5 Ton,Speedometer Cable for TATA 2.5 |
| L4 | BANSAL HARDWARE STORE( MSE Social Category:General ) Under PMA | ₹31,065 | Item Categories : Water Pump Assembly for TMB 3.5 Ton,Solenoid Switch for TATA 2.5 Ton,Speedometer Cable for TATA 2.5 |
| L5 | SINGH TRADERS( MSE Social Category:General ) Under PMA | ₹39,071 | Item Categories : Water Pump Assembly for TMB 3.5 Ton,Solenoid Switch for TATA 2.5 Ton,Speedometer Cable for TATA 2.5 |
Key insights about PUNJAB tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD, OEM authorizations, and technical compliance documents through the official portal. Ensure OEM mapping for items like Water Pump Assembly for TMB 3.5 Ton and Solenoid Switch for TATA 2.5 Ton, with delivery capability confirmed.
Required documents typically include GST certificate, PAN, 3-year financials, experience certificates for similar supply, OEM authorization, technical bid, and EMD proof. Ensure all documents are valid and matched to the listed components such as Speedometer Cable and Battery Cut Off Switch.
Delivery terms permit up to 25% quantity variation during contract and currency, with the delivery period calculated from the last date of the original order. If extended, additional time equals (increased quantity/original quantity) × original delivery period, minimum 30 days.
Though not specified here, bidders should expect OEM authorizations and quality compliance, potentially ISI/ISO equivalents, and traceability documentation. Verify exact standards in the final RFP and ensure conformity for items like Combination Switch for STLN.
The EMD is not specified in the provided data; bidders should prepare according to the standard defense procurement framework, typically a fixed monetary value or percentage of estimated value, as clarified in the official bid documents.
BOQ items cover Water Pump Assembly for TMB 3.5 Ton, Solenoid Switch for TATA 2.5 Ton, Speedometer Cable for TATA 2.5 Ton, Battery Cut Off Switch for TMB 3.5 Ton, Field Coil Assembly for TMB 3.5 Ton, Combination Switch for STLN, Coolant Pump for STLN, Cable Speedometer for Maruti Gypsy, Chain Sprocket Kit for Royal Enfield.
The purchaser may increase or decrease bid quantity by up to 25% at contract placement and during currency, at contracted rates, with delivery timelines adjusted accordingly as per the option clause.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS