Bid Publish Date
30-Aug-2026, 5:11 pm
Bid End Date
24-Sep-2026, 2:00 pm
Location
Progress
Indian Space Research Organization (ISRO), Department of Space, invites bids for the supply of an Electric Senior Sigree with Frying Pan and SS Lid, including Brazing Pan, Rice Boiler, Milk Boiler and Tea Boiler at ISRO facilities in Thiruvananthapuram, Kerala. Scope includes Supply, Installation, Testing and Commissioning of the specified equipment. The contract allows a quantity variation of up to 25% during placement and within currency, with delivery timing calculated as (Increase in quantity / Original quantity) × Original delivery period, minimum 30 days. Bids must include a Data Sheet matching product specifications and OEM authorization if applicable.
Target: Precise product set, location, and delivery framework; no fixed start/end dates disclosed; price flexibility via option clause; emphasis on compliance with provided data sheets and supplier credentials.
Product set: Electric Senior Sigree with Frying Pan and SS Lid; Brazing Pan; Rice Boiler; Milk Boiler; Tea Boiler
Scope: Supply, Installation, Testing and Commissioning included
Delivery clause: up to 25% quantity variation; minimum 30 days delivery after extended period
Data Sheet alignment mandatory; mismatch may lead to bid rejection
OEM authorization required for non-manufacturer bids
Option clause enables +/-25% quantity adjustment during and after contract award
Delivery period based on original schedule with minimum 30 days for extra quantity
Bid must include Data Sheet alignment and Manufacturer/OEM authorization
Not specified in the tender data; bidders should anticipate standard government terms or negotiate during contract finalization
Delivery period commences from last date of original delivery order; extended delivery time based on option clause with minimum 30 days
Applicable if seller fails to deliver, or delays beyond stipulated delivery period; termination rights reserved by purchaser
Legal entity with capacity to supply ISRO-grade cooking equipment
No liquidation or bankruptcy proceedings against bidder
Ability to provide OEM authorization and data sheet verification
Quantity
23
Category
Rice Boiler
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Item wise evaluation
Inspection Required
No
Tech Clarification Time
4 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
OEM Avg. Turnover
75
Warranty Period
2 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Electric Senior Sigree with Frying Pan and SS Lid , Brazing Pan , Rice Boiler , Milk Boiler , Tea Boiler
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
26
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Thiruvananthapuram
Delivery Pincodes
695022
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jomin Jose | 695022,CENTRAL STORES, RFF AREA, VIKRAM SARABHAI SPACE CENTRE, ISRO PO | Thiruvananthapuram | Kerala | 695022 | 9 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Electric Senior Sigree with Frying Pan and SS Lid
Electric Senior Sigree with Frying Pan and SS Lid
Brazing Pan
Brazing Pan
Rice Boiler
Rice Boiler
Milk Boiler
Milk Boiler
Tea Boiler
Tea Boiler
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Electric Senior Sigree with Frying Pan and SS Lid | Electric Senior Sigree with Frying Pan and SS Lid | 9 | no | vsscgems | 120 | |
| 2 | Brazing Pan | Brazing Pan | 6 | no | vsscgems | 120 | |
| 3 | Rice Boiler | Rice Boiler | 4 | no | vsscgems | 120 | |
| 4 | Milk Boiler | Milk Boiler | 2 | no | vsscgems | 120 | |
| 5 | Tea Boiler | Tea Boiler | 2 | no | vsscgems | 120 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar supply projects
Financial statements / solvency undertaking
Data Sheet of offered product(s) uploaded with bid
Manufacturer Authorization / OEM authorisation details
Bid security deposit or EMD proof as applicable
Technical bid / Compliance certificates
Key insights about KERALA tender market
To participate in the ISRO electric cooking equipment tender in Thiruvananthapuram, bidders must submit GST, PAN, experience certificates, financial statements, EMD, and OEM authorizations. Ensure Data Sheet alignment with offered equipment and verify manufacturer details before submission. Adhere to option-quantity terms and installation scope.
Bidders must provide GST certificate, PAN card, experience certificates for similar supply, financial statements or solvency undertaking, EMD proof, Data Sheet, OEM authorization, and technical bid documents. Ensure data sheet matches the offered sigree, brazing pan and boilers and include installation details.
Technical scope includes Electric Senior Sigree with Frying Pan and SS Lid, plus Brazing Pan, Rice Boiler, Milk Boiler and Tea Boiler. The bid requires data-sheet alignment, installation, testing and commissioning. No fixed IS standards are listed; ensure OEM authorization and supplier capability to deliver complete setup.
Delivery period is determined by the original delivery order; extended periods may apply via the option clause. Any increase in quantity requires minimum 30 days additional time, ensuring timely installation, testing and commissioning across all five items.
Eligible bidders must avoid liquidation or bankruptcy, provide an undertaking of financial stability, secure OEM authorization when bidding through distributors, and confirm Data Sheet consistency with the offered equipment. Demonstrate prior experience in supplying similar cooking equipment.
Payment terms are not explicitly stated; typical government tenders require milestone-based payments tied to delivery and commissioning. Bidders should expect performance verification during installation and testing, with compliance to data sheet and OEM authorization as prerequisites for contract finalization.