Location
Progress
Indian Army has released a public tender for item 1, item 2, item 3, item 4, item 5, item 6, item 7, item 8, item 9, item 10, item 11, item 12, item 13, item 14, item 15, item 16, item 17, item 18, item 19, item 20, item 21, item 22 in KANCHIPURAM, TAMIL NADU. Quantity: 1518. Submission Deadline: 15-10-2026 14: 00: 00. Download documents and apply online.
Quantity
1518
Category
item 1
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Past Performance
50 %
Warranty Period
3 days
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
item 1 , item 2 , item 3 , item 4 , item 5 , item 6 , item 7 , item 8 , item 9 , item 10 , item 11 , item 12 , item 13 , item 14 , item 15 , item 16 , item 17 , item 18 , item 19 , item 20 , item 21 , item 22
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
14
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Kanchipuram
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Kanchipuram | Kanchipuram | - | - | 3 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
item 1
chiller unit
item 2
ahu unit
item 3
pumps
item 4
chilled water piping
item 5
valves
item 6
ducting
item 7
ducting
item 8
existing chiller unit
item 9
existing ahu units
item 10
existing ducts
item 11
indoor lt panel board
item 12
excavation in trenches
item 13
excavated soil
item 14
removal of surplus soil
item 15
bitumen macadam or concret foot path
item 16
cable xlpe insulated
item 17
lt ug cable route
item 18
dwc hdpe pipe
item 19
earthing
item 20
earth continuity conductor
item 21
maintenance free earthing with earth electrode
item 22
copper strip
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | item 1 | chiller unit | 3 | each | geaft@e3 | 180 | |
| 2 | item 2 | ahu unit | 2 | each | geaft@e3 | 180 | |
| 3 | item 3 | pumps | 2 | each | geaft@e3 | 180 | |
| 4 | item 4 | chilled water piping | 56 | rm | geaft@e3 | 180 | |
| 5 | item 5 | valves | 21 | each | geaft@e3 | 180 | |
| 6 | item 6 | ducting | 290 | sqm | geaft@e3 | 180 | |
| 7 | item 7 | ducting | 110 | sqm | geaft@e3 | 180 | |
| 8 | item 8 | existing chiller unit | 3 | each job | geaft@e3 | 180 | |
| 9 | item 9 | existing ahu units | 2 | each job | geaft@e3 | 180 | |
| 10 | item 10 | existing ducts | 350 | sqm | geaft@e3 | 180 | |
| 11 | item 11 | indoor lt panel board | 1 | each job | geaft@e3 | 180 | |
| 12 | item 12 | excavation in trenches | 65 | cum | geaft@e3 | 180 | |
| 13 | item 13 | excavated soil | 58 | cum | geaft@e3 | 180 | |
| 14 | item 14 | removal of surplus soil | 7 | cum | geaft@e3 | 180 | |
| 15 | item 15 | bitumen macadam or concret foot path | 20 | rm | geaft@e3 | 180 | |
| 16 | item 16 | cable xlpe insulated | 240 | rm | geaft@e3 | 180 | |
| 17 | item 17 | lt ug cable route | 10 | each | geaft@e3 | 180 | |
| 18 | item 18 | dwc hdpe pipe | 230 | rm | geaft@e3 | 180 | |
| 19 | item 19 | earthing | 6 | each job | geaft@e3 | 180 | |
| 20 | item 20 | earth continuity conductor | 30 | rm | geaft@e3 | 180 | |
| 21 | item 21 | maintenance free earthing with earth electrode | 2 | each job | geaft@e3 | 180 | |
| 22 | item 22 | copper strip | 10 | rm | geaft@e3 | 180 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer