Bid Publish Date
23-Jul-2026, 8:33 pm
Bid End Date
14-Aug-2026, 4:00 pm
Value
₹1,79,36,000
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow. Procurement: Design, Supply, Installation, Commissioning and Maintenance of a Grid Connected Ground Mounted Solar Power Plant. Location: Kanpur Nagar, Uttar Pradesh 208001. Estimated Value: ₹17,936,000. Scope includes end-to-end solar plant services with self-owned deployment; BOQ contains 0 items. A 25% scope/duration variation is permitted via the Buyer clause; vendor must review attached SOW/ATC documents. This tender requires formal alignment to UP government procurement norms. Unique aspect: absence of listed BOQ items suggests a flexible turnkey approach under government supervision.
Project: grid-connected ground-mounted solar power plant
Scope: design, supply, installation, commissioning, and maintenance
BOQ: 0 items at present; final scope defined in SOW/ATC
EMD: not specified in available data; verify in tender attachments
Standards/certifications: not listed in provided data; to be confirmed in ATC/SOW
Delivery/installation: to be confirmed in SOW; no explicit deadlines published in data
25% variation in quantity or duration permitted by buyer at contract issuance and post-issuance
SOW and ATC attachments govern detailed scope and eligibility
BOQ currently empty; final itemization to be defined during procurement process
Details not provided in the data; refer to ATC/SOW for milestone-based or lump-sum payment structure.
No explicit deadlines present in the available data; consult SOW/ATC for installation and commissioning timelines.
No LD figures disclosed; confirm in ATC/SOW and contract documents.
Experience in design, supply, installation and maintenance of solar power plants
Financial capacity to support a project valued around ₹17.94 million
Compliance with UP government procurement norms and OEM authorizations
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Ground Mounted Solar Power Plant Service - To be assessed; To be assessed; Self- owned
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Kanpur Nagar
Delivery Pincodes
208020
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Ajay Kumar Dwivedi | 208020,Panki Thermal Power Plant, Panki | Kanpur Nagar | Uttar Pradesh | 208020 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for prior solar power plant projects
Financial statements / audited balance sheet (last 2 years)
EMD/Security deposit documents (as specified in ATC/ITC)
Technical bid documents and compliance certificates (as per ATC/SOW)
OEM authorizations / prior supplier approvals (if applicable)
Any other documents explicitly required in the SOW/ATC
Key insights about UTTAR PRADESH tender market
Bidders should first review the SOW/ATC attachments for scope, then prepare documents including GST, PAN, experience certificates, and financial statements. Ensure compliance with UP government procurement norms, and confirm any OEM authorizations. The contract allows a 25% variation in quantity or duration.
Required documents include GST certificate, PAN card, 2 years of financials, experience certificates for solar projects, EMD documentation per ATC, technical bid and OEM authorizations. Ensure compliance with SOW/ATC requirements and upload through the official portal.
No explicit technical specs are listed in the provided data. Detailed requirements will come from the SOW/ATC attachments. Bidders should obtain and study these documents to align with the grid connection, plant capacity and commissioning criteria.
The estimated value is ₹17,936,000. Bidders should prepare cost proposals aligned with this value and verify any scope changes allowed under the 25% variation clause in the buyer terms.
Specific payment terms are not disclosed in the data; refer to ATC/SOW for milestone-based or lumpsum payments, and confirm any advance against delivery and payment timelines within the contract.
The EMD amount is not specified in the provided data. Bidders must check the SOW/ATC attachments or tender portal for the exact EMD figure and submission method.
No explicit deadlines are listed in the available data. The SOW/ATC will define installation, commissioning milestones and acceptance criteria; bidders should prepare timelines accordingly and align with project kickoff dates.
Eligibility includes prior solar plant experience, financial capability to support a ₹17.94 million project, GST/PAN compliance, and adherence to UP procurement norms; OEM authorizations may also be required per SOW.