TenderDekho Logo
Active GEM

Rashtriya Ispat Nigam Limited Procurement Tender GEM 2026 Visakhapatnam - Delivery Variance & ATC Standards

Bid Publish Date

28-Sep-2026, 9:40 am

Bid End Date

13-Oct-2026, 10:00 am

Generate Docs

Progress

Issue28-Sep-2026, 9:40 am
Corrigendum08-Oct-2026
AwardPending

Tender Overview

Rashtriya Ispat Nigam Limited (RINL), Visakhapatnam, issues a GEM tender for material supply across multiple NIT categories. The contract contemplates a potential 25% quantity variation both at award and during currency, with delivery timing linked to the last delivery order. The ATC requires bidders to align with RINL’s specified material scope, provide model/catalogue details, and ensure no deviation from the agreed offer content. The tender emphasizes appointment of a supplier capable of meeting production-driven delivery schedules and responding to production/storage dynamics at VSP. A strong emphasis on delivery punctuality and schedule adherence differentiates compliant bids. This procurement is positioned as a supply contract requiring precise compliance with buyer-specified scope and delivery windows.

Technical Specifications & Requirements

  • Delivery schedule flexibility: up to 25% additional quantity, with extension calculations: (additional quantity ÷ original quantity) × original delivery period, min 30 days; may extend to original delivery period.
  • Make/model declaration: bidders must specify exact Make/Model and upload technical catalogues; deviations will be rejected.
  • ATC alignment: offers must conform to RINL material specifications; changes to scope not entertained; delivery timeline per GEM Bid Document; LOA/GEM contract date governs start.
  • Documentation footprint: bidders should anticipate uploading product literature and certifications within the bid; no contradictions with catalogues outside the bid will be considered.
  • Quantity awareness: tender includes 9 items in BOQ, though item-level quantities are not disclosed in the provided data.

Terms, Conditions & Eligibility

  • Delivery timing: tentative schedules set by RINL-VSP; delivery remains essential and can be revised based on production/storage needs.
  • Quantity adjustment: option clause allows ± up to 25% change during contract; additional time calculated per formula with a minimum of 30 days.
  • ATC compliance: bidders must adhere to buyer-specified terms; supply of offered make/model only; catalogue consistency is mandatory.
  • Bid evaluation: schedule alignment with VSP delivery requirements is critical; offers not meeting delivery schedules may be rejected.
  • Communication: contact email: [email protected] for bid-specific inquiries.
  • No scope changes: pressure to maintain scope as per provided specification documents; deviations are not typically considered.

Key Specifications

    • Product/Category: Material supply for multiple items under 9 BOQ entries (exact items not specified in data).
    • Delivery: Schedules released by RINL-VSP; delivery date anchored to LOA/GEM contract; potential revision based on production/storage needs.
    • EMD/Financials: Not disclosed in the data; bidders should prepare standard EMD as per GeM terms (not specified).
    • Quality/Documentation: Must upload Make/Model, technical catalogues; ensure no contradictions with bidder-submitted catalogues.
    • ATC/Scope: No change in scope; adherence to buyer-specified specifications per ATC.

Terms & Conditions

  • Delivery may be increased by up to 25%; extended time calculated with minimum 30 days.

  • Bidders must provide exact Make/Model and attach technical literature; deviations rejected.

  • ATC requires compliance with RINL material specifications; no scope changes accepted.

Important Clauses

Payment Terms

Not disclosed in provided data; typical GeM terms apply; payment terms to be confirmed with LOA/GEM contract.

Delivery Schedule

Delivery shall be as indicated by RINL-VSP per GEM Bid Document; extended schedules possible without financial implication.

Penalties/Liquidated Damages

Not specified in data; subject to contract terms and delivery adherence.

Bidder Eligibility

  • Experience in supplying similar materials to large steel/mfg buyers

  • Demonstrated capability to meet strict delivery schedules

  • Valid GST and financial stability with auditable statements

Advertisement

Tender Data

Bid Details

Quantity

670

Category

3034928

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Item wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

3034928 , 3034929 , 3034922 , 3034932 , 3034926 , 3034931 , 3034927 , 3034921 , 3034913

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Visakhapatanam

Delivery Pincodes

530031

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ramachandra Rao Damma530031,CENTRAL STORES BUILDING VISAKHAPATNAM STEEL PLANTVisakhapatanamAndhra Pradesh53003110060-

Authority Records

MINISTRY OF STEELRASHTRIYA ISPAT NIGAM LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9951597.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Visakhapatnam Steel Plant

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

08-Oct-2026

Extended Deadline

13-Oct-2026, 4:30 am

Opening Date

14-Oct-2026, 4:30 am

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

3034928

FE-MN STD. SAMPLE,ECRM 583-1

100 grams Delivery: 60 days
#2

3034929

FE-MN STD. SAMPLE,NCS HC28629

50 grams Delivery: 60 days
#3

3034922

FE-MN STD. SAMPLE,NCS HC25620

50 grams Delivery: 60 days
#4

3034932

FE-MN STD. SAMPLE,NCS HC25621

50 grams Delivery: 60 days
#5

3034926

FE-MN STD. SAMPLE,ECRM 502-2

100 grams Delivery: 60 days
#6

3034931

FE-MN STD. SAMPLE,NCS HC11602B

70 grams Delivery: 60 days
#7

3034927

FE-MN STD. SAMPLE,NCS HC28625

50 grams Delivery: 60 days
#8

3034921

FE-MN STD. SAMPLE,NCS HC37611

50 grams Delivery: 60 days
#9

3034913

FE-MN STD. SAMPLE,JSS 701-7

150 grams Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar material supply

4

Financial statements (latest audited / equivalent)

5

EMD/Security deposit documentation

6

Technical bid documents with Make/Model specifications

7

OEM authorizations or dealership certificates (where applicable)

8

Product literature or technical catalogues/brochures

9

Any ISO/quality certifications relevant to supplied materials

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to participate in RINL Visakhapatnam GEM tender 2026 for material supply

To participate, bidders must register on GeM, submit GST and PAN, provide experience certificates for similar supply, attach technical catalogues for the offered Make/Model, and ensure adherence to RINL ATC. Prepare EMD as per GeM rules and align with delivery schedules set by RINL-VSP.

What are the delivery schedule terms for the RINL VSP tender 2026

Delivery schedules follow the LOA/GEM contract dates; RINL may revise timelines based on production/storage needs. An order quantity may be increased by up to 25%, with extended time calculated as (additional ÷ original) × original period, minimum 30 days.

Which documents are required for bidder submission in this RINL tender

Required documents include: GST certificate, PAN, experience certificates for similar work, financial statements, EMD documentation, technical bid with Make/Model, OEM authorizations if applicable, and product literature or catalogues to verify specifications.

What are the key ATC compliance requirements for RINL tender

Bidders must adhere to the specified Make/Model and supply catalogue; no scope changes are allowed. The bid must conform to RINL material specifications; deviations documented outside the bid will be rejected during evaluation.

What is the scope of quantity variation under RINL ATC terms

The purchaser may increase/decrease quantity up to 25% of the bid quantity at contract award and during currency, with delivery time adjusted by the stated formula and a minimum of 30 days.

What documents prove eligibility for RINL material supply tender in Visakhapatnam

Eligibility proofs include GST, PAN, audited financial statements, relevant experience certificates, and OEM/authorized dealer certificates; ensure consistent Make/Model and catalogue alignment with bid materials.

When is the delivery deadline for tender in Visakhapatnam

Delivery deadlines are tied to LOA/GEM contract dates issued by RINL-VSP; schedules may be revised by the buyer, and timely delivery is deemed essential to contract performance.

What are the essential payment terms likely for this RINL procurement

Payment terms will follow GeM/RINL contract norms; expect standard submission of invoices after delivery, subject to verification of quantities, quality and conformity to the Make/Model specifications.