TenderDekho Logo
Active GEM

Southern Railway HRC Fuse Conforming to IS/IEC 60269 Part 2 2026 Procurement

Bid Publish Date

30-Jul-2026, 11:33 am

Bid End Date

10-Aug-2026, 9:00 am

Progress

Issue30-Jul-2026, 11:33 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

200

Bid Type

Single Packet Bid

Key Highlights

  • Conformity requirement: IS/IEC 60269 (Part 2) for HRC fuses
  • Bulk order eligibility contingent on standard compliance and BIS certification
  • Material Test Certificate mandatory with each supply
  • 1-year warranty from final acceptance; OEM warranty certificates required
  • Delivery quantity can vary up to 25% during contract; minimum 30-day extension
  • Liquidated damages for delays and defaulted supply; security deposit-based recovery
  • Option clause governs extended delivery periods and adjusted timelines
  • Emphasis on lab verification as acceptance criterion for items

Categories 1

Tender Overview

Southern Railway invites bids for the supply of HRC fuses conforming to IS/IEC 60269 (Part 2), with bulk order eligibility and BIS certification requirements. The scope is supply-only, with a 1-year warranty from final acceptance at consignee location. The option clause allows up to 25% quantity variation during contract execution, with delivery time recalculated per the formula and a minimum extension of 30 days. A material test certificate must accompany each delivery, and conformity to the IS/IEC standard qualifies bidders for bulk order consideration. The project emphasizes supplier reliability, compliance with safety standards, and performance under railway operating conditions.

Keywords to guide bidders include IS/IEC 60269 (Part 2) conformity, bulk order eligibility, and BIS certification, highlighting the need for standard-compliant, traceable manufacturing. This tender fits procurement needs of the Southern Railway for robust, standards-based protection devices and emphasizes quality assurance through lab-tested materials and post-sale support.

Technical Specifications & Requirements

  • Standard: IS/IEC 60269 (Part 2) conformity required for HRC fuses; bulk order eligibility depends on compliance.
  • Certification: BIS certificate to be submitted along with the bid; OEM authorisation may be required per terms.
  • Documentation: Material Test Certificate to be sent with supply; buyer lab results will drive acceptance.
  • Warranty: 1-year warranty from final acceptance or after commissioning; OEM warranty certificates demanded at delivery.
  • Delivery & Scope: Supply-only; delivery terms reference quantity adjustments up to 25%; penalties via liquidated damages if delivery obligations are not met.
  • Damage & Penalties: Damages equal to security deposit for non-compliance; LDs apply for delayed execution beyond original delivery period.

Terms, Conditions & Eligibility

  • EMD/Financials: Not specified in data; bidders should prepare typical security/EMD as per ISPE terms.
  • Delivery: Delivery period ties to original order with option extension mechanics; minimum extension 30 days.
  • Payment: Payment terms not explicitly stated; LDs apply for contract defaults or delayed delivery.
  • Quality: Material Test Certificate mandatory; acceptance based on buyer lab results.
  • Warranty: 1-year warranty from acceptance with requirement to provide OEM warranty certificates at delivery.
  • Other: Conformity to IS/IEC 60269 (Part 2) and BIS certification are critical eligibility criteria for bulk orders.

Key Specifications

    • Product: HRC fuse conforming to IS/IEC 60269 (Part 2)
    • Scope: Supply only; no installation services mentioned
    • Quality proof: Material Test Certificate with every supply batch
    • Certification: BIS certificate required; OEM authorisation if mandated
    • Warranty: 1 year from final acceptance; OEM warranty certificates at delivery
    • Delivery flexibility: up to 25% quantity variation with formula-based extension

Terms & Conditions

  • Option clause allows quantity variation up to 25% during contract

  • Delivery extensions calculated by (Increased quantity ÷ Original quantity) × Original delivery period

  • Material Test Certificate mandatory; acceptance based on buyer lab results

  • IS/IEC 60269 (Part 2) conformity required for bulk orders with BIS certification

  • 1-year warranty from final acceptance; OEM warranty documentation required

Important Clauses

Payment Terms

Liquidated damages apply for delayed delivery; damages equal to security deposit for defaulted orders

Delivery Schedule

Delivery period starts after original delivery order; extension via option clause with minimum 30 days

Penalties/Liquidated Damages

Damages for non-compliance and delayed supply; security deposit recovery mechanism

Bidder Eligibility

  • Conformity to IS/IEC 60269 (Part 2) for HRC fuses

  • Valid BIS certification at bid submission

  • Material Test Certificate accompanying each supply

  • OEM authorisation if required by the buyer

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

HRC (High Rupturing Capacity) Fuse Conforming to IS/IEC 60269 (Part 2) (Q3)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Tiruchirappalli

Delivery Pincodes

620004

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mariraj Karuppasamy620004,Office of the Divisional Electrical Engineer / General Golden Rock , Tiruchirapalli 620004TiruchirappalliTamil Nadu62000420030-

Authority Records

MINISTRY OF RAILWAYSSOUTHERN RAILWAY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-9679224.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

OEM authorisation (if applicable)

4

Material Test Certificate for each lot

5

BIS certificate (valid) to be submitted with bid

6

Technical compliance certificates demonstrating IS/IEC 60269 (Part 2) conformity

7

Proof of establishment for warranty and support

8

Experience certificates and financial statements (as per tender norms)

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for HRC fuse tender in Southern Railway 2026

Submit bids with IS/IEC 60269 (Part 2) conformity, BIS certificate, and Material Test Certificate. Ensure OEM authorisation if required, and provide 1-year warranty documentation. Include bid pricing for supply-only scope and readiness to accept up to 25% quantity variation with extension terms.

What documents are required for HRC fuse bid in Southern Railway

Provide GST registration, PAN, BIS certificate, Material Test Certificate, OEM authorisation (if applicable), technical compliance certificates, and experience/financial statements. Ensure warranty certificates from OEM are attached at delivery and that lab verification criteria are met.

What standards govern HRC fuse procurement for Southern Railway 2026

Bids must conform to IS/IEC 60269 (Part 2) for HRC fuses and carry a valid BIS certificate. Material Test Certificates must accompany delivery, and buyer lab results determine acceptance. Warranty provisions include a 1-year period from final acceptance.

When is delivery deadline and extension policy for fuse tender

Delivery period begins after the original delivery order; option clause allows up to 25% quantity variation. Extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days.

What are the penalties for late supply in Southern Railway fuse tender

Liquidated damages apply for delayed delivery; damages equal to the security deposit of the defaulted order. Failure to supply under contract conditions permits recovery of security deposit as damages.

What warranty is required for HRC fuses in this tender

A 1-year warranty from final acceptance or post-installation testing, with OEM warranty certificates required at delivery. The seller must guarantee rectification of goods during the warranty period.

Is bulk order eligibility dependent on BIS and IS/IEC conformity

Yes. Conformity to IS/IEC 60269 (Part 2) is eligible for bulk orders, and bidders must submit a valid BIS certificate along with the bid to qualify for large-volume procurement.

What is the scope of supply for this fuse tender in 2026

The scope is strictly supply of HRC fuses; there is no installation or commissioning required as per current terms, with delivery at consignee location following performance verification.