Bid Publish Date
27-May-2026, 6:10 pm
Bid End Date
31-Jul-2026, 6:00 pm
EMD
₹10,000
Value
₹10,97,788
Location
Progress
Quantity
50305
Category
OH of Main steam line valve V2 6
Bid Type
Two Packet Bid
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) in Lucknow invites bids for comprehensive overhauling and replacement work on a wide range of steam line valves and related components across multiple units in Sonbhadra, Uttar Pradesh (postal code 231205). Estimated contract value is ₹10,97,788 with an EMD of ₹10,000. The scope includes overhaul, cutting, welding, replacement of HP/LP valves, NRVs, safety valves, pipe joints, hangers, condensate lines, and associated actuators. The contract supports 62 BOQ items with extensive valve-related servicing across multiple plant sections. The procurement emphasizes field maintenance, safety-compliant repairs, and rapid turnaround from order date.
Key differentiators include a broad scope of valve maintenance activities (from 15 mm to 300 mm), potential quantity variations under an option clause, and a delivery window that may extend with the option clause. Bidders should prepare for multi-location work and on-site execution under stringent safety guidelines.
Valve overhaul and replacement across HP/LP lines and associated components
Actuator overhauls and integration with existing control systems
Cut/weld/replace of HP/L.P. valves from 15 mm to 300 mm
Condenser drainage and steam line isolation valve work
Safety valve testing and re-installation per plant safety standards
EMD amount: ₹10,000; submit with bid
Quantity can vary by ±25% during contract
Delivery window starts after the last original delivery date with 30-day minimum extension
Site-based maintenance including welding/cutting is required
OEM authorizations and safety-compliant procedures are essential
Standard procurement terms; EMD submission required; payment terms aligned with delivery milestones and contract conditions
Delivery period linked to last date of original delivery order; option-based extension with minimum 30 days
Not explicitly stated; subject to ATC and standard government procurement penalties
Experience in valve overhauling/replacement in power plants or heavy industries
Financial capability to handle a contract of approximately ₹10.97 lakh
Ability to perform on-site maintenance and welding/cutting as needed
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
OH of Main steam line valve V2 6 , OH of Steam by pass valve V2 27,15, and V2 7 , OH of ES 3,4,5,6 and 7 , OH of V2 -82-84 and V2-81-A to 81C , OH of HD-21, HD-29, HD-30 and HD-31 , OH of NRV of H.P. Heater and feed pump , OH of Group protection valve of HPH , OH of DW-4, 37,38,39,40,41 and CA 5 , OH of CST Makeup valve V6 60 , OH of AS-48 valve , OH of NRV of extraction line ES-8 , OH of suction valve of BFP , OH Condensate wtr throw off valve to condenser , OH throw off valve to cond and steam isolating of LPH2 , OH of Steam isolating valve of LPH 3, 4 , OH of Safety valve of aux PRDS or deaerator , OH of Safety valve of H.P. heater , OH of Safety valve of L.P. heater. , OH of Safety valve of CBD tank. , OH of Safety valve of flange or stud heatng , OH of Safety valve of warm up line. , Overhauling of actutator of AS 48 Valve , OH of Actr Feed line valveV2 81 or V2 82 or V2 83 or V2 84 , OH of Actr of V2 7 or V2 15 or V2 27 , OH of Actr Drip line valve and ext line valve , OH of Actr Valve connected to condenser , OH of Actr CST make valve , OH of Actr of MSV L and R , OH of Actr of steam isolating valve to LPH2 to 4 , OH of Actr steam throw off valve to condenser , CUT or WELD or REPL OF HP VALVE 15 to 50mm , CUT or WELD or REPL OF HP VALVE 51 to 100mm , CUT or WELD or REPL OF H P VALVE 101 to 150mm , OH of butterfly valve of condenser , OH of dea and FST with internal painting , Repair or replacement of broken hanger , Tightening of loose hangers , CUT or WELD or REPL OF L.P. VALVE 15 to 50mm , CUT or WELD or REPL OF L.P. VALVE 51 to 100mm , CUT or WELD or JOINT OF H.P. PIPE 15 to 50mm , CUT or WELD or JOINT OF H.P. PIPE 51 to 100mm , CUT or WELD or JOINT OF H.P. PIPE 101 to 150mm , CUT or WELD or JOINT OF H.P. PIPE 151 to 300mm , Lift or straight APRDS hdr by cutting weldding , O H of LPH 1A , 1B , O H of LPH 2 3 and 4 , OH and attend flange leakage of GC I or II , Clean of turbine oil or H2 Gas Cooler str , REPL OF DAMAGED SP. Valve V2 38 , REPL OF DAMAGED SPECIAL VALVE V2 27 , OH of turbine oil coolers , OH of main ejectors of turbine , OH of H.P. Heater , OH of LCV 3to15PCV-5, 14,16,17,TCV 8 , Repl bend of LP drip connected to Drip pump or Condenser , Cut damaged bend of HPH drip cont to dea , CUT WELD or REPL OF H.P. VALVE 151 to 300mm , Blank of CRH line for HT and normalizing , OH of H.P. Valve NRV in H.P. Line , OH of L.P. Valve NRV , OH of energy absorber of BFP , OH of DSS of Aux. PRDS.
Advisory Bank
State Bank of India
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Sonbhadra
Delivery Pincodes
231219
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Subodh Kumar Dwivedi | 231219,Obra Thermal Power Plant | Sonbhadra | Uttar Pradesh | 231219 | 2 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
OH of Main steam line valve V2 6
OH of Main steam line valve V2 6
OH of Steam by pass valve V2 27,15, and V2 7
OH of Steam by pass valve V2 27,15, and V2 7
OH of ES 3,4,5,6 and 7
OH of ES 3,4,5,6 and 7
OH of V2 -82-84 and V2-81-A to 81C
OH of V2 -82-84 and V2-81-A to 81C
OH of HD-21, HD-29, HD-30 and HD-31
OH of HD-21, HD-29, HD-30 and HD-31
OH of NRV of H.P. Heater and feed pump
OH of NRV of H.P. Heater and feed pump
OH of Group protection valve of HPH
OH of Group protection valve of HPH
OH of DW-4, 37,38,39,40,41 and CA 5
OH of DW-4, 37,38,39,40,41 and CA 5
OH of CST Makeup valve V6 60
OH of CST Makeup valve V6 60
OH of AS-48 valve
OH of AS-48 valve
OH of NRV of extraction line ES-8
OH of NRV of extraction line ES-8
OH of suction valve of BFP
OH of suction valve of BFP
OH Condensate wtr throw off valve to condenser
OH Condensate wtr throw off valve to condenser
OH throw off valve to cond and steam isolating of LPH2
OH throw off valve to cond and steam isolating of LPH2
OH of Steam isolating valve of LPH 3, 4
OH of Steam isolating valve of LPH 3, 4
OH of Safety valve of aux PRDS or deaerator
OH of Safety valve of aux PRDS or deaerator
OH of Safety valve of H.P. heater
OH of Safety valve of H.P. heater
OH of Safety valve of L.P. heater.
OH of Safety valve of L.P. heater.
OH of Safety valve of CBD tank.
OH of Safety valve of CBD tank.
OH of Safety valve of flange or stud heatng
OH of Safety valve of flange or stud heatng
OH of Safety valve of warm up line.
OH of Safety valve of warm up line.
Overhauling of actutator of AS 48 Valve
Overhauling of AS 48 Valve
OH of Actr Feed line valveV2 81 or V2 82 or V2 83 or V2 84
OH of Actr Feed line valveV2 81 or V2 82 or V2 83 or V2 84
OH of Actr of V2 7 or V2 15 or V2 27
OH of Actr of V2 7 or V2 15 or V2 27
OH of Actr Drip line valve and ext line valve
OH of Actr Drip line valve and ext line valve
OH of Actr Valve connected to condenser
OH of Actr Valve connected to condenser
OH of Actr CST make valve
OH of Actr CST make valve
OH of Actr of MSV L and R
OH of Actr of MSV L and R
OH of Actr of steam isolating valve to LPH2 to 4
OH of Actr of steam isolating valve to LPH2 to 4
OH of Actr steam throw off valve to condenser
OH of Actr steam throw off valve to condenser
CUT or WELD or REPL OF HP VALVE 15 to 50mm
CUT or WELD or REPL OF HP VALVE 15 to 50mm
CUT or WELD or REPL OF HP VALVE 51 to 100mm
CUT or WELD or REPL OF HP VALVE 51 to 100mm
CUT or WELD or REPL OF H P VALVE 101 to 150mm
CUT or WELD or REPL OF H P VALVE 101 to 150mm
OH of butterfly valve of condenser
OH of butterfly valve of condenser
OH of dea and FST with internal painting
OH of dea and FST with internal painting
Repair or replacement of broken hanger
Repair or replacement of broken hanger.
Tightening of loose hangers
Tightening of loose hangers.
CUT or WELD or REPL OF L.P. VALVE 15 to 50mm
CUT or WELD or REPL OF L.P. VALVE 15 to 50mm
CUT or WELD or REPL OF L.P. VALVE 51 to 100mm
CUT or WELD or REPL OF L.P. VALVE 51 to 100mm
CUT or WELD or JOINT OF H.P. PIPE 15 to 50mm
CUT or WELD or JOINT OF H.P. PIPE 15 to 50mm
CUT or WELD or JOINT OF H.P. PIPE 51 to 100mm
CUT or WELD or JOINT OF H.P. PIPE 51 to 100mm
CUT or WELD or JOINT OF H.P. PIPE 101 to 150mm
CUT or WELD or JOINT OF H.P. PIPE 101 to 150mm
CUT or WELD or JOINT OF H.P. PIPE 151 to 300mm
CUT or WELD or JOINT OF H.P. PIPE 151 to 300mm
Lift or straight APRDS hdr by cutting weldding
Lift or straight APRDS hdr by cutting weldding
O H of LPH 1A , 1B
O H of LPH 1A , 1B
O H of LPH 2 3 and 4
O H of LPH 2 3 and 4
OH and attend flange leakage of GC I or II
OH and attend flange leakage of GC I or II
Clean of turbine oil or H2 Gas Cooler str
Clean of turbine oil or H2 Gas Cooler str
REPL OF DAMAGED SP. Valve V2 38
REPL OF DAMAGED SP. Valve V2 38
REPL OF DAMAGED SPECIAL VALVE V2 27
REPL OF DAMAGED SPECIAL VALVE V2 27
OH of turbine oil coolers
OH of turbine oil coolers
OH of main ejectors of turbine
OH of main ejectors of turbine
OH of H.P. Heater
OH of H.P. Heater
OH of LCV 3to15PCV-5, 14,16,17,TCV 8
OH of LCV 3to15PCV-5, 14,16,17,TCV 8
Repl bend of LP drip connected to Drip pump or Condenser
Repl bend of LP drip connected to Drip pump or Condenser
Cut damaged bend of HPH drip cont to dea
Cut damaged bend of HPH drip cont to dea
CUT WELD or REPL OF H.P. VALVE 151 to 300mm
CUT WELD or REPL OF H.P. VALVE 151 to 300mm
Blank of CRH line for HT and normalizing
Blank of CRH line for HT and normalizing
OH of H.P. Valve NRV in H.P. Line
OH of H.P. Valve NRV in H.P. Line
OH of L.P. Valve NRV
OH of L.P. Valve NRV
OH of energy absorber of BFP
OH of energy absorber of BFP
OH of DSS of Aux. PRDS.
OH of DSS of Aux. PRDS.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | OH of Main steam line valve V2 6 | OH of Main steam line valve V2 6 | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 2 | OH of Steam by pass valve V2 27,15, and V2 7 | OH of Steam by pass valve V2 27,15, and V2 7 | 6 | ea | ee_tmd2_btps_obra | 30 | |
| 3 | OH of ES 3,4,5,6 and 7 | OH of ES 3,4,5,6 and 7 | 5 | ea | ee_tmd2_btps_obra | 30 | |
| 4 | OH of V2 -82-84 and V2-81-A to 81C | OH of V2 -82-84 and V2-81-A to 81C | 6 | ea | ee_tmd2_btps_obra | 30 | |
| 5 | OH of HD-21, HD-29, HD-30 and HD-31 | OH of HD-21, HD-29, HD-30 and HD-31 | 4 | ea | ee_tmd2_btps_obra | 30 | |
| 6 | OH of NRV of H.P. Heater and feed pump | OH of NRV of H.P. Heater and feed pump | 4 | ea | ee_tmd2_btps_obra | 30 | |
| 7 | OH of Group protection valve of HPH | OH of Group protection valve of HPH | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 8 | OH of DW-4, 37,38,39,40,41 and CA 5 | OH of DW-4, 37,38,39,40,41 and CA 5 | 7 | ea | ee_tmd2_btps_obra | 30 | |
| 9 | OH of CST Makeup valve V6 60 | OH of CST Makeup valve V6 60 | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 10 | OH of AS-48 valve | OH of AS-48 valve | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 11 | OH of NRV of extraction line ES-8 | OH of NRV of extraction line ES-8 | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 12 | OH of suction valve of BFP | OH of suction valve of BFP | 3 | ea | ee_tmd2_btps_obra | 30 | |
| 13 | OH Condensate wtr throw off valve to condenser | OH Condensate wtr throw off valve to condenser | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 14 | OH throw off valve to cond and steam isolating of LPH2 | OH throw off valve to cond and steam isolating of LPH2 | 3 | ea | ee_tmd2_btps_obra | 30 | |
| 15 | OH of Steam isolating valve of LPH 3, 4 | OH of Steam isolating valve of LPH 3, 4 | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 16 | OH of Safety valve of aux PRDS or deaerator | OH of Safety valve of aux PRDS or deaerator | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 17 | OH of Safety valve of H.P. heater | OH of Safety valve of H.P. heater | 8 | ea | ee_tmd2_btps_obra | 30 | |
| 18 | OH of Safety valve of L.P. heater. | OH of Safety valve of L.P. heater. | 3 | ea | ee_tmd2_btps_obra | 30 | |
| 19 | OH of Safety valve of CBD tank. | OH of Safety valve of CBD tank. | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 20 | OH of Safety valve of flange or stud heatng | OH of Safety valve of flange or stud heatng | 4 | ea | ee_tmd2_btps_obra | 30 | |
| 21 | OH of Safety valve of warm up line. | OH of Safety valve of warm up line. | 3 | ea | ee_tmd2_btps_obra | 30 | |
| 22 | Overhauling of actutator of AS 48 Valve | Overhauling of AS 48 Valve | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 23 | OH of Actr Feed line valveV2 81 or V2 82 or V2 83 or V2 84 | OH of Actr Feed line valveV2 81 or V2 82 or V2 83 or V2 84 | 6 | ea | ee_tmd2_btps_obra | 30 | |
| 24 | OH of Actr of V2 7 or V2 15 or V2 27 | OH of Actr of V2 7 or V2 15 or V2 27 | 6 | ea | ee_tmd2_btps_obra | 30 | |
| 25 | OH of Actr Drip line valve and ext line valve | OH of Actr Drip line valve and ext line valve | 9 | ea | ee_tmd2_btps_obra | 30 | |
| 26 | OH of Actr Valve connected to condenser | OH of Actr Valve connected to condenser | 9 | ea | ee_tmd2_btps_obra | 30 | |
| 27 | OH of Actr CST make valve | OH of Actr CST make valve | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 28 | OH of Actr of MSV L and R | OH of Actr of MSV L and R | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 29 | OH of Actr of steam isolating valve to LPH2 to 4 | OH of Actr of steam isolating valve to LPH2 to 4 | 3 | ea | ee_tmd2_btps_obra | 30 | |
| 30 | OH of Actr steam throw off valve to condenser | OH of Actr steam throw off valve to condenser | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 31 | CUT or WELD or REPL OF HP VALVE 15 to 50mm | CUT or WELD or REPL OF HP VALVE 15 to 50mm | 15 | ea | ee_tmd2_btps_obra | 30 | |
| 32 | CUT or WELD or REPL OF HP VALVE 51 to 100mm | CUT or WELD or REPL OF HP VALVE 51 to 100mm | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 33 | CUT or WELD or REPL OF H P VALVE 101 to 150mm | CUT or WELD or REPL OF H P VALVE 101 to 150mm | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 34 | OH of butterfly valve of condenser | OH of butterfly valve of condenser | 4 | ea | ee_tmd2_btps_obra | 30 | |
| 35 | OH of dea and FST with internal painting | OH of dea and FST with internal painting | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 36 | Repair or replacement of broken hanger | Repair or replacement of broken hanger. | 25 | ea | ee_tmd2_btps_obra | 30 | |
| 37 | Tightening of loose hangers | Tightening of loose hangers. | 20 | ea | ee_tmd2_btps_obra | 30 | |
| 38 | CUT or WELD or REPL OF L.P. VALVE 15 to 50mm | CUT or WELD or REPL OF L.P. VALVE 15 to 50mm | 10 | ea | ee_tmd2_btps_obra | 30 | |
| 39 | CUT or WELD or REPL OF L.P. VALVE 51 to 100mm | CUT or WELD or REPL OF L.P. VALVE 51 to 100mm | 5 | ea | ee_tmd2_btps_obra | 30 | |
| 40 | CUT or WELD or JOINT OF H.P. PIPE 15 to 50mm | CUT or WELD or JOINT OF H.P. PIPE 15 to 50mm | 20 | ea | ee_tmd2_btps_obra | 30 | |
| 41 | CUT or WELD or JOINT OF H.P. PIPE 51 to 100mm | CUT or WELD or JOINT OF H.P. PIPE 51 to 100mm | 20 | ea | ee_tmd2_btps_obra | 30 | |
| 42 | CUT or WELD or JOINT OF H.P. PIPE 101 to 150mm | CUT or WELD or JOINT OF H.P. PIPE 101 to 150mm | 4 | ea | ee_tmd2_btps_obra | 30 | |
| 43 | CUT or WELD or JOINT OF H.P. PIPE 151 to 300mm | CUT or WELD or JOINT OF H.P. PIPE 151 to 300mm | 4 | ea | ee_tmd2_btps_obra | 30 | |
| 44 | Lift or straight APRDS hdr by cutting weldding | Lift or straight APRDS hdr by cutting weldding | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 45 | O H of LPH 1A , 1B | O H of LPH 1A , 1B | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 46 | O H of LPH 2 3 and 4 | O H of LPH 2 3 and 4 | 3 | ea | ee_tmd2_btps_obra | 30 | |
| 47 | OH and attend flange leakage of GC I or II | OH and attend flange leakage of GC I or II | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 48 | Clean of turbine oil or H2 Gas Cooler str | Clean of turbine oil or H2 Gas Cooler str | 4 | ea | ee_tmd2_btps_obra | 30 | |
| 49 | REPL OF DAMAGED SP. Valve V2 38 | REPL OF DAMAGED SP. Valve V2 38 | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 50 | REPL OF DAMAGED SPECIAL VALVE V2 27 | REPL OF DAMAGED SPECIAL VALVE V2 27 | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 51 | OH of turbine oil coolers | OH of turbine oil coolers | 5 | ea | ee_tmd2_btps_obra | 30 | |
| 52 | OH of main ejectors of turbine | OH of main ejectors of turbine | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 53 | OH of H.P. Heater | OH of H.P. Heater | 1 | ea | ee_tmd2_btps_obra | 30 | |
| 54 | OH of LCV 3to15PCV-5, 14,16,17,TCV 8 | OH of LCV 3to15PCV-5, 14,16,17,TCV 8 | 10 | ea | ee_tmd2_btps_obra | 30 | |
| 55 | Repl bend of LP drip connected to Drip pump or Condenser | Repl bend of LP drip connected to Drip pump or Condenser | 10 | ea | ee_tmd2_btps_obra | 30 | |
| 56 | Cut damaged bend of HPH drip cont to dea | Cut damaged bend of HPH drip cont to dea | 15 | ea | ee_tmd2_btps_obra | 30 | |
| 57 | CUT WELD or REPL OF H.P. VALVE 151 to 300mm | CUT WELD or REPL OF H.P. VALVE 151 to 300mm | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 58 | Blank of CRH line for HT and normalizing | Blank of CRH line for HT and normalizing | 2 | ea | ee_tmd2_btps_obra | 30 | |
| 59 | OH of H.P. Valve NRV in H.P. Line | OH of H.P. Valve NRV in H.P. Line | 12,000 | mm | ee_tmd2_btps_obra | 30 | |
| 60 | OH of L.P. Valve NRV | OH of L.P. Valve NRV | 38,000 | mm | ee_tmd2_btps_obra | 30 | |
| 61 | OH of energy absorber of BFP | OH of energy absorber of BFP | 3 | ea | ee_tmd2_btps_obra | 30 | |
| 62 | OH of DSS of Aux. PRDS. | OH of DSS of Aux. PRDS. | 1 | ea | ee_tmd2_btps_obra | 30 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar valve overhauling/replacement projects
Financial statements demonstrating turnover capability
EMD submission document (demand draft or online payment receipt)
Technical bid document showing methodology and on-site capabilities
OEM authorizations or approvals for valve brands/actuators (if applicable)
Any ATC/uploaded supplier/developer declarations from the buyer
Extended Deadline
31-Jul-2026, 6:00 pm
Opening Date
31-Jul-2026, 6:30 pm
Extended Deadline
22-Jul-2026, 6:00 pm
Opening Date
22-Jul-2026, 6:30 pm
Extended Deadline
06-Jul-2026, 2:00 pm
Opening Date
06-Jul-2026, 2:30 pm
Extended Deadline
29-Jun-2026, 2:00 pm
Opening Date
29-Jun-2026, 2:30 pm
Extended Deadline
22-Jun-2026, 2:00 pm
Opening Date
22-Jun-2026, 2:30 pm
Key insights about UTTAR PRADESH tender market
Bidders should submit the technical bid and financial bid with GST, PAN, and EMD ₹10,000. Include OEM authorizations if required and demonstrate on-site capability for 15–300 mm valve work. Ensure compliance with option clause allowing ±25% quantity variation and provide delivery plans aligned to last order date.
Prepare GST certificate, PAN card, experience certificates, financial statements, EMD submission, and technical bid documents. Include OEM authorizations for valve brands if applicable and site safety compliance certificates to meet on-site maintenance requirements.
The scope covers overhaul, cutting, welding, and replacement of HP/LP valves, NRVs, safety valves, actuators, and piping. No explicit standards listed; bidders should rely on OEM procedures and standard industry practices for valve servicing and safety testing.
Delivery starts from the last date of the original delivery order; quantity changes up to ±25%. Additional time equals (additional/original) × original period with a minimum of 30 days. Extensions may apply during currency as per contract.
The bid security or EMD is ₹10,000. Submit via demand draft or online payment as per tender terms; ensure validity through the bid submission window and in line with the ATC if provided.
Eligible bidders must show experience in similar valve overhaul projects, possess the necessary financial capacity to execute a ₹10.97 lakh contract, and demonstrate on-site welding/cutting capabilities. OEM authorization or brand-specific qualifications strengthen eligibility.
Submit a detailed technical plan showing on-site teams, welding/cutting equipment, safety protocols, and previous plant maintenance references. Include certification of welders and safety training records to verify field execution readiness.
Payment terms align with standard government procurement; specify milestone-based payments tied to delivery and inspection. While penalties are not detailed, ensure compliance with ATC documents and project-specific delivery obligations to mitigate risk of non-performance charges.
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER