TenderDekho Logo
Closed GEM

Contract Bidding Open For Split ac 1.5 ton,Instalation,Copper Pipe,pipe,Dismental,MS Stand in KACHCHH, GUJARAT

Bid Publish Date

03-May-2025, 7:19 pm

Bid End Date

14-May-2025, 11:00 am

Value

₹38,40,000

Progress

Issue03-May-2025, 7:19 pm
AwardPending

Bank Of Baroda announces a tender for Split ac 1. 5 ton, Instalation, Copper Pipe, pipe, Dismental, MS Stand in KACHCHH, GUJARAT. Quantity: 293. Submission Deadline: 14-05-2025 11: 00: 00. Last date to apply is approaching fast!

Authority & Contact

Organization

Bank Of Baroda

Department

BANKING SECTOR

Tender Data

Bid Details

Quantity

293

Category

Split ac 1.5 ton

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

Startup Exemption (Experience)

Yes

Requirements

Min. Avg. Annual Turnover

16

OEM Avg. Turnover

48

Past Performance

10 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Split ac 1.5 ton , Instalation , Copper Pipe , pipe , Dismental , MS Stand

Authority Records

MINISTRY OF FINANCEBANK OF BARODA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7802656.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Split ac 1.5 ton

split ac 5 star inv.

97 pieces Delivery: 10 days
#2

Instalation

standard installation

97 pieces Delivery: 10 days
#3

Copper Pipe

Copper pipe

1 running foot Delivery: 10 days
#4

pipe

drain pipe

1 running foot Delivery: 10 days
#5

Dismental

Split AC dismental

84 pieces Delivery: 10 days
#6

MS Stand

standard installation

13 pieces Delivery: 10 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about GUJARAT tender market

What are the eligibility requirements for contractors participating in this tender?

The eligibility requirements include being a registered entity, demonstrating experience in the installation and commissioning of HVAC systems, and having the financial capacity to manage the project effectively. Adherence to local regulations regarding safety and environmental considerations is also crucial.

What technical specifications need to be met for the installation services?

Bidders must comply with specific technical specifications such as installation safety protocols, equipment quality standards, and efficiency testing processes post-installation. Accurate understanding and execution of these specifications ensure the optimal functioning of the split air conditioners.

Are there any financial guarantees required from bidders?

Yes, bidders may need to provide an Earnest Money Deposit (EMD) to participate in the bidding process. This financial security helps confirm the bidder's seriousness in following through with the tender if awarded.

How can I submit my proposal for this tender, and what formats are accepted?

Proposals can be submitted through specified submission methods outlined in the tender documentation. Accepted formats typically include PDF and Word documents, ensuring all necessary documentation is in order and submitted before the deadline.

What benefits are available for MSEs and startups in this tender?

The tender includes specific provisions for Micro, Small, and Medium Enterprises (MSEs) and startups, allowing them to participate more easily. These benefits may vary from price preference in the evaluation process to relaxed documentation requirements, ensuring a competitive edge for smaller but capable contractors.