Tender Overview
The Indian Army, under the Department Of Military Affairs, seeks supply of a complete drone system set comprising a 5 inch Long Range FPV frame, brushless motors, 4-propeller set, 65A 4βinβ1 ESC stack (30x30mm), Li-ion battery pack (3S), receiver, dual-band 2.4 GHz radio controller, 200W DC smart battery charger, spare LiβIon cells, camera, GPS module with compass, and FPV goggles receiver/display unit. Location of procurement is Allahabad, Uttar Pradesh. The BOQ lists 12 items with unspecified quantities, and the estimated contract value is not disclosed. A key tender term provides demand-driven quantity adjustments up to 25% of bid quantity and extended delivery timelines per the option clause. This tender targets a complete drone platform for field operations, with a focus on interoperability and modular component compatibility. Unique aspects include a broad component scope and delivery flexibility to accommodate expandable orders during the contract period.
Technical Specifications & Requirements
- Product category: Drone frame and auxiliary flight components for 5 inch FPV systems
- Items: 12 listed components (N/A quantities in BOQ)
- Delivery flexibility: quantity adjustments up to 25% during contract and currency, with calculated extra time formula: (Increased quantity Γ· Original quantity) Γ Original delivery period, minimum 30 days
- Standards/compatibility: Not specified in tender data; bidders should ensure cross-compatibility among listed modules and standard IS/IEC safe practice alignment where applicable
- Quality/Testing: Not specified; no technical specs provided for performance or endurance
- Warranty/AMC: Not specified
Terms, Conditions & Eligibility
- EMD: Not specified in buyer terms
- Delivery: Delivery period is variable via option clause, extended from the last delivery date; minimum extension threshold is 30 days
- Payment terms: Not specified
- Documents: Standard bid submission documents likely required (GST, PAN, experience, financials) per typical defense tenders, though not explicitly listed
- Penalties: Not detailed; contract adjustments allowed under option clause
- Warranty/Support: Not specified; bidders should confirm post-delivery support requirements
