Bid Publish Date
29-Aug-2026, 10:49 am
Bid End Date
19-Sep-2026, 1:00 pm
Location
Progress
Hindustan Aeronautics Limited (HAL) invites bids for the Fourier Transform Infrared (FTIR) Spectrometer under the Department Of Defence Production, to be procured for delivery at Nashik, Maharashtra 422001. The scope covers Supply, Installation, Testing and Commissioning (SITC) of the FTIR spectrometer. No quantity is specified in the provided data, but the contract includes site installation and commissioning, signaling a turnkey delivery. The procurement emphasizes mandatory compliance with central MSE preferences and Make in India/local content requirements, potentially favoring domestic manufacturers with local content attestations. The buyer’s terms indicate a structured evaluation that accommodates local content and producer eligibility, with an emphasis on supply chain readiness and post-installation support. The tender highlights a controlled, single-organization procurement environment, with emphasis on compliance to national policies for small enterprises and local content certification to ensure domestic value addition.
Product/service names: Fourier Transform Infrared (FTIR) Spectrometer
Estimated value: Not provided
Quantities: Not specified
Standards/certifications: Not specified in data
Delivery: SITC included (Supply, Installation, Testing and Commissioning)
Warranty/AMC: Not specified
Brand/OEM requirements: Manufacturer must supply offered product for MSE eligibility
Testing/Quality: Not specified
Local content: Required per PP-LC policy; invoices must include local content certificate
MSE preference applicable; bidder must be the manufacturer of the offered FTIR system to claim benefit
Local Content certification required with each invoice under Make in India policy
PP-LC Policy FP-20013/2/2017-FP-PNG governs local content compliance and verification
SITC scope includes supply, installation, testing and commissioning at Nashik site
Traders are excluded from MSE benefits; foreign bidders may need auditor/cost auditor certificates
Exact EMD, payment terms, warranty, and delivery timeline are not disclosed in current data
SITC of FTIR spectrometer to be completed as per project timelines; exact dates not provided in current data
Not disclosed in the tender excerpt; bidders should expect standard Govt terms with milestone payments post-installation, subject to policy.
Not specified; bidders should verify during bid submission and contract finalization.
Must be the manufacturer of the offered FTIR spectrometer to avail MSE purchase preference
Proven experience in SITC of analytical instrumentation or similar laboratory equipment
Ability to provide local content certificate and comply with Make in India PP-LC policy
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Fourier Transform Infra Red (FTIR) Spectrometer
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
NASHIK RURAL
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | NASHIK RURAL | NASHIK RURAL | - | - | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) card
Experience certificates (similar turnkey SITC projects)
Financial statements (as required by procurement policy)
EMD/Security deposit documents (if applicable per policy)
Technical bid documents confirming FTIR spectrometer specifications
OEM authorization or Manufacturer certificate (for MSE preference eligibility)
Local content certificate (issued by statutory auditor or cost auditor of Indian office/subsidiary)
Key insights about MAHARASHTRA tender market
Bidders should confirm they are the product manufacturer to claim MSE preference, prepare OEM authorization, submit GST, PAN, financials, and experience certificates, and include local content certificates with invoices, along with SITC scope documentation.
Required documents include GST certificate, PAN, company financials, experience certificates for similar SITC projects, OEM authorization, and local content certificates; ensure demonstration of local content per PP-LC policy with each invoice.
Local content certificates must be issued by a statutory auditor or cost auditor for the Indian office/subsidiary, or by a practicing chartered/accountant for foreign bidders, and must accompany each invoice to reflect pro-rata local content values.
The scope covers Supply, Installation, Testing and Commissioning of the FTIR spectrometer at the Nashik, Maharashtra site, with onsite installation and training as part of SITC.
MSE bidders must be the product manufacturers; if L-1 is not an MSE but within L-1+15%, MSEs may be invited to match and contract for up to 25% of the total value, per the MSE policy.
Local content applicable; bidders must declare and certify content percentage per policy FP-20013/2/2017-FP-PNG; the percentage affects eligibility and invoicing, with sanctions for non-compliance.
The procurement is for Hindustan Aeronautics Limited (HAL) under the Department of Defence Production, located in Nashik, Maharashtra, for a Fourier Transform Infrared spectrometer SITC project.
Payment terms are not disclosed in the excerpt; bidders should verify during bid submission. Penalties/LD details are not specified; verify in detailed tender documents before submission.