TenderDekho Logo
GEM

Power Development Department Jammu And Kashmir Substation Clamps / Connectors Tender 2025 - 25% Quantity Flexibility & Inspection Standards

Bid Publish Date

24-Nov-2025, 11:44 am

Bid End Date

09-Dec-2025, 12:00 pm

EMD

₹12,800

Latest Corrigendum Available

Progress

Issue24-Nov-2025, 11:44 am
Technical12-Aug-2025, 7:38 pm
Financial
Award17-Jan-2026, 12:14 am
Explore all 4 tabs to view complete tender details

Quantity

550

Category

Substation Clamps / Connectors

Bid Type

Two Packet Bid

Categories 6

Tender Overview

The opportunity is issued by the Power Development Department Jammu and Kashmir for procurement related to Substation Clamps / Connectors. The bid includes an EMD of ₹12,800 and features an option clause allowing a ±25% quantity adjustment at contract award and during the contract to the same rates. Delivery timing is tied to the original delivery period with adjustments calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Inspection responsibilities include pre-dispatch inspection by an external agency and post-receipt checks at the consignee site. No BOQ items are listed, indicating potential scope variation.

Key differentiators include the explicit quantity adjustment clause, and the requirement for both pre-dispatch and post-receipt inspections, with bidder obligations for travel and lodging if pre-dispatch inspections are invoked. The tender prioritizes standard compliant, traceable components for substation clamps/connectors and anticipates flexible procurement quantities within a defined framework.

Technical Specifications & Requirements

  • EMD: ₹12,800 (amount specified in terms).
  • Quantity flexibility: up to ±25% of bid/contract quantity.
  • Delivery computation: extended delivery time formula: (Additional quantity ÷ Original quantity) × Original delivery period; minimum 30 days.
  • Inspection regime: Pre-dispatch inspection by Buyer/Authorized Agency; Post-receipt inspection at consignee site.
  • Inspection charges: External agency charges borne by Buyer; in-house testing facilities provided by Seller at no cost.
  • BOQ status: No items listed; potential scope alignment with clamps/connectors category.
  • Delivery prerequisites: Clearance after pre-dispatch inspection before dispatch.
  • These terms indicate a focus on compliance verification and adaptable order quantities for substation hardware.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may adjust quantity by up to 25% at contract formation and during the currency of the contract.
  • Delivery & extension: If exercised, new delivery time follows the stated formula with a minimum of 30 days.
  • Inspection: Pre-dispatch inspection at Seller premises; post-receipt inspection at consignee site; costs for external labs borne by Buyer.
  • Delivery readiness: Seller to notify Buyer of readiness for inspection via email; testing dates coordinated with Buyer/Authorized Agency.
  • Acceptance: Consignee may reject goods at site; prior inspection does not preclude post-receipt checks.
  • BOQ line items: Not specified in the current data; bidders should prepare for scope variance.
  • Ensure readiness to comply with inspection protocols and flexible quantity management throughout the contract term.

Key Specifications

  • Product category: Substation clamps / connectors

  • EMD amount: ₹12,800

  • Quantity flexibility: ±25%

  • Delivery period: as per original delivery period; extended period formula applies

  • Inspection: pre-dispatch and post-receipt inspection requirements

  • Inspection charges: borne by Buyer or specified by terms

  • BOQ: No items listed in current data

Terms & Conditions

  • Option to increase/decrease quantity up to 25% at bid and during contract

  • Pre-dispatch inspection at Seller premises; external agency costs borne by Buyer

  • Delivery time extended using calculated formula with a 30-day minimum

Important Clauses

Payment Terms

Not specified in provided data

Delivery Schedule

Delivery period linked to original schedule with option-based extensions

Penalties/Liquidated Damages

Not specified in provided data

Bidder Eligibility

  • Experience in supplying substation clamps/connectors

  • Financial stability demonstrating ability to execute contract

  • Compliance with inspection and delivery terms as stated

Documents 4

GeM-Bidding-8615817.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Substation Clamps / Connectors,Substation Clamps / Connectors,Substation Clamps / Connectors,Substa

Uttar Pradesh Power Corporation Limited (uppcl)

VARANASI, UTTAR PRADESH

Posted: 6 August 2025
Closed: 16 August 2025
GEM

Substation Clamps / Connectors,Substation Clamps / Connectors,Substation Clamps / Connectors,Substa

Uttar Pradesh Power Corporation Limited (uppcl)

GHAZIABAD, UTTAR PRADESH

Posted: 20 March 2025
Closed: 31 March 2025
GEM

Substation Clamps / Connectors,Substation Clamps / Connectors,Substation Clamps / Connectors,Substa

Uttar Pradesh Power Corporation Limited (uppcl)

GHAZIABAD, UTTAR PRADESH

Posted: 16 July 2025
Closed: 26 July 2025
GEM

Substation Clamps / Connectors,Substation Clamps / Connectors,Substation Clamps / Connectors,Substa

Uttar Pradesh Power Corporation Limited (uppcl)

MUZAFFARNAGAR, UTTAR PRADESH

Posted: 3 September 2025
Closed: 13 September 2025
GEM

Substation Clamps / Connectors,Substation Clamps / Connectors,Substation Clamps / Connectors,Substa

Uttar Pradesh Power Corporation Limited (uppcl)

RAMPUR, UTTAR PRADESH

Posted: 15 August 2025
Closed: 27 August 2025
GEM

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for related substation clamps/connectors procurement

4

Financial statements demonstrating liquidity for bid performance

5

EMD submission receipt of ₹12,800

6

Technical bid documentation confirming product compliance

7

OEM authorizations or distributor certificates (if applicable)

8

Any pre-qualification or quality certification documents (if required)

Corrigendum Updates

1 Update
#1

Update

06-Dec-2025

Extended Deadline

09-Dec-2025, 12:00 pm

Opening Date

09-Dec-2025, 12:30 pm

Technical Results

S.No Seller Item Date Status
1SYF ENTERPRISES   Under PMAMake : NA Model : UNBRANDED08-12-2025 19:38:35Qualified
2USA ENTERPRISES   Under PMAMake : NA Model : UNBRANDED08-12-2025 19:54:49Qualified

Financial Results

Rank Seller Price Item
L1SYF ENTERPRISES   Under PMA₹9,12,640Item Categories : Substation Clamps / Connectors,Substation Clamps / Connectors,Substation Clamps / Connectors,Substa
L2USA ENTERPRISES   Under PMA₹9,36,095Item Categories : Substation Clamps / Connectors,Substation Clamps / Connectors,Substation Clamps / Connectors,Substa

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about JAMMU AND KASHMIR tender market

How to bid for substation clamps tender in Jammu and Kashmir 2025

Bidders must submit GST, PAN, experience certificates, financials, and ₹12,800 EMD with technical bid. The contract allows ±25% quantity variation and requires pre-dispatch and post-receipt inspections. Ensure OEM authorizations if applicable and be prepared for extension calculations based on the quantity exercised.

What documents are required for JK power department tender participation

Submit GST and PAN, organization profile, experience certificates for related clamps/connectors, financial statements, EMD receipt of ₹12,800, technical bid, and any OEM authorization. Additional quality certifications may strengthen eligibility; ensure bidder details match bid data and inspection commitments.

What are the inspection requirements for the JK tender

Pre-dispatch inspection at Seller premises may be conducted by Buyer or a nominated external agency, with related charges borne by Buyer. Post-receipt inspection occurs at the consignee site. In-house testing may be provided by Seller at no cost; ensure readiness for inspection dates via email notification.

What is the quantity adjustment clause for this procurement

The Purchaser may adjust quantity by up to 25% of bid/contract quantity at award and during currency, at contracted rates. If exercised, extended delivery time follows the formula (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Where will delivery and acceptance occur for the clamps bid

Delivery to the designated consignee location after successful pre-dispatch inspection. Post-receipt inspection by the store officer governs final acceptance, and rejection rights remain despite prior inspection outcomes.

What is the EMD amount and payment terms for the tender

EMD is ₹12,800. Payment terms are not specified in the provided data; bidders should expect standard government terms, with EMD submitted in specified format and mode as per tender ATC.

Which organization is issuing the tender for substation hardware

The tender is issued by the Power Development Department, Jammu and Kashmir, under GEM portal guidelines. Suppliers should align with state procurement norms and inspectorate requirements noted in the ATC.