Speedometer Cable,Vane Pump,SA of fuel pipe feed pump,Bracket tfr case,Mounting RH rear,Universal j
Indian Army
GURDASPUR, PUNJAB
Progress
Quantity
339
Category
FSII Dosing Cart for BPI 1 2
Bid Type
Two Packet Bid
Hindustan Petroleum Corporation Ltd invites bids for procurement of dedicated electrical and fluid handling equipment, including FLP Lights, 4 Way FLP JB, 3C x 2.5 Sq.mm Cable, AODD Pump, and FSII Dosing Cart for BPI 1 and 2. The scope combines electrical cabling, fluid transfer hardware, and dosing cart systems. The tender emphasizes quantity variation up to 25% at contracted rates and a delivery timeline tied to the original delivery period, with extension rules that require calculation: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. This ATC-aware procurement requires filled Form 12, GST, PAN, Udyam, and integrity documentation. The absence of explicit start/end dates and estimated value suggests a framework contract with optional scope expansion and compliance prerequisites. Unique aspects include the option clause governing quantity and delivery extensions during contract currency, and mandatory pre-submission documentation for bid validity.
Product categories: FLP Lights, 4 Way FLP JB, 3C x 2.5 Sq.mm Cable, AODD Pump, FSII Dosing Cart
No explicit technical standards listed in tender data
Estimated value not provided; scope appears framework-based with optional quantity expansion
EMD amount not specified in the available data
Delivery extension mechanism tied to original delivery period with minimum 30 days
Section VI-1 and Form 12 mandatory along with GST, PAN, Udyam and integrity documentation
Quantity adjustment up to 25% during contract; apply contracted rates
Delivery period begins from last date of original delivery order
Mandatory submission of Form 12, GST, PAN, Udyam, and Integrity Pact
No explicit payment terms provided in data; bidders should confirm HPCL ATC and form 12 submission requirements for payment milestones
Delivery period calculated from the last date of the original delivery order; additional time = (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
No LD details provided in data; ATC clauses imply standard procurement penalties may apply for delays
Ability to supply FLP lighting, electrical and fluid handling equipment
Compliance with Form 12, GST, PAN, and Udyam documentation
Financial statements for last 3 years and balance sheet availability
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
GURDASPUR, PUNJAB
Indian Army
SONITPUR, ASSAM
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
JODHPUR, RAJASTHAN
Indian Army
BARAMULLA, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | FLP Lights | FLP Lights | 8 | each | ajaydutt | 30 |
| 2 | 4 Way FLP JB | 4 Way FLP JB | 8 | each | ajaydutt | 30 |
| 3 | 3C x 2.5 Sq.mm Cable | 3C x 2.5 Sq.mm Cable | 320 | meter | ajaydutt | 30 |
| 4 | AODD Pump | AODD Pump | 1 | each | ajaydutt | 90 |
| 5 | FSII Dosing Cart for BPI 1 2 | FSII Dosing Cart for BPI 1 2 | 2 | each | ajaydutt | 90 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Section VI-1 filled and signed
Form 12 including GST, PAN, Udyam Certificate
Integrity Pact (if applicable)
PO + Completion Letter or PO + Invoices of similar works with values
Profit and Loss Statement for last 3 financial years
Balance Sheet for last 3 financial years
Any OEM authorizations or technical compliance certificates (if applicable)
Extended Deadline
10-Nov-2025, 3:00 pm
Opening Date
10-Nov-2025, 3:30 pm
Key insights about GUJARAT tender market
Bidders should register with HPCL portal, prepare Form 12 with GST, PAN, Udyam, and Integrity Pact, and submit Section VI-1. Ensure compliance with 3-year financial statements and balance sheets, along with PO/Invoices for similar work. Delivery terms and 25% quantity option apply, so plan capacity accordingly.
Submit GST certificate, PAN card, Udyam certificate, Form 12, Integrity Pact (if applicable), Section VI-1, financial statements for last 3 years, and PO/Invoices for similar projects. Ensure all documents align with tender terms and are uploaded with the bid.
Delivery extension follows: Additional time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If the original period is under 30 days, extension equals the original period; extension can be applied during currency of contract.
Tender includes FLP Lights, 4 Way FLP JB, 3C x 2.5 Sq.mm Cable, AODD Pump, and FSII Dosing Cart for BPI 1 & 2. No explicit technical standards are given; bidders should demonstrate compliance and suitability for refinery environments.
Form 12 is mandatory for HPCL bids; it consolidates essential compliance data including GST, PAN, Udyam, and integrity commitments. Incomplete Form 12 submissions can lead to bid rejection, so ensure all sections are accurately completed and signed.
The tender data does not specify explicit standards; bidders should provide standard electrical safety and fluid handling certifications, and OEM authorizations if applicable. Prepare to show compliance evidence during bid submission and after award.
Delivery must commence from the last date of the original delivery order. If quantity increases, apply the option-CL delivery extension formula, ensuring minimum 30 days extension and coordinated scheduling with HPCL procurement.
Eligibility includes ability to supply FLP lighting and dosing equipment, submission of Form 12 with GST/PAN/Udyam, providing financials for the last 3 years, and OEM or technical documentation as required. Non-submission may lead to rejection; ensure all mandatory documents are attached.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS