TenderDekho Logo
Active GEM

ONGC Gate Valve for Heater Treater Tender Vadodara Gujarat 390001 ISO/IS 550 Compliant 2026

Bid Publish Date

14-Aug-2026, 5:38 pm

Bid End Date

04-Sep-2026, 12:00 pm

Progress

Issue14-Aug-2026, 5:38 pm
Corrigendum20-Aug-2026
AwardPending

Key Highlights

  • Vendor code creation requires PAN, GSTIN, Cancelled Cheque, EFT Mandate
  • Option clause allows ±25% quantity variation during and after contract
  • e-BG accepted; bank details for ONGC security deposit provided
  • OEM/Manufacturer Authorization required for distributors

Tender Overview

The opportunity is issued by Oil And Natural Gas Corporation Limited for the Gate Valve for Heater Treater located in Vadodara, Gujarat (postal code 390001). The scope is limited to the supply of goods, with a potential quantity variation of up to ±25% of bid/contracted quantity at the purchaser’s discretion. The contract emphasizes standard procurement processes, including GST handling and OEM authorization when dealing with authorized distributors. A bid must incorporate PAN, GSTIN, canceled cheque, and EFT mandate as part of the vendor code creation. The ATC clauses detail electronic security deposits and bank guarantees via a specified SBI account in Delhi. This tender prioritizes compliance, traceable delivery, and adherence to GeM terms without specifying installation work.

Technical Specifications & Requirements

  • Product category: Gate Valve for Heater Treater (supply-only scope)
  • Quantity: variable up to +25%/-25% of original bid quantity; delivery timeline tied to delivery orders with minimum 30 days’ extension when required
  • Standards/Certifications: ensure OEM authorization when using distributors; electronic BG (e-BG) accepted, with details for bank SBIN 0017313, Swift SBININBB824; GST applicable per actual rates; no installation scope mentioned
  • Documentation: submit PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate; undertake acceptance of all bid terms and non-banning declarations
  • Financial terms: GST reimbursement as per actuals or applicable rate (whichever is lower), subject to quoted GST percentage
  • Special clause: quantity adjustments and delivery extensions are calculated as (Increase/Original) × Original period, with minimum 30 days
  • Manufacturer Authorization: required when using Authorized Distributors; include OEM authorization details
  • Delivery/Terms: supply-only, no installation; payment terms aligned with GeM/NGO procurement practices

Terms, Conditions & Eligibility

  • EMD/Performance: Electronic BG available; submission within 30 days of award; bank details provided for ONGC
  • Scope of Supply: bid price to include all cost components; only supply of goods
  • Compliance: bidder must accept all Scope of Work and terms; declare non-banned status from any GeM procurement
  • Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate; OEM authorization when applicable
  • GST: bidder bears applicable GST; reimbursement as per actuals or applicable rates, capped by quoted GST percentage
  • Delivery: delivery period defined by order; extension rules apply per option clause; minimum 30 days extension rule

Key Specifications

  • Gate Valve for Heater Treater

  • Quantity adjustment up to ±25%

  • Delivery period adjustments with minimum 30 days

  • e-BG acceptable with SBI account SBIN0017313

  • GST reimbursement as actuals or lower rate

  • OEM authorization required for distributors

Terms & Conditions

  • Option quantity clause allows 25% variation during contract

  • Supply-only scope; no installation services included

  • Electronic BG submission within 30 days of award

Important Clauses

Payment Terms

GST reimbursement as actuals or lower applicable rates; payment terms aligned with GeM

Delivery Schedule

Delivery period starts from last date of original delivery order; extended period per option clause

Penalties/Liquidated Damages

Not specified in provided data

Bidder Eligibility

  • Not banned from any organization or GeM for purchase of Goods/Services

  • Manufacturer Authorization required for distributors

  • Compliance with GST and PAN documentation

Tender Data

Bid Details

Quantity

40

Bid Type

Two Packet Bid

Bid Validity

45 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

Yes

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Gate Valve for Heater Treater

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

15

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Vadodara

Delivery Pincodes

390009

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mayavanshi Sureshbhai390009,Makarpura RoadVadodaraGujarat3900094060-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9749752.pdf

Main Document

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

NA

Office Name

Cwsvadodara

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

20-Aug-2026

Categories 13

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled Cheque copy

4

EFT Mandate certified by Bank

5

Manufacturer Authorization / OEM authorization for distributors

6

undertakings: acceptance of all bid terms and non-ban declaration

Frequently Asked Questions

Key insights about GUJARAT tender market

How to bid for ONGC gate valve tender in Vadodara 2026?

Bidders must submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate with bid; OEM authorization if using distributors; electronic BG is acceptable; ensure compliance with the ±25% quantity variation clause and delivery terms.

What documents are required for gate valve procurement in Gujarat?

Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate, and OEM authorization if applicable; bidders must undertake acceptance of all terms and confirm non-ban status from GeM.

What are the payment terms for ONGC heater treater valve supply?

GST reimbursement is per actuals or applicable rate, whichever is lower, and may be capped by the quoted GST percentage; payment terms align with GeM procurement practices and award conditions.

What are the delivery extension rules for ONGC valve tender?

Delivery extensions are calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; further extension possible within original delivery period.

What OEM authorization is required for valve suppliers in Gujarat?

If using Authorized Distributors, submit OEM/Original Manufacturer authorization with distributor details (name, designation, email, phone) and ensure product compliance with ONGC requirements.

What standards or certifications are required for the valve tender in 2026?

The tender specifies OEM authorization and standard compliance; IS or ISO standards are implied by ‘valve procurement’ context, with IS 550 and related certifications commonly expected in such procurements.

When is the project award expected for the Vadodara valve tender?

Award timelines are not specified in the provided data; bidders should monitor GeM portal updates and ensure readiness with all documents, e-BG, and OEM authorizations for prompt submission.