Bid Publish Date
14-Jul-2026, 9:21 am
Bid End Date
20-Jul-2026, 10:00 am
Location
Progress
Quantity
2
Bid Type
Two Packet Bid
The Indian Air Force, Department of Military Affairs, invites bids for Panel Air Conditioners (Q3) under a government procurement process. The tender specifies core procurement details including power supply, warranty terms, protection class, material, refrigerant type, and rated cooling capacity. A notable quantity option clause allows a ±25% adjustment during contract execution, with delivery timelines tied to the original order’s delivery period. Bidder must adhere to buyer-added_ATC requirements and upload ink-signed, stamped documents. No BOQ items are listed, and key financials (estimated value, EMD) are not disclosed in the available data.
Key Term 1: Quantity may vary by ±25% during contract, with a defined delivery calculation
Key Term 2: Mandatory ink-signed stamp-attached ATC document uploaded by bidder
Key Term 3: Delivery period tied to original order date; extension rules apply under option clause
Not disclosed in available data; bidders should expect standard govt payment terms upon successful delivery and acceptance
Delivery commences from the last date of original delivery order; option clause may extend delivery time with calculated extra days
Not specified here; verify in full ATC and contract terms for LD provisions and performance bonds
Experience in supplying panel air conditioners or similar HVAC units
Demonstrated compliance with government procurement norms and ATC uploads
Financial capacity to participate in a contract with potential 25% quantity variation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Panel Air Conditioner (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
GWALIOR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | GWALIOR | GWALIOR | - | - | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
| Category | Specification | Requirement |
|---|---|---|
| Specifications | Power supply | 220/440 , 50/60 Hz |
| Specifications | Warranty | 1.0 - 5.0 Or higher |
| Specifications | Protection class | CE |
| Specifications | Material | Mild steel |
| Specifications | Refrigerent type | R134a |
| Capacity | Rated cooling capacity | 1500.0 - 15000.0 Or higher |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card details
Experience certificates in similar air conditioning equipment supply
Financial statements ( audited / latest )
EMD/Security deposit documentation
Technical bid documents showing compliance with power, warranty, protection class, material and refrigerant type
OEM authorization/authorization letters (if applicable)
Ink-signed and stamped Buyer's ATC clause acknowledgment
Bidders must submit GST, PAN, experience certificates, financials, EMD, and technical bids with OEM authorization. Ensure compliance with Power supply, Warranty, Protection class, Material, Refrigerant type, and Rated cooling capacity. Upload ink-signed Buyer's ATC list and adhere to the ±25% quantity option and delivery terms.
Required documents include GST registration, PAN, audited financials, experience certificates in HVAC, EMD submission, technical bid demonstrating compliance with listed specifications, OEM authorizations, and the signed ATC document. Prepare ready-to-upload scans for rapid bid submission.
Key specs to verify: power supply details, warranty duration and coverage, protection class (IP rating), material composition, refrigerant type and charge, and rated cooling capacity. Ensure products meet these exact criteria and provide documentation confirming compliance.
Delivery timing starts from the last date of the original delivery order. If quantity increases by up to 25%, the extra time is calculated as (increased quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days.
Exact EMD amount is not disclosed in the available data; bidders should prepare as per standard government tender norms, typically a fixed monetary value or percentage of estimated contract value, payable via bank draft or online transfer as specified in full ATC.
Submit documentation showing compliance with listed specifications, and OEM authorizations if required. While no specific standards are named, provide evidence of warranty terms, material quality, and refrigerant compliance; ATC upload is mandatory for technical acceptance.
Meet experience requirements in supplying HVAC equipment, maintain adequate financial health, provide GST/PAN, and ensure capability to manage quantity variation. Upload signed ATC and OEM authorizations; verify power, warranty, materials, and refrigerant compliance before submission.
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS