TenderDekho Logo
Closed GEM

Government Tender Published for Layer 2 Access Switch (V3),Copper Patch Cord,Copper Patch Cord in Raigarh, CHHATTISGARH

Bid Publish Date

24-Jul-2026, 1:19 pm

Bid End Date

20-Aug-2026, 12:00 pm

EMD

₹10,446

Value

₹5,22,327

Generate Docs

Progress

Issue24-Jul-2026, 1:19 pm
Corrigendum13-Aug-2026
AwardPending

South Eastern Coalfields Limited has released a public tender for Layer 2 Access Switch (V3) (Q2), Copper Patch Cord (Q2) in Raigarh, CHHATTISGARH. Quantity: 275. Submission Deadline: 20-08-2026 12: 00: 00. Download documents and apply online.

Authority & Contact

Office Name

Secl Bilaspur Chhattisgarh

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

275

Category

Layer 2 Access Switch (V3)

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Layer 2 Access Switch (V3) (Q2) , Copper Patch Cord (Q2)

Advisory Bank

AXIS BANK LTD

ePBG Percentage

5%

ePBG Duration (Months)

6

Payment Timelines

Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Raigarh

Delivery Pincodes

496665

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Abhijit Suresh Shinde496665,REGIONAL STORE CHHAL, SECL RAIGARH AREARaigarhChhattisgarh4966652545-

Authority Records

MINISTRY OF COALCOAL INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-9584220.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

CATALOG-Specification-2

CATALOG Specification

CATALOG-Specification-3

CATALOG Specification

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 5

Corrigendum Updates

1 Update
#1

Update

13-Aug-2026

Extended Deadline

20-Aug-2026, 6:30 am

Opening Date

20-Aug-2026, 7:00 am

Required Documents

1

OEM Authorization Certificate

2

Additional Doc 1 (Requested in ATC)

3

Additional Doc 2 (Requested in ATC)

4

Additional Doc 3 (Requested in ATC)

5

Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Specifications 3 Items

Item #1 Details

View Catalog
Category Specification Requirement
Generic Description of Store Managed Layer 2 Access Switch
Downlink Ports Downlink Ports Type PoE
Downlink Ports Total Number of Ethernet (RJ45) Ports (Downlinks port) 8
Downlink Ports Number of PoE RJ45 Ports (Downlink) 8.0
Downlink Ports Number of PoE+ RJ45 Ports (Downlink) 0.0
Downlink Ports Number of PoE++ RJ45 Ports (Downlink) 0.0
Uplink Ports Uplink Port Type SFP+
Uplink Ports Number of SFP Ports (Uplink) 0.0
Uplink Ports Number of SFP+ Port (Uplink) 2.0
Uplink Ports Number of RJ45 ports (Uplink) 0.0
Specification Switching Capacity Duplex (in Gbps) 20
Warranty and Certification MTCTE Certification as per TEC Yes
Warranty and Certification Certification from TEC as per Standard for Generic Requirements (GR)/Interface Requirements (IR) Yes, No