Bid Publish Date
24-Jul-2026, 1:19 pm
Bid End Date
20-Aug-2026, 12:00 pm
EMD
₹10,446
Value
₹5,22,327
Location
Progress
South Eastern Coalfields Limited has released a public tender for Layer 2 Access Switch (V3) (Q2), Copper Patch Cord (Q2) in Raigarh, CHHATTISGARH. Quantity: 275. Submission Deadline: 20-08-2026 12: 00: 00. Download documents and apply online.
Quantity
275
Category
Layer 2 Access Switch (V3)
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
7 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Warranty Period
1 years
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Layer 2 Access Switch (V3) (Q2) , Copper Patch Cord (Q2)
Advisory Bank
AXIS BANK LTD
ePBG Percentage
5%
ePBG Duration (Months)
6
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Raigarh
Delivery Pincodes
496665
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Abhijit Suresh Shinde | 496665,REGIONAL STORE CHHAL, SECL RAIGARH AREA | Raigarh | Chhattisgarh | 496665 | 25 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
CATALOG Specification
CATALOG Specification
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
20-Aug-2026, 6:30 am
Opening Date
20-Aug-2026, 7:00 am
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| Generic | Description of Store | Managed Layer 2 Access Switch |
| Downlink Ports | Downlink Ports Type | PoE |
| Downlink Ports | Total Number of Ethernet (RJ45) Ports (Downlinks port) | 8 |
| Downlink Ports | Number of PoE RJ45 Ports (Downlink) | 8.0 |
| Downlink Ports | Number of PoE+ RJ45 Ports (Downlink) | 0.0 |
| Downlink Ports | Number of PoE++ RJ45 Ports (Downlink) | 0.0 |
| Uplink Ports | Uplink Port Type | SFP+ |
| Uplink Ports | Number of SFP Ports (Uplink) | 0.0 |
| Uplink Ports | Number of SFP+ Port (Uplink) | 2.0 |
| Uplink Ports | Number of RJ45 ports (Uplink) | 0.0 |
| Specification | Switching Capacity Duplex (in Gbps) | 20 |
| Warranty and Certification | MTCTE Certification as per TEC | Yes |
| Warranty and Certification | Certification from TEC as per Standard for Generic Requirements (GR)/Interface Requirements (IR) | Yes, No |