Quantity

3337

Category

Comp mtce of SAC unit

Bid Type

Two Packet Bid

Key Highlights

  • Specific brand/OEM requirements not stated in available data
  • Exact EMD amount: ₹25,135; estimated contract value: ₹1,256,755
  • Option clause allows ±25% quantity variation during and after award
  • Delivery period adjustments based on (increased quantity ÷ original quantity) × original delivery period
  • Gas charging, initial repair, and replacement for SAC unit maintenance at BSNL Kolkata
  • 20 BOQ items present; item-level details not disclosed
  • GST, PAN, experience certificates, financial statements, OEM authorizations typically required
  • No explicit standards (IS/ISO) specified in the provided data; prepare for standard telecom service norms

Categories 87

Tender Overview

Organization: Bharat Sanchar Nigam Limited (BSNL) under the Department of Telecommunications, Location: Kolkata, West Bengal (700001). The tender covers comp maintenance of SAC unit, including initial repair, replacement, and gas charging. Estimated value: ₹1,256,755 with an EMD of ₹25,135. Total 20 BOQ items listed, though item-level details are not provided. The contract accommodates quantity adjustments up to 25% during and after award, with delivery time recalculated per the option clause. This procurement is framed for ongoing service continuity and equipment reliability in the Kolkata region.

  • Tender reference highlights the scope for ongoing maintenance, repairs, and gas charging services for SAC units.
  • The buyer’s terms permit flexible quantity changes and extended delivery timelines, impacting bid planning and risk assessment.
  • The procurement emphasizes compliance with delivery schedules tied to the original and extended orders and requires adherence to contract rate protections during quantity fluctuations.

Technical Specifications & Requirements

  • Category: Comp maintenance of SAC unit, initial repairing, initial repair, replacement, gas charging for BSNL facilities.
  • Quantity/Scale: Not disclosed; 20 BOQ items exist but with no unit values or descriptions.
  • Location/Delivery: Kolkata, West Bengal; delivery schedule governed by option clause and delivery period rules.
  • Standards/Compliance: Not specified in available data; bidders should prepare for standard service maintenance protocols, with emphasis on timely gas charging and replacement operations.
  • Experience/Capabilities: Service capability in telecom equipment maintenance and gas charging likely required; no explicit years or turnover provided.
  • Financials: Estimated value ₹1,256,755; EMD ₹25,135.
  • Special Clauses: Quantity variation up to 25%; delivery time adjustments based on (increase/original quantity) formula; minimum 30 days, if applicable.

Terms, Conditions & Eligibility

  • EMD: ₹25,135; payable as per procurement norms.
  • Delivery: Option-based delivery extension; additional time formula provided; minimum 30 days.
  • Payment Terms: Not stated; bidders should anticipate standard government norms (milestone/RA terms to be clarified).
  • Documents: GST, PAN, experience certificates, financials, technical bid documents, OEM authorizations likely required per standard BSNL practice.
  • Clause Access: Bidder must comply with the option clause for quantity variation and extended delivery periods.
  • Validation: No explicit warranty or penalties documented in the data; bidders should seek clarifications during tender briefing.
  • Eligibility: Prior telecom equipment maintenance capability advisable; no detailed turnover or experience thresholds provided in the data.

Key Specifications

  • SAC unit maintenance including initial repair, repair, replacement, and gas charging

  • Estimated contract value ₹1,256,755; EMD ₹25,135

  • Quantity variation up to 25% during placement and currency of contract

  • Delivery period adjustments using (increase/original quantity) × original delivery period with a minimum 30 days

  • 20 BOQ items listed but no unit quantities provided

Terms & Conditions

  • EMD amount of ₹25,135 required to participate

  • Quantity may vary by up to 25% at buyer's discretion

  • Delivery schedule linked to original and extended periods with formula-based extension

Important Clauses

Payment Terms

Not explicitly defined in data; bidders should expect standard government payment terms and seek clarification during bid submission

Delivery Schedule

Delivery rights include option-based extensions; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in data; bidders should verify LD terms during tender clarification

Bidder Eligibility

  • Experience in telecom equipment maintenance and gas charging

  • Compliance with EMD submission and required vendor documents

  • Ability to handle quantity variation up to 25% and manage extended delivery schedules

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Comp mtce of SAC unit , Initial repairing , Initial repair , Repalcement. , Gas charging

Authority Records

MINISTRY OF COMMUNICATIONSTELECOMMUNICATIONS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9164006.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

HPAC Mtce,SAC Mtce,SAC Mtce,TL Replacement,Fan Rewinding,CL Repairing,AFD Mtce,Operation and Mtce

Bharat Sanchar Nigam Limited Portal(bsnl)

KOLKATA, WEST BENGAL

Posted: 14 February 2025
Closed: 25 February 2025
GEM

PKG AC Mtce,SAC Mtce,TL Replacement,Fan Rewinding,CL Repairing,AFD Mtce,Operation and Mtce

Bharat Sanchar Nigam Limited Portal(bsnl)

KOLKATA, WEST BENGAL

Posted: 10 February 2025
Closed: 20 February 2025
GEM

PKG AC Mtce,SAC Mtce,TL Replacement,Fan Rewinding,CL Repairing,AFD Mtce,Operation and Mtce

Bharat Sanchar Nigam Limited Portal(bsnl)

KOLKATA, WEST BENGAL

Posted: 11 February 2025
Closed: 21 February 2025
GEM

PKG AC Mtce,SAC Mtce,TL Replacement,Fan Rewinding,CL Repairing,AFD Mtce,Operation and Mtce

Bharat Sanchar Nigam Limited Portal(bsnl)

KOLKATA, WEST BENGAL

Posted: 8 February 2025
Closed: 19 February 2025
GEM

PKG AC Mtce,SAC Mtce,TL Replacement,Fan Rewinding,CL Repairing,AFD Mtce,Operation and Mtce

Bharat Sanchar Nigam Limited Portal(bsnl)

KOLKATA, WEST BENGAL

Posted: 14 February 2025
Closed: 24 February 2025
GEM

Bill of Quantities (BOQ) 20 Items Sign in for GEM prices

#1

Comp mtce of SAC unit

Comprehensive maintenance of Inverter/Non-Inverter type 1.5 TR Split /Window AC unit and its associated power feeding arrangement including replacement of faulty spares, charging of refrigerant, replacement of faulty condenser motor and blower motor, replacement of faulty compressor, cleaning of filter, cooling coil and condenser coil etc. for smooth operation of the AC units as detailed in work specification /methodology attached complete as reqd. a) 1.5 TR capacity Split /Window AC units (169 nos. AC units/month for 24 Months)

3,144 jobs Delivery: 730 days
#2

Initial repairing

Fixed speed Compressor (1.5 TR) for AC unit

7 nos Delivery: 730 days
#3

Initial repair

Variable speed Compressor (1.5 TR) for AC unit

7 nos Delivery: 730 days
#4

Initial repair

Single Phase Blower fan motor for 1.5 TR AC unit.

7 nos Delivery: 730 days
#5

Initial repair

Single Phase Condenser fan motor for 1.5 TR AC unit.

7 nos Delivery: 730 days
#6

Initial repair

Indoor unit Fan Blade

7 nos Delivery: 730 days
#7

Initial repair

Outdoor unit Fan Blade

7 nos Delivery: 730 days
#8

Initial repair

Starting Capacitor suitable for compressor unit.

13 nos Delivery: 730 days
#9

Initial repair

Running Capacitor suitable for compressor unit.

13 nos Delivery: 730 days
#10

Initial repair

Blower Motor Capacitor.

13 nos Delivery: 730 days
#11

Repalcement.

Condenser Motor Capacitor.

13 nos Delivery: 730 days
#12

Initial repair

Starting Relay

13 nos Delivery: 730 days
#13

Initial repair

Thermostat

13 nos Delivery: 730 days
#14

Initial repair

2-Pole , 25Amp Power Contactor (MNX 25 or similar) For AC controller Unit

13 nos Delivery: 730 days
#15

Initial repair

DP sheet steel enclosure on surface / recess along with 25 /32 A 240 V C curve DP MCB.

7 nos Delivery: 730 days
#16

Initial repair

25A DP MCB

7 nos Delivery: 730 days
#17

Initial repair

5-32A SPMCB

13 nos Delivery: 730 days
#18

Initial repair

PCB (Control card for Inverter AC unit)

13 nos Delivery: 730 days
#19

Initial repair

Cyclic Timer (Selec 800Xc - Din Rail or similar suitable)

7 nos Delivery: 730 days
#20

Gas charging

Supplying & charging of suitable fresh refrigerant gas in the existing inverter/non-inverter 1.5 TR Split / Window Air-Conditioner i/c necessary leak testing, fault rectification, brazing etc with pressure testing etc. complete as required.

13 jobs Delivery: 730 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for telecom equipment maintenance

4

Financial statements (audited) for the last financial year

5

EMD submission document (DD/online receipt) as per tender terms

6

Technical bid document with compliance statements

7

OEM authorization/authorizations for service repair if applicable

8

Any prior project completion certificates related to SAC unit maintenance

Reverse Auction Schedule

Completed

Start

14-May-2026, 5:00 pm

End

15-May-2026, 5:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid for BSNL SAC unit maintenance tender in Kolkata?

Bidders must submit GST, PAN, experience certificates, financial statements, EMD ₹25,135, and technical bid documents. Ensure OEM authorizations if required and prepare for 25% quantity variation. Review delivery extension rules and provide detailed service capability for gas charging and replacement of SAC units.

What documents are required to participate in BSNL tender Kolkata 2026?

Required documents typically include GST registration, PAN, last 3 years financial statements, experience certificates for telecom maintenance, EMD submission, technical bid, and OEM authorizations. Prepare project references for SAC unit maintenance and gas charging capabilities.

What are the delivery extension rules for BSNL procurement?

Delivery can extend up to 25% quantity variation, calculated by (increased quantity ÷ original quantity) × original delivery period, with a minimum extension of 30 days; extensions may apply during currency of contract as per option clause.

What are the key financial terms for this BSNL bid Kolkata?

Estimated contract value is ₹1,256,755 with an EMD of ₹25,135. Payment terms are not explicitly stated; bidders should anticipate standard government terms and confirm milestones during bid clarification.

What scope is covered under SAC unit maintenance in this tender?

Scope includes comp maintenance, initial repair, replacement, and gas charging for SAC units at BSNL sites in Kolkata, with 20 BOQ items referenced though item-wise details are not disclosed.

What experience is desirable for BSNL SAC unit work?

Prior telecom equipment maintenance experience is advisable, particularly in SAC unit repair and gas charging, with documentation to prove capability and similar project references.

Are there any specific standards required for BSNL Kolkata tender?

No explicit standards mentioned in the data. Bidders should be ready to comply with general telecom maintenance norms and seek clarification on any IS/ISO or OEM standards during bid submissions.

When is the delivery timeline applicable for BSNL option clause?

Delivery timelines apply from the last date of the original delivery order; extended periods follow the same rate and are calculated per the option clause with the 30-day minimum as a baseline.

Similar Tenders

5 found

CHARGING AND HOLDING,INPUT SHAFT REPAIR,AIR DRYER ASSY REPAIR,GEAR BOX REPAIR,METAL OIL AND LEBOUR

Indian Army

📍 GURDASPUR, PUNJAB

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Repair and Overhauling Service - Multifunction Machines MFM; TROLLY NITROGEN CHARGING; Yes; Buyer P

Indian Air Force

Est: ₹95,000
⏰ Deadline: 2 days left
🛒 Type: Service
View GEM
Urgent

Repair and Overhauling Service - Multifunction Machines MFM; TROLLY NITROGEN CHARGING; Yes; Service

Indian Air Force

Est: ₹95,000
⏰ Deadline: 2 days left
🛒 Type: Service
View GEM
Urgent

Repair and Overhauling Service - Multifunction Machines MFM; GROUND POWER UNIT; Yes; Buyer Premises

Indian Air Force

Est: ₹27,000
⏰ Deadline: 2 days left
🛒 Type: Service
View GEM
Urgent

Indian Army Repair & Overhauling Service for Multifunction Machines Tender Jammu & Kashmir 2026

Indian Army

📍 RAJAURI, JAMMU & KASHMIR

⏰ Deadline: 3 days left
🛒 Type: Service
View GEM