Metal Storage Bins
N/a
GONDA, UTTAR PRADESH
Organization: East Central Railway (Indian Railways) seeks the supply of Metal Storage Bins for deployment at the Nalanda, Bihar (PIN 801301) location. The scope is limited to the supply of goods with a 3-year warranty from final acceptance or post-installation testing. The tender includes an option clause to increase/decrease quantity by up to 25% at contracted rates, with delivery timelines calculable from the original order. Post-receipt inspection is conducted by the consignee. The contract emphasizes OEM warranty submission and robust after-sales support across India.
Product/service names and category: Metal Storage Bins (Q3)
Estimated value: Not specified
EMD amount: Not specified
Delivery location: Nalanda, Bihar 801301
Warranty: 3 years from final acceptance or post-installation testing
Inspection: Post receipt inspection by consignee
Option clause: Quantity may be increased/decreased by up to 25% during contract
OEM support: Must provide OEM warranty certificates and India-based service network
Option to increase/decrease quantity by up to 25% at contracted rates
3-year warranty from final acceptance or after installation/testing
Post-receipt inspection by consignee; pre-dispatch inspection not specified
OEM warranty certificates required at time of delivery
Service centers within India to support installation, training, and maintenance
Not explicitly stated in tender; terms subject to standard GeM contract and OEM warranty conditions. Bidder should anticipate typical milestones: delivery, installation (if required), and post-delivery support with payment upon acceptance.
Delivery period begins after the original delivery order; option clause allows extended time proportionate to increased quantity, with a minimum extension of 30 days.
Not specified in provided data; bidders should review ATC for LDs or performance bonds as applicable in GeM terms.
Experience in supplying metal storage equipment to government bodies or railways
Valid GST registration and financial solvent status
OEM authorization or authorized dealer status for the specified metal storage bins
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
GONDA, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
GORAKHPUR, UTTAR PRADESH
Hqids
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
South Central Railway
CHITTOOR, ANDHRA PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST Registration Certificate
PAN Card
Experience Certificates for similar metal storage bin supply
Financial Statements (last 3 years)
EMD/Security Deposit documents (as per ATC)
Technical bid documents confirming product specifications
OEM Authorization / Authorized Dealer Certificate
Warranty compliance certificates from OEM
Service Center details near consignee locations
Any additional bidder qualification documents as per buyer ATC
Key insights about BIHAR tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD as per ATC. Ensure OEM authorization, warranty certificates, and post-delivery service plans. The contract allows a 25% quantity variation at contracted rates and requires post-receipt inspection by the consignee.
Submit GST certificate, PAN card, last three years' financials, experience certificates for similar supply, OEM authorization, warranty certificates, and service center details. Include technical bid documents confirming metal storage bin specifications and post-delivery maintenance capabilities.
Warranty is 3 years from final acceptance or after completion of installation/testing. OEM warranty certificates must be provided at delivery. The seller must guarantee rectification of any breakdown during the warranty period and provide India-based after-sales service.
Scope is strictly supply of goods; no installation required. Post-receipt inspection will be conducted by the consignee at the destination. Pre-dispatch inspection is not mandated. Delivery timelines may extend with the 25% quantity variation provision.
Yes. The purchaser may increase or decrease the bid quantity up to 25% at contracted rates. Additional delivery time is calculated by (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Bidder must demonstrate a well-established installation, commissioning, training, troubleshooting and maintenance service group in India, with service center locations near consignee destinations and details uploaded with the bid.
Without OEM warranty certificates at delivery, the bid risk becomes non-compliant. The bidder should ensure OEM warranties are issued and submitted to meet contractual acceptance and after-sales obligations.
Sign up now to access all documents
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS