Bid Publish Date
10-Sep-2026, 2:26 pm
Bid End Date
01-Oct-2026, 3:00 pm
Location
Progress
Organization: Nlc Tamil Nadu Power Limited. Product: Resin Trap 300NB for Condensate Polishing Unit. Category: ST020120035. Location/Scope: Tamil Nadu; supply only of goods for condensate polishing. Delivery/Value nuances: Quantity flexibility up to 25% under option clause; delivery period calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days. Contractual framework: Payment terms fixed at 45 days from delivery; pre-dispatch inspection not applicable; post-receipt inspection at NTPL stores, Tuticorin. Unique supplier requirements include Material Test Certificate with the supply and adherence to buyer lab acceptance. This tender emphasizes catalog-based itemization and deviation schedules, plus guaranteed conformity to tender terms.
Resin Trap 300NB for Condensate Polishing Unit
Material Test Certificate and buyer acceptance through lab results
Post-receipt inspection at NTPL stores, Tuticorin
Supply of goods only; no BOQ items listed
Deviation schedule required if any deviations from bid terms
Delivery quantity may vary by up to 25% during contract
Post-delivery inspection at NTPL Tuticorin; MT certificates mandatory
Payment terms: 45 days from delivery; 15-day objection window
All payments are made within 45 days from delivery; objections must be raised in writing within 15 days from delivery.
Delivery period adjustments apply when quantity changes; minimum delivery extension is 30 days.
Not specified in provided data; ensure compliance with ATC and post-delivery acceptance criteria.
Must supply Resin Trap components compatible with 300NB piping
Must provide Material Test Certificate and lab acceptance
Must submit PAN, GSTIN, and EFT mandate
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ST020120035 -RESIN TRAP 300NB FOR CONDENSATE POLISHING UNIT
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
150
Delivery Locations
1
Delivery Cities
Tuticorin
Delivery Pincodes
628004
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Manivannan Selvaraj | 628004,NLC TAMILNADU POWER LIMITED 2X500 MW THERMAL POWER PLANT HORBOUR ESTATE, TUTICORIN | Tuticorin | Tamil Nadu | 628004 | 2 | 150 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by Bank
Material Test Certificate to be sent with supply
Custom catalog product name as per bid document
Deviation schedule (if any)
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate; provide Material Test Certificate with the supply, and upload a custom catalog name matching bid terms. Post-delivery inspection occurs at NTPL Tuticorin; payment is 45 days after delivery with a 15-day objection window.
Required documents include PAN Card, GSTIN, cancelled cheque, EFT Mandate, Material Test Certificate with sample supply, and a signed deviation schedule if any deviations exist. Ensure the catalog matches the bid document material name for resin trap 300NB.
Delivery terms allow a 25% quantity variation during contract; the extension formula is (increased quantity ÷ original quantity) × original delivery period with a minimum of 30 days, ensuring timely supply for condensate polishing unit needs.
Post-receipt inspection is conducted at NTPL stores, Tuticorin; pre-dispatch inspection is not applicable unless later ATC specifies otherwise. Material Test Certificate drives initial acceptance, with lab results finalizing acceptance.
Payments are due within 45 days from delivery; if there are objections, they must be raised within 15 days of delivery, ensuring a clear acceptance process and timely cash flow.
Bidder must attach a custom catalogue item name as per bid document and fill the deviation schedule to capture any non-conformities; otherwise, terms are considered accepted and deviations may affect acceptance.