Receiver for Global Navigation Satellite System (GNSS) (V1),Controller for Global Navigation Satell
Chief Engineer Pwd R And B Ladakh
LEH, JAMMU & KASHMIR
Progress
Quantity
3
Category
Receiver for Global Navigation Satellite System (GNSS) (V1)
Bid Type
Two Packet Bid
Chaudhary Bansi Lal University Bhiwani invites bids for Receiver for Global Navigation Satellite System (GNSS) (V1) (Q2), Controller for Global Navigation Satellite System (GNSS) (Q3) in BHIWANI, HARYANA. Quantity: 3. Submission Deadline: 16-01-2026 09: 00: 00. Submit your proposal before the deadline.
Chief Engineer Pwd R And B Ladakh
LEH, JAMMU & KASHMIR
Forest Department
Directorate Of Higher Education
N/a
DEHRADUN, UTTARAKHAND
Directorate Of Technical Education
CHANDIGARH, CHANDIGARH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| COMPATIBLE MAKE / MODEL | Compatible MAKE of GNSS Receiver (Hint:- Sellers may send a request along with product brocure / URL and Datasheets to GeM to add Other makes) | Leica, GeoMax, Topcon, Altus, Sokkia, Spectra Precision, Trimble, Stonex, Carlson, Hemisphere, Novatel, JAVAD, Septentrio, Ashtech, Navcom Technology, PENTAX, Magellan Navigation, Satlab, CHCNAV, Geozone, Naudiz, FOIF |
| CONTROLLER SOFTWARE AND FEATURES | Field Software with free updates upto warranty period inclusive in the scope of supply Controller | Yes |
| CONTROLLER SOFTWARE AND FEATURES | OS Version | 10 and above, 14 and above |
| CONTROLLER SOFTWARE AND FEATURES | Allow Configurable Survey Style for Static Mode | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Allow Configurable Survey Style for Post - Processed Kinematic (PPK) Mode | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Allow Configurable Survey Style for Real - Time Kinematic (RTK) Mode | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Allow Configurable Survey Style for Stand alone L- band Processing mode and and satellite based correction | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Capable of Multi-tasking so that Multiple Operations can be Opened at a time, eg, COGO, Stakeout, Point Manager etc | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Datum and Projection Support and Support Grid Coordinates | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Graphical Support to Visualize Work while Working | Yes |
| CONTROLLER SOFTWARE AND FEATURES | "Support Feature Coding with Attributes for GIS Data Collection, 3D Control coding possible for automatic plot creation " | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Support COGO Functionality and Able to Key in Lines, Sub Divide Lines and Creating Parallel Lines for Staking out Purpose | Yes |
| CONTROLLER SOFTWARE AND FEATURES | User Friendly and Menu Driven for Easy Field Operation | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Able to Store GNSS Data Collected by the RTK System | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Able to email Data Collected in the Field in case Facility is Available and Able to Import & Export User Configurable Files for Effective GIS Support | Yes |
| CONTROLLER SOFTWARE AND FEATURES | "Support Graphical Stakeout, for Points, Lines and DTM as well and Able to Perform Real Time" | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Able to Accept Background Maps in CAD Format | Yes |
| CONTROLLER SOFTWARE AND FEATURES | Ability to Convert Grid to Ground and Vice Versa Conversion Onboard | Yes |
| INTEGRATED PERIPHERALS/ CONNECTIVITY | Camera | With |
| INTEGRATED PERIPHERALS/ CONNECTIVITY | Flash | Yes |
| INTEGRATED PERIPHERALS/ CONNECTIVITY | Integrated GPS | Yes |
| INTEGRATED PERIPHERALS/ CONNECTIVITY | Integrated Compass | Yes |
| INTEGRATED PERIPHERALS/ CONNECTIVITY | Integrated Accelerometer | Yes |
| INTEGRATED PERIPHERALS/ CONNECTIVITY | Integrated Cellular Modem | Yes |
| INTEGRATED PERIPHERALS/ CONNECTIVITY | SBAS Support | No, Yes |
| INTEGRATED PERIPHERALS/ CONNECTIVITY | Audio Jack | No |
| RAM / STORAGE | Memory - RAM | 8 GB |
| RAM / STORAGE | Internal Storage Capacity | 32 GB |
| DISPLAY / KEYPAD | Type of Display | LED, LCD, TFT |
| DISPLAY / KEYPAD | Colour Display | Yes |
| DISPLAY / KEYPAD | Touch Screen Display | Yes |
| DISPLAY / KEYPAD | Sunlight-readable Display | Yes |
| DISPLAY / KEYPAD | Diplay Resolution | WVGA |
| DISPLAY / KEYPAD | Display Size(in inch) | 5.0 to 5.4 |
| DISPLAY / KEYPAD | Alha-Numeric full QWERTY Hard Keypad | Yes |
| BATTERY | Power Source | Internal - Rechargeable Battery |
| BATTERY | Controller Supports 12 V External Battery | No |
| BATTERY | Chemistry of Battery | Li-ion |
| BATTERY | Battery Back Up Time | 16, 20, 24, 30, 34, 36 Or higher |
| BATTERY | Number of Batteries required for operation | 1 |
| BATTERY | Number of Batteries Supplied | 1, 2, 4, 6, 8 Or higher |
| BATTERY | Battery Charger for Rechargeable Batteries inclusive in the scope of supply | Yes |
| BATTERY | 12 V Vehicle Charging Kit inclusive in the scope of supply | No |
| BATTERY | Hot - Swappable b/w External and Internal Power Sources without affecting Data Recording | NA |
| OPERATING CONDITIONS | Minimum Operating Temperature | -30, -40 Or lower |
| OPERATING CONDITIONS | Maximum Operating Temperature | 60, 65, 70, 75 Or higher |
| OPERATING CONDITIONS | Non Condensing Humidity, Rh | 90, 95, 100 Or higher |
| OPERATING CONDITIONS | Ingress Protection | IP 65, IP 66, IP 67, IP 68 Or higher |
| WARRANTY / TRAINING | Warranty | 1, 2, 3 Or higher |
| WARRANTY / TRAINING | Training Type | At Buyer's Premises |
| WARRANTY / TRAINING | Training Period | 3.0 |
| TEST REPORTS | Compliance to Dust test | MIL-STD-810 F, MILSTD-810 G, IEC-60529 or Equivalent Specn |
| TEST REPORTS | Compliance to Water Intrusion test | MIL-STD-810 F, MILSTD-810 G, IEC-60529 or Equivalent Specn |
| TEST REPORTS | Compliance to Vibration / Shock test | MIL-STD-810 F, MILSTD-810 G |
| TEST REPORTS | Availability of Test Reports from Central Govt / NABL approved / ILAC accredited Lab to prove conformity to the specification | No |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
16-Jan-2026, 9:00 am
Opening Date
16-Jan-2026, 9:30 am
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS