Bid Publish Date
08-Aug-2026, 4:24 pm
Bid End Date
24-Aug-2026, 3:00 pm
Value
₹5,00,000
Location
Progress
RAOrganization: Uttar Pradesh Power Corporation Limited (uppcl) under the Energy Department, UP. Product/Service: Carriage, erection, installation, and associated works for PCC/STP poles of 8.5, 11, and 13 meters; transformer installation (25 KVA, 63 KVA, 100 KVA); conductor laying (ACSR Weasal, Rabbit, Dog); stay grouting; insulator fixing; VCB overhauls. Estimated value: ₹500,000. Location: ALIGARH, UTTAR PRADESH. Scope includes pole carriage, erection, grouting, insulator provisioning, conductor installation, transformer installation, and 11KV TPMO/VCB works. The tender highlights a flexible quantity clause up to 25% and extended delivery as per option clause. Unique aspect: broad scope covering multiple line works under a single contract with staged delivery considerations.
Pole carriage and erection for PCC/STP poles at 8.5/11/13 meters
Laying and installation of ACSR conductors (Weasal, Rabbit, Dog)
Installation of 11 KV TPMO and VCB-related overhauls
Transformer installation capacities: 25 KVA, 63 KVA, 100 KVA
Stay set grouting and insulator provisioning
Quantity variation up to 25% with corresponding delivery extension rules
Delivery period starts after the last date of the original delivery order
ATC documents govern bidder submissions and conditions
Payment terms are defined in ATC; no fixed percentages provided in data
Delivery commences from the last date of the original delivery order; subject to option clause extensions
Not specified in available data; refer to ATC for LD/penalty terms
Experience in carrying out pole carriage, erection, and transmission line works
Demonstrated financial capability (supported by financial statements)
Compliance with local procurement and safety regulations and GST/PAN registration
Start
02-Sep-2026, 7:00 pm
End
03-Sep-2026, 7:00 pm
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
2277
Category
Carriage of following PCC STP poles 8.5 11 13 Mtr
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
3 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
2
OEM Avg. Turnover
2
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Carriage of following PCC STP poles 8.5 11 13 Mtr , Carriage of line material , Erection of PCC and STP poles 8.5, 11 and 13 Mtr , Erection of Double poles 8.5, 11 and 13 Mtr , Installation and fixing of 11 KV TPMO. , Erection and Grouting of stay set , Providing and fixing of insulator , Laying of ACSR Weasal, Rabbit and Dog Conductor. , Erection of ABC Conductor , Grouting of PCC and STP poles , Making of plinth , Carriage and Installation of 25 KVA Transformer , Carriage and Installation of 63 KVA Transformer , Carriage and Installation of 100 KVA Transformer , 11KV VCB Including complete overhauling repair
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
21
Delivery Locations
1
Delivery Cities
Aligarh
Delivery Pincodes
202001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Rohitas Singh Jangpangi | 202001,Superintending Engineer, EDC-II Aligarh, SCADA, Building, Lal Diggi, Aligarh-202001 | Aligarh | Uttar Pradesh | 202001 | 70 | 21 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Carriage of following PCC STP poles 8.5 11 13 Mtr
Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road Including the work of its loading and unloading at the respective ends also including the work of dragging etc. and also including the cost of labour T P carrier etc required for proper completion of work. (Dist. O to 50 Kms.). PCC STP poles 8.5 11 13 Mtr.
Carriage of line material
Carriage of line material viz LT Cable, Conductor Gi earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc, and also including the cost of labour, T P carrier etc. required for proper completion of work. (Dist. 0 10 50 Km)
Erection of PCC and STP poles 8.5, 11 and 13 Mtr
Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Erection of Double poles 8.5, 11 and 13 Mtr
Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Installation and fixing of 11 KV TPMO.
Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Erection and Grouting of stay set
Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work
Providing and fixing of insulator
Providing and fixing of stay insulator
Laying of ACSR Weasal, Rabbit and Dog Conductor.
Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work
Erection of ABC Conductor
ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm
Grouting of PCC and STP poles
Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms
Making of plinth
Making the plinth of Steel poles
Carriage and Installation of 25 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
Carriage and Installation of 63 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
Carriage and Installation of 100 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
11KV VCB Including complete overhauling repair
Complete Repairing of Different make 11KV VCB Including complete overhauling repair replacement of defective and damaged minor spare that are tripping coils tripping plate and nut bolt with complete wiring T P etc. for proper completion of work the repairs circuit breaker will be tested on load. The spare taken out from circuit breaker at the time of repair shall be return to JE concerned who will be liable to hand over such scrape to store Aligarh.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Carriage of following PCC STP poles 8.5 11 13 Mtr | Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road Including the work of its loading and unloading at the respective ends also including the work of dragging etc. and also including the cost of labour T P carrier etc required for proper completion of work. (Dist. O to 50 Kms.). PCC STP poles 8.5 11 13 Mtr. | 70 | nos | edcaligarh2consignee | 21 | |
| 2 | Carriage of line material | Carriage of line material viz LT Cable, Conductor Gi earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc, and also including the cost of labour, T P carrier etc. required for proper completion of work. (Dist. 0 10 50 Km) | 35 | nos | edcaligarh2consignee | 21 | |
| 3 | Erection of PCC and STP poles 8.5, 11 and 13 Mtr | Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 60 | nos | edcaligarh2consignee | 21 | |
| 4 | Erection of Double poles 8.5, 11 and 13 Mtr | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 5 | nos | edcaligarh2consignee | 21 | |
| 5 | Installation and fixing of 11 KV TPMO. | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 5 | nos | edcaligarh2consignee | 21 | |
| 6 | Erection and Grouting of stay set | Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work | 55 | nos | edcaligarh2consignee | 21 | |
| 7 | Providing and fixing of insulator | Providing and fixing of stay insulator | 45 | nos | edcaligarh2consignee | 21 | |
| 8 | Laying of ACSR Weasal, Rabbit and Dog Conductor. | Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work | 1,503 | mtr | edcaligarh2consignee | 21 | |
| 9 | Erection of ABC Conductor | ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm | 465 | mtr | edcaligarh2consignee | 21 | |
| 10 | Grouting of PCC and STP poles | Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms | 8 | nos | edcaligarh2consignee | 21 | |
| 11 | Making of plinth | Making the plinth of Steel poles | 5 | nos | edcaligarh2consignee | 21 | |
| 12 | Carriage and Installation of 25 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 4 | nos | edcaligarh2consignee | 21 | |
| 13 | Carriage and Installation of 63 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 2 | nos | edcaligarh2consignee | 21 | |
| 14 | Carriage and Installation of 100 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 2 | nos | edcaligarh2consignee | 21 | |
| 15 | 11KV VCB Including complete overhauling repair | Complete Repairing of Different make 11KV VCB Including complete overhauling repair replacement of defective and damaged minor spare that are tripping coils tripping plate and nut bolt with complete wiring T P etc. for proper completion of work the repairs circuit breaker will be tested on load. The spare taken out from circuit breaker at the time of repair shall be return to JE concerned who will be liable to hand over such scrape to store Aligarh. | 13 | nos | edcaligarh2consignee | 21 |
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of related line work (pole carriage, erection, conductor laying, transformer installation)
Financial statements (last 2-3 years) demonstrating financial capability
Emd/Security deposit documentation as specified in ATC
Technical bid documents and compliance certificates if specified
OEM authorizations or dealership certificates for specified works (if required by ATC)
Key insights about UTTAR PRADESH tender market
Bidders should review the ATC, prepare GST and PAN, gather experience certificates for pole carriage and transformer installation, and ensure financial statements are ready. The bid requires adherence to option clauses allowing ±25% quantity changes, with delivery extensions as defined by the formula in the ATC.
Required documents include GST certificate, PAN, experience certificates in line works, financial statements, EMD documentation as specified, and any OEM authorizations. Ensure technical bid compliance as per ATC and submit the ATC receipt with bid.
Key scopes cover carriage and erection of PCC/STP poles (8.5/11/13 m), stay grouting, insulator provisioning, conductor laying (ACSR Weasal/Rabbit/Dog), 11 KV TPMO installation, and transformer installation (25/63/100 KVA). All activities must align with ATC terms.
Estimated value is ₹500,000. The EMD amount is not specified in the data provided; bidders must check the ATC for the exact EMD requirement and submission method (online or demand draft).
Delivery timelines start from the last date of the original delivery order; extension is governed by the option clause. Minimum extension time is 30 days if required, with calculated delays for increased quantity.
No explicit standards are listed in the data; bidders should review the ATC for any IS/ISO or OEM requirements and provide compliance certificates and authorized dealer letters as applicable.
Detailed payment terms are defined in the ATC; bidders should confirm milestone payments related to delivery of poles, erection, and transformer installation, along with any advance and post-delivery payment schedules.
Eligibility requires GST, PAN, experience proofs, financials, and EMD documentation as per ATC. OEM authorizations may be required if specified; verify with the ATC and ensure all documents are valid and current.