TenderDekho Logo
Closed GEM

Contract Bidding Open For Jack Hammer,Washer,Pusher Leg with attachment mounting clamp and brackets,Lubricator,Pneumatic air in DIBANG VALLEY, ARUNACHAL PRADESH

Bid Publish Date

22-Apr-2025, 3:44 pm

Bid End Date

13-May-2025, 4:00 pm

EMD

₹1,00,000

Progress

Issue22-Apr-2025, 3:44 pm
AwardPending
Explore all 5 tabs to view complete tender details

Quantity

879

Bid Type

Two Packet Bid

Categories 18

A tender has been published for Border Road Organisation Jack Hammer, Washer, Pusher Leg with attachment mounting clamp and brackets, Lubricator, Pneumatic air hose, Drill rod 32x4000, Drill rod 32x1800, Drill rod 32x1200, Drill rod 32x600, Drill rod 32x800, Drill rod 32x1600, Drill rod 32x2400, Drill rod 32x3200, Claw male, Claw female, Hose clamp in DIBANG VALLEY, ARUNACHAL PRADESH. Quantity: 879 by. Submission Deadline: 13-05-2025 16: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Jack Hammer , Washer , Pusher Leg with attachment mounting clamp and brackets , Lubricator , Pneumatic air hose , Drill rod 32x4000 , Drill rod 32x1800 , Drill rod 32x1200 , Drill rod 32x600 , Drill rod 32x800 , Drill rod 32x1600 , Drill rod 32x2400 , Drill rod 32x3200 , Claw male , Claw female , Hose clamp

Authority Records

MINISTRY OF DEFENCEDEFENCE DEPARTMENTBORDER ROADS ORGANISATION

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7759571.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 16 Items Sign in for GEM prices

#1

Jack Hammer

Jack Hammer Rock drilling model RH658-5L Make Atlas copco

9 nos Delivery: 30 days
#2

Washer

Washer for claw coupling 3/4 inch dia

250 nos Delivery: 30 days
#3

Pusher Leg with attachment mounting clamp and brackets

Pusher Leg with attachment mounting clamp and brackets atlas copco BMK625

4 nos Delivery: 30 days
#4

Lubricator

Lubricator size 3/4 inch

6 nos Delivery: 30 days
#5

Pneumatic air hose

Pneumatic air hose pipe size 3/4 inch dia inner 2 brand having conforming to IS 911-1968446-1980

300 mtr Delivery: 30 days
#6

Drill rod 32x4000

Integral Drill Rods, 108 mm shank x 22 mm Hex and length Drilling Rods size 32mm x 4000 mm make Atlas Copco

10 nos Delivery: 30 days
#7

Drill rod 32x1800

Integral Drill Rods, 108 mm shank x 22 mm Hex and length Drilling Rods size 32mm x 1800 mm make Atlas Copco

35 nos Delivery: 30 days
#8

Drill rod 32x1200

Integral Drill Rods, 108 mm shank x 22 mm Hex and length Drilling Rods size 32mm x 1200 mm make Atlas Copco

35 nos Delivery: 30 days
#9

Drill rod 32x600

Integral Drill Rods, 108 mm shank x 22 mm Hex and length Drilling Rods size 32mm x 600 mm make Atlas Copco

25 nos Delivery: 30 days
#10

Drill rod 32x800

Integral Drill Rods, 108 mm shank x 22 mm Hex and length Drilling Rods size 32mm x 800 mm make Atlas Copco

20 nos Delivery: 30 days
#11

Drill rod 32x1600

Integral Drill Rods, 108 mm shank x 22 mm Hex and length Drilling Rods size 32mm x 1600 mm make Atlas Copco

35 nos Delivery: 30 days
#12

Drill rod 32x2400

Integral Drill Rods, 108 mm shank x 22 mm Hex and length Drilling Rods size 32mm x 2400 mm make Atlas Copco

35 nos Delivery: 30 days
#13

Drill rod 32x3200

Integral Drill Rods, 108 mm shank x 22 mm Hex and length Drilling Rods size 32mm x 3200 mm make Atlas Copco

25 nos Delivery: 30 days
#14

Claw male

Claw coupling male 20 mm

20 nos Delivery: 30 days
#15

Claw female

Claw coupling female 20 mm

20 nos Delivery: 30 days
#16

Hose clamp

Hose clamp 3/4 Inch with nut and bolt

50 set Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

What are the qualification requirements for GEM/2025/B/6157958?

The qualification requirements for this tender involve being a registered entity in India, having valid GST registration, and providing necessary tax compliance certificates. Additionally, bidders must demonstrate prior experience in the supply of similar products, specifically drilling accessories.

What certificates are required for this tender?

Bidders are required to submit several important certificates including a valid GST registration, PAN card, and any specific quality compliance certifications relevant to drilling equipment. It is crucial that all submitted documents authenticate the eligibility of the bidder as per the stipulated criteria.

What is the registration process for submitting a bid?

To participate in the tender, bidders must register on the designated e-Procurement platform. The registration process typically includes filling out necessary forms, providing documentation such as company registration details, GST number, and any licensure details. It is advisable to ensure all documentation is digitally verified.

What are the accepted document formats for submission?

All documents required for this tender should be submitted primarily in PDF format to maintain consistency and prevent any alterations. Other formats such as Excel or Word are usually not accepted unless specified otherwise in the tender document.

What are the payment terms for the awarded contract?

The payment terms for this tender will typically include upfront payments linked to the delivery milestones, along with provisions for performance security that may need to be established before the completion of contract stipulations. Final payments are often made upon successful delivery and acceptance of the products.