Progress
The Indian Army, Department of Military Affairs, located in Bathinda, Punjab 151001, is inviting bids for a broad set of automotive assembly and accessory components including LOCK ASSY STEERING, CLUTCH ASSY, TRAFFICATOR LH/RH REAR, FLANGE, CABLE ASSY SPEEDOMETER, OIL FILTER, AIR CLEANER HOSE, BEARING, HOSE FRONT FLEXIBLE, POLE SCREW and HIGH PRESSURE HOSE. The Schedule covers a total of 12 items, with unspecified quantities in the BOQ but a clear procurement intent for multiple vehicle-system components. Key tender differentiators include an option clause permitting up to 25% quantity variation and extension of delivery periods, ensuring flexibility in contract execution. The tender emphasizes vendor code creation documentation and standard GST/PAN/EFT compliance as part of bid submission.
Automotive component categories: LOCK ASSY STEERING, CLUTCH ASSY, TRAFFICATOR LH REAR, TRAFFICATOR RH REAR, FLANGE, CABLE ASSY SPEEDOMETER, ELEMENT OIL FILTER, AIR CLEANER HOSE, BEARING, HOSE FRONT FLEXIBLE, POLE SCREW, HIGH PRESSURE HOSE
Total items: 12 (BOQ shows 12 items, exact quantities not disclosed)
Delivery terms governed by option clause: +/- up to 25% quantity during contract; delivery period adjustments follow calculated formula
Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate required with bid submission
No explicit technical standards or OEM brand requirements provided in data
Option clause allows ±25% quantity variation during contract and currency
Bid submission requires PAN, GSTIN, Cancelled Cheque, EFT Mandate
Delivery schedule tied to original delivery order with extension rules
No explicit payment terms stated in the data; bidders should assume standard government procurement practice and await further clarification.
Delivery period begins after last date of original delivery order; extended period calculated if option clause exercised; minimum 30 days added when computing extension.
Not specified in provided data; bidders should watch for LD clauses in full tender terms.
Must provide PAN, GSTIN, Cancelled Cheque, EFT Mandate
Compliance with option clause for quantity variability up to 25%
No explicit EMD amount disclosed; bidders should monitor for standard EMD/Performance bond terms
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | BRAR TRADERS Under PMA | - | 02-10-2026 22:55:04 | |
| 2 | SEHAJ ENTERPRISES Under PMA | - | 30-09-2026 14:59:31 | |
| 3 | SINGH TRADERS Under PMA | - | 02-10-2026 16:40:34 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | BRAR TRADERS(MSE)( MSE Social Category:General ) Under PMA | Item Categories : LOCK ASSY STEERING,CLUTCH ASSY FAN,TRAFFICATOR ASSY LH REAR,FLANGE,TRAFFICATOR ASSY RH REAR,CABLE A | |
| L2 | SEHAJ ENTERPRISES (MSE)( MSE Social Category:General ) Under PMA | Item Categories : LOCK ASSY STEERING,CLUTCH ASSY FAN,TRAFFICATOR ASSY LH REAR,FLANGE,TRAFFICATOR ASSY RH REAR,CABLE A | |
| L3 | SINGH TRADERS (MSE)( MSE Social Category:General ) Under PMA | Item Categories : LOCK ASSY STEERING,CLUTCH ASSY FAN,TRAFFICATOR ASSY LH REAR,FLANGE,TRAFFICATOR ASSY RH REAR,CABLE A |
Quantity
28
Category
LOCK ASSY STEERING
Bid Type
Two Packet Bid
Bid Validity
160 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Item Category
LOCK ASSY STEERING , CLUTCH ASSY FAN , TRAFFICATOR ASSY LH REAR , FLANGE , TRAFFICATOR ASSY RH REAR , CABLE ASSY SPEEDOMETER , ELEMENT OIL FILTER , AIR CLEANER HOSE , BEARING , HOSE FRONT FLEXIBLE , POLE SCREW , HIGH PRESSURE HOSE
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Bathinda
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Bathinda | Bathinda | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
LOCK ASSY STEERING
LOCK ASSY STEERING FOR MARUTI GYPSY
CLUTCH ASSY FAN
CLUTCH ASSY FAN FOR MARUTI GYPSY
TRAFFICATOR ASSY LH REAR
TRAFFICATOR ASSY LH REAR FOR ROYAL ENFIELD
FLANGE
FLANGE FOR ROYAL ENFIELD
TRAFFICATOR ASSY RH REAR
TRAFFICATOR ASSY RH REAR FOR ROYAL ENFIELD
CABLE ASSY SPEEDOMETER
CABLE ASSY SPEEDOMETER FOR ROYAL ENFIELD
ELEMENT OIL FILTER
ELEMENT OIL FILTER FOR ROYAL ENFIELD
AIR CLEANER HOSE
AIR CLEANER HOSE FOR MARUTI GYPSY
BEARING
BEARING FOR MARUTI GYPSY
HOSE FRONT FLEXIBLE
HOSE FRONT FLEXIBLE FOR MARUTI GYPSY
POLE SCREW
POLE SCREW FOR TATA 2.5 TON
HIGH PRESSURE HOSE
HIGH PRESSURE HOSE FOR TATRA
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | LOCK ASSY STEERING | LOCK ASSY STEERING FOR MARUTI GYPSY | 1 | nos | 265tapan | 15 | |
| 2 | CLUTCH ASSY FAN | CLUTCH ASSY FAN FOR MARUTI GYPSY | 1 | nos | 265tapan | 15 | |
| 3 | TRAFFICATOR ASSY LH REAR | TRAFFICATOR ASSY LH REAR FOR ROYAL ENFIELD | 2 | nos | 265tapan | 15 | |
| 4 | FLANGE | FLANGE FOR ROYAL ENFIELD | 2 | nos | 265tapan | 15 | |
| 5 | TRAFFICATOR ASSY RH REAR | TRAFFICATOR ASSY RH REAR FOR ROYAL ENFIELD | 2 | nos | 265tapan | 15 | |
| 6 | CABLE ASSY SPEEDOMETER | CABLE ASSY SPEEDOMETER FOR ROYAL ENFIELD | 1 | nos | 265tapan | 15 | |
| 7 | ELEMENT OIL FILTER | ELEMENT OIL FILTER FOR ROYAL ENFIELD | 1 | nos | 265tapan | 15 | |
| 8 | AIR CLEANER HOSE | AIR CLEANER HOSE FOR MARUTI GYPSY | 1 | nos | 265tapan | 15 | |
| 9 | BEARING | BEARING FOR MARUTI GYPSY | 2 | nos | 265tapan | 15 | |
| 10 | HOSE FRONT FLEXIBLE | HOSE FRONT FLEXIBLE FOR MARUTI GYPSY | 2 | nos | 265tapan | 15 | |
| 11 | POLE SCREW | POLE SCREW FOR TATA 2.5 TON | 12 | nos | 265tapan | 15 | |
| 12 | HIGH PRESSURE HOSE | HIGH PRESSURE HOSE FOR TATRA | 1 | nos | 265tapan | 15 |
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate copy certified by the Bank
Vendor Code Creation documents
Key insights about PUNJAB tender market
Bidders must prepare PAN, GSTIN, Cancelled Cheque, and bank-certified EFT Mandate, and complete vendor-code creation. The tender includes an option clause permitting up to 25% quantity variation and delivery-time adjustments. Ensure 12 listed item categories are interpreted for your supply capabilities and align with potential military vehicle maintenance needs.
Required documents include PAN Card copy, GSTIN copy, Cancelled Cheque, EFT Mandate certified by bank, and vendor-code creation data. Ensure the GST/BIN details match your registration, and attach any OEM authorizations if applicable to your supplied components.
The provided data lists component categories such as LOCK ASSY STEERING and HIGH PRESSURE HOSE but does not publish exact specifications. Bidders should prepare by validating compatibility with military vehicle models and be ready to provide certificates for material, finish, and performance as per final tender terms.
Delivery timing follows the original delivery order; if the option clause is exercised, the extra time is calculated by (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days, and may extend to the original delivery period.
The tender data provided does not specify an EMD amount. Bidders should anticipate standard government EMD requirements and await supplementary tender documents for exact figures and submission method.
Bidders must submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate along with other bid documents to create or validate the vendor code. Ensure the EFT mandate matches bank records and that PAN/GSTIN are active.
No explicit OEM brand or standard-product specifications are published in the available data. Vendors should be prepared to supply generic automotive components that meet military-grade fit, form, and function and await final technical clarifications and any brand-specific compliance.
If quantities change by up to 25%, the delivery period extension is calculated to ensure timely supply. The formula uses (increased quantity ÷ original quantity) × original delivery period, with a mandatory minimum of 30 days; extensions can reach the contracted period.