TenderDekho Logo
GEM

Contract Bidding Open For SUPPLY OF DISTILLED WATER,SUPPLY OF PETROLEUM JELLY,SUPPLY OF 200A HRC FUSE,SUPPLY OF CASING CAPPIN in DAKSHINA KANNADA, KARNATAKA

Bid Publish Date

14-May-2026, 12:48 pm

Bid End Date

25-May-2026, 1:00 pm

EMD

₹96,400

Progress

Issue14-May-2026, 12:48 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

31415

Category

SUPPLY OF DISTILLED WATER

Bid Type

Two Packet Bid

Categories 134

ELECTRICAL SOLDERING FLUID NATURAL FUELS APPARELS CONTROLLER SWITCHES VOLTAGE METERS POLYETHYLENE PIPE FUSES ABRASIVE PRODUCT PLUMBING WORK BULB RING STANDALONE AC PIR POLYSTYRENE SHEET ANGLE GRINDER POWER CABLE CABBING EQUIPMENTS COMPRESSOR TUBE AND FITTING AIR COOLED ENGINE DESERT COOLER ELECTRICAL PRODUCTS SENSOR BUS CABLE WIRING ASSEMBLY MOBIL OIL WELDING FLUX LED STREET LIGHT WHEAT FLOUR HEATING WIRE HARDWARE AND FASTENERS LED LIGHT PANEL GEYSER JOINTING OF PIPE SUPPLY OF SCHOOL UNIFORM WELDING BRAZING AND SOLDERING SERVICES RELAY SUPPLY AGRICULTURAL PUMP STRIP ABRASIVE POLISHERS DISCRETE COMPONENTS ELECTRICAL WIRE XLPE CABLE LIGHTENING PROTECTION DEVICE ROTARY SWITCHES AMPOULE FILLING EQUIPMENT CLOTHING GRINDER MCCB INSTRUMENTATION CABLE SOLDERING EQUIPMENT DEEPWELL PUMPS IRRIGATION PUMPS WATER SUPPLY PANEL STOMACHERS PUMPS CAPACITOR ELASTROMERIC PIPE SOCKET JAR DESICCATORS SEALING RING ACP EXTENSION CORD ABRASIVE STONES ABRASIVES AND ABRASIVE MEDIA HIGH TENSION PANEL HOLDING AND CLAMPING TOOLS LED LUMINARIES COILED CABLE LOCAL AREA NETWORK CABLING SWITCH GEAR FLUID MECHANICS EQUIPMENT VOLTMETER TUBE LIGHT ALARM SYSTEMS LFH CABLE HOOK UP WIRES GLUCOMETER SWITCH BOX LED LIGHT PNEUMATIC BLOWERS OR DRYERS DESICCANTS POWER WIRE ELECTRICAL CONDENSER TUBE DISTILLED WATER SCBA BOX OIL PUMP TAPE SUPPLY VOLT METER WIRE FILTER RETAINERS BATTERY ACID HYDROMETERS FUEL PUMP BRONZE PIPE CLAMPS PROXIMITY SENSORS WRENCHES AND DRIVERS CUTTING WHEEL LFH WIRE EXTENSION BOARD ART BOARD BARE CABLE GAS BURNERS TRANSITION METALS SOLID AND GEL FUELS TOOL KIT CABLE LIMIT SWITCHES FIRE BREATHING APPARATUS LUBE OIL THERMOCOL SUBMERSIBLE PUMP SOLDERING GUN AMP SWITCH BATTERY VALVE PARTS AND ACCESSORIES CABLE SPLICING KITS FLEXIBLE PIPE SCREWS TIMER PEB WATER PUMP CABLE SUPPLY MASTIC WATERING FACILITY AMMETERS FAN POLYMERASE CHAIN REACTION PCR SOLDERING FLUX PHENOL FORMALDEHYDE RESIN

Hindustan Petroleum Corporation Ltd has released a public tender for SUPPLY OF DISTILLED WATER, SUPPLY OF PETROLEUM JELLY, SUPPLY OF 200A HRC FUSE, SUPPLY OF CASING CAPPIN in DAKSHINA KANNADA, KARNATAKA. Quantity: 31415. Submission Deadline: 25-05-2026 13: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9329007.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 133 Items Sign in for GEM prices

#1

SUPPLY OF DISTILLED WATER

SUPPLY OF DISTILLED WATER

500 ltr Delivery: 548 days
#2

SUPPLY OF PETROLEUM JELLY

SUPPLY OF PETROLEUM JELLY

24 kg Delivery: 548 days
#3

SUPPLY OF 200A HRC FUSE

SUPPLY OF 200A HRC FUSE

25 eac Delivery: 548 days
#4

SUPPLY OF CASING CAPPING 1 IN

SUPPLY OF CASING CAPPING 1 IN

170 m Delivery: 548 days
#5

SUPPLY OF CASING CAPPING 0.75 IN

SUPPLY OF CASING CAPPING 0.75 IN

170 m Delivery: 548 days
#6

SUPPLY OF CASING CAPPING 2 IN

SUPPLY OF CASING CAPPING 2 IN

120 m Delivery: 548 days
#7

SUPPLY OF INSULATION TAPE

SUPPLY OF INSULATION TAPE

400 eac Delivery: 548 days
#8

SUPPLY OF LED BULB 50W

SUPPLY OF LED BULB 50W

90 eac Delivery: 548 days
#9

SUPPLY OF SCREWS 1 IN

SUPPLY OF SCREWS 1 IN

1,750 eac Delivery: 548 days
#10

SUPPLY OF SCREWS 1.5 IN

SUPPLY OF SCREWS 1.5 IN

1,750 eac Delivery: 548 days
#11

SUPPLY OF SCREWS 2 IN

SUPPLY OF SCREWS 2 IN

1,750 eac Delivery: 548 days
#12

SUPPLY OF NAIL STEEL 2 IN

SUPPLY OF NAIL STEEL 2 IN

25 kg Delivery: 548 days
#13

SUPPLY OF AAA CELLS

SUPPLY OF AAA CELLS

300 eac Delivery: 548 days
#14

SUPPLY OF AA CELLS

SUPPLY OF AA CELLS

400 eac Delivery: 548 days
#15

SUPPLY OF WIRE 1SQMM

SUPPLY OF WIRE 1SQMM

1,000 m Delivery: 548 days
#16

SUPPLY OF WIRE 1.5SQMM

SUPPLY OF WIRE 1.5SQMM

1,000 m Delivery: 548 days
#17

SUPPLY OF WIRE 2.5SQMM

SUPPLY OF WIRE 2.5SQMM

1,000 m Delivery: 548 days
#18

SUPPLY OF WIRE 4.0SQMM

SUPPLY OF WIRE 4.0SQMM

1,000 m Delivery: 548 days
#19

SUPPLY OF WIRE 6SQMM

SUPPLY OF WIRE 6SQMM

500 m Delivery: 548 days
#20

SUPPLY OF WIRE 10SQMM

SUPPLY OF WIRE 10SQMM

800 m Delivery: 548 days
#21

SUPPLY OF WIRE 16SQMM

SUPPLY OF WIRE 16SQMM

500 eac Delivery: 548 days
#22

SUPPLY OF SOLDERING WIRE 250GM

SUPPLY OF SOLDERING WIRE 250GM

19 eac Delivery: 548 days
#23

SUPPLY OF SOLDERING FLUX

SUPPLY OF SOLDERING FLUX

20 eac Delivery: 548 days
#24

SUPPLY OF RING LUGS 4sqmm

SUPPLY OF RING LUGS 4sqmm

800 eac Delivery: 548 days
#25

SUPPLY OF RING LUGS 6sqmm

SUPPLY OF RING LUGS 6sqmm

800 eac Delivery: 548 days
#26

SUPPLY OF RING LUGS 10sqmm

SUPPLY OF RING LUGS 10sqmm

800 eac Delivery: 548 days
#27

SUPPLY OF LUGS PIN ALL SIZE 0.5 to 2.5sqmm

SUPPLY OF LUGS PIN ALL SIZE 0.5 to 2.5sqmm

800 eac Delivery: 548 days
#28

SUPPLY OF LUGS PIN ALL SIZE 3 to 6sqmm

SUPPLY OF LUGS PIN ALL SIZE 3 to 6sqmm

800 eac Delivery: 548 days
#29

SUPPLY OF SILICON SEALANT

SUPPLY OF SILICON SEALANT

14 eac Delivery: 548 days
#30

SUPPLY OF ARALDITE

SUPPLY OF ARALDITE

22 eac Delivery: 548 days
#31

SUPPLY OF M SEAL

SUPPLY OF M SEAL

150 eac Delivery: 548 days
#32

SUPPLY OF FLEXIBLE PIPE 1 IN

SUPPLY OF FLEXIBLE PIPE 1 IN

400 m Delivery: 548 days
#33

SUPPLY OF FLEXIBLE PIPE 2 IN

SUPPLY OF FLEXIBLE PIPE 2 IN

250 m Delivery: 548 days
#34

SUPPLY OF MCBs 1P 6 to 32A

SUPPLY OF MCBs 1P 6 to 32A

45 eac Delivery: 548 days
#35

SUPPLY OF MCBs 1P 63A

SUPPLY OF MCBs 1P 63A

30 eac Delivery: 548 days
#36

SUPPLY OF MCBs 2P 16 to 32A

SUPPLY OF MCBs 2P 16 to 32A

55 eac Delivery: 548 days
#37

SUPPLY OF MCBs 2P 64A

SUPPLY OF MCBs 2P 64A

40 eac Delivery: 548 days
#38

SUPPLY OF MCBs 4P 32A

SUPPLY OF MCBs 4P 32A

55 eac Delivery: 548 days
#39

SUPPLY OF MCBs 4P,63A

SUPPLY OF MCBs 4P,63A

50 eac Delivery: 548 days
#40

SUPPLY OF SWITCH 6A

SUPPLY OF SWITCH 6A

180 eac Delivery: 548 days
#41

SUPPLY OF SOCKET 6A

SUPPLY OF SOCKET 6A

170 eac Delivery: 548 days
#42

SUPPLY OF SWITCH BOX 4 MODULE

SUPPLY OF SWITCH BOX 4 MODULE

90 eac Delivery: 548 days
#43

SUPPLY OF SWITCH BOX 6 MODULE

SUPPLY OF SWITCH BOX 6 MODULE

90 eac Delivery: 548 days
#44

SUPPLY OF 3 PIN TOP 6A

SUPPLY OF 3 PIN TOP 6A

120 eac Delivery: 548 days
#45

SUPPLY OF 3 PIN TOP 16A

SUPPLY OF 3 PIN TOP 16A

120 eac Delivery: 548 days
#46

SUPPLY OF EARTH PIT NUT BOLT WASHER SS,8X38mm

SUPPLY OF EARTH PIT NUT BOLT WASHER SS,8X38mm

1,500 eac Delivery: 548 days
#47

SUPPLY OF EARTH PIT NUT BOLT WASHER SS,8X50mm

SUPPLY OF EARTH PIT NUT BOLT WASHER SS,8X50mm

1,500 eac Delivery: 548 days
#48

SUPPLY OF MS ELECTRICAL CONDUIT PIPE CLAMP 0.75 IN 1 IN

SUPPLY OF MS ELECTRICAL CONDUIT PIPE CLAMP 0.75 IN 1 IN

300 eac Delivery: 548 days
#49

SUPPLY OF PUC FOAM

SUPPLY OF PUC FOAM

110 eac Delivery: 548 days
#50

SUPPLY OF DOUBLE-SIDED TAPE

SUPPLY OF DOUBLE-SIDED TAPE

150 eac Delivery: 548 days
#51

SUPPLY OF CUTTING WHEEL 4 IN

SUPPLY OF CUTTING WHEEL 4 IN

200 eac Delivery: 548 days
#52

SUPPLY OF 6A FUSE

SUPPLY OF 6A FUSE

200 eac Delivery: 548 days
#53

SUPPLY OF TNC SWITCH 25A 660V

SUPPLY OF TNC SWITCH 25A 660V

29 eac Delivery: 548 days
#54

Panel Mount LED Indicator Red Green Yellow

Panel Mount LED Indicator Red Green Yellow

300 eac Delivery: 548 days
#55

Panel Mount LED Indicator Blue White

Panel Mount LED Indicator Blue White

300 eac Delivery: 548 days
#56

SUPPLY OF MULTIFUNCTION METER 3-PHASE LM 13XX SERIES

SUPPLY OF MULTIFUNCTION METER 3-PHASE LM 13XX SERIES

15 eac Delivery: 548 days
#57

SUPPLY OF MULTIFUNCTION METER 3-PHASE 440 443 SERIES

SUPPLY OF MULTIFUNCTION METER 3-PHASE 440 443 SERIES

15 eac Delivery: 548 days
#58

Insulation Mat 6.6 KV

Insulation Mat 6.6 KV

150 m Delivery: 548 days
#59

Insulation Mat 66 KV

Insulation Mat 66 KV

150 m Delivery: 548 days
#60

Silica Gel

Silica Gel

60 kg Delivery: 548 days
#61

Earth Pit Board

Earth Pit Board

240 eac Delivery: 548 days
#62

SUPPLY OF INDUSTRIAL GRADE CRYSTALLINE WHITE SALT FOR EARTHING APPLICATIONS

SUPPLY OF INDUSTRIAL GRADE CRYSTALLINE WHITE SALT FOR EARTHING APPLICATIONS

720 kg Delivery: 548 days
#63

SUPPLY OF EARTHING CHARCOAL WOOD BASED

SUPPLY OF EARTHING CHARCOAL WOOD BASED

600 kg Delivery: 548 days
#64

Foam Board

Foam Board

400 sqft Delivery: 548 days
#65

GI Strip 25X3MM

GI Strip 25X3MM

150 mr Delivery: 548 days
#66

GI Strip 25X6MM

GI Strip 25X6MM

300 mr Delivery: 548 days
#67

GI Strip 50X3MM

GI Strip 50X3MM

80 m Delivery: 548 days
#68

GI Strip 50X6MM

GI Strip 50X6MM

400 m Delivery: 548 days
#69

GI Strip 75X6MM

GI Strip 75X6MM

40 m Delivery: 548 days
#70

ACP Board

ACP Board

250 sqft Delivery: 548 days
#71

HT 6.6Kv Grease

HT 6.6Kv Grease

12 kg Delivery: 548 days
#72

HT 66Kv Grease

HT 66Kv Grease

8 kg Delivery: 548 days
#73

SUPPLY OF ANALOG AMMETER 0 - 600A

SUPPLY OF ANALOG AMMETER 0 - 600A

8 eac Delivery: 548 days
#74

SUPPLY OF ANALOG VOLTMETER 0 - 7.2 KV

SUPPLY OF ANALOG VOLTMETER 0 - 7.2 KV

5 eac Delivery: 548 days
#75

End Termination Kit 66kV

End Termination Kit 66kV

1 eac Delivery: 548 days
#76

End Termination Kit 6.6kV

End Termination Kit 6.6kV

1 eac Delivery: 548 days
#77

SUPPLY OF 3-CORE 1.5 SQMM JOINTING KIT

SUPPLY OF 3-CORE 1.5 SQMM JOINTING KIT

30 eac Delivery: 548 days
#78

SUPPLY OF 3-CORE 2.5 SQMM ,JOINTING KIT

SUPPLY OF 3-CORE 2.5 SQMM ,JOINTING KIT

35 eac Delivery: 548 days
#79

SUPPLY OF 3-CORE 4 SQMM JOINTING KIT

SUPPLY OF 3-CORE 4 SQMM JOINTING KIT

25 eac Delivery: 548 days
#80

SUPPLY OF 3-CORE 6 SQMM JOINTING KIT

SUPPLY OF 3-CORE 6 SQMM JOINTING KIT

25 eac Delivery: 548 days
#81

SUPPLY OF 3-CORE 10 SQMM JOINTING KIT

SUPPLY OF 3-CORE 10 SQMM JOINTING KIT

21 eac Delivery: 548 days
#82

SUPPLY OF 3-CORE 16 SQM JOINTING KIT

SUPPLY OF 3-CORE 16 SQM JOINTING KIT

25 eac Delivery: 548 days
#83

Screwdriver Set

Screwdriver Set

10 set Delivery: 548 days
#84

Supply of Rotary Cam Switch Model 11S34GYR 25A 3Pole 7Position

Supply of Rotary Cam Switch Model 11S34GYR 25A 3Pole 7Position

20 eac Delivery: 548 days
#85

Industrial Socket 16A

Industrial Socket 16A

100 eac Delivery: 548 days
#86

SUPPLY OF THOMSON BATTERY HYDROMETER

SUPPLY OF THOMSON BATTERY HYDROMETER

30 eac Delivery: 548 days
#87

Wire Sleeves 10-100SQM

Wire Sleeves 10-100SQM

150 m Delivery: 548 days
#88

Tool Box

Tool Box

15 eac Delivery: 548 days
#89

Capacitor 6 MFD

Capacitor 6 MFD

90 eac Delivery: 548 days
#90

Grinding Wheel

Grinding Wheel

80 eac Delivery: 548 days
#91

Soldering Gun

Soldering Gun

8 eac Delivery: 548 days
#92

Desoldering Gun

Desoldering Gun

8 eac Delivery: 548 days
#93

Blower

Blower

3 eac Delivery: 548 days
#94

Cutting Plier

Cutting Plier

20 eac Delivery: 548 days
#95

MCCB 100 AMP

MCCB 100 AMP

10 eac Delivery: 548 days
#96

SUPPLY OF V Hz-3-1002-LA UV OV RELAY

SUPPLY OF V Hz-3-1002-LA UV OV RELAY

10 eac Delivery: 548 days
#97

Push Button RED ,GREEN

Push Button RED ,GREEN

90 eac Delivery: 548 days
#98

SUPPLY OF 2B6DT6 MULTIFUNCTION TIMER 240- 415VAC

SUPPLY OF 2B6DT6 MULTIFUNCTION TIMER 240- 415VAC

20 eac Delivery: 548 days
#99

SUPPLY OF BAKELITE SHEET 10MM

SUPPLY OF BAKELITE SHEET 10MM

30 sqm Delivery: 548 days
#100

Cable Glands and Blinds 0.75 IN 0.5 IN

Cable Glands and Blinds 0.75 IN 0.5 IN

90 eac Delivery: 548 days
#101

Cable Glands and Blinds 1 IN

Cable Glands and Blinds 1 IN

90 eac Delivery: 548 days
#102

Cable Glands and Blinds 1.5 IN

Cable Glands and Blinds 1.5 IN

30 eac Delivery: 548 days
#103

Cable Glands and Blinds 2 IN

Cable Glands and Blinds 2 IN

11 eac Delivery: 548 days
#104

Cable Glands and Blinds 2.5 IN

Cable Glands and Blinds 2.5 IN

12 eac Delivery: 548 days
#105

Cable Glands and Blinds 3 IN

Cable Glands and Blinds 3 IN

13 eac Delivery: 548 days
#106

SUPPLY OF INDUSTRIAL EXTENSION BOARD 16A, 1-PH, 3-PH

SUPPLY OF INDUSTRIAL EXTENSION BOARD 16A, 1-PH, 3-PH

10 eac Delivery: 548 days
#107

SUPPLY OF INDUSTRIAL EXTENSION BOARD 32A, 1-PH, 3-PH

SUPPLY OF INDUSTRIAL EXTENSION BOARD 32A, 1-PH, 3-PH

8 eac Delivery: 548 days
#108

SUPPLY OF URINAL SENSOR KIT

SUPPLY OF URINAL SENSOR KIT

10 eac Delivery: 548 days
#109

SUPPLY OF PIR MOTION SENSOR MODULE

SUPPLY OF PIR MOTION SENSOR MODULE

20 eac Delivery: 548 days
#110

SUPPLY OF 36W LED PANEL LIGHT 2x2

SUPPLY OF 36W LED PANEL LIGHT 2x2

70 eac Delivery: 548 days
#111

SUPPLY OF FAN REGULATOR

SUPPLY OF FAN REGULATOR

20 eac Delivery: 548 days
#112

SUPPLY OF 50W LED STREET LIGHT POLYCARBONATE BODY

SUPPLY OF 50W LED STREET LIGHT POLYCARBONATE BODY

40 eac Delivery: 548 days
#113

SUPPLY OF INDUSTRIAL EMERGENCY LED LIGHT 33 x 12.7 x 33 cm

SUPPLY OF INDUSTRIAL EMERGENCY LED LIGHT 33 x 12.7 x 33 cm

10 eac Delivery: 548 days
#114

LFAP Battery 12.8v, 75w

LFAP Battery 12.8v, 75w

6 eac Delivery: 548 days
#115

LFAP Battery 12v, 8 Ah

LFAP Battery 12v, 8 Ah

15 eac Delivery: 548 days
#116

SUPPLY OF 9V BATTERY

SUPPLY OF 9V BATTERY

200 eac Delivery: 548 days
#117

SUPPLY OF CABLE TIE 100MM

SUPPLY OF CABLE TIE 100MM

275 eac Delivery: 548 days
#118

SUPPLY OF CABLE TIE 150MM

SUPPLY OF CABLE TIE 150MM

155 eac Delivery: 548 days
#119

SUPPLY OF CABLE TIE 200MM

SUPPLY OF CABLE TIE 200MM

85 eac Delivery: 548 days
#120

SUPPLY OF CABLE TIE 300MM

SUPPLY OF CABLE TIE 300MM

250 eac Delivery: 548 days
#121

SUPPLY OF CABLE TIE 400MM

SUPPLY OF CABLE TIE 400MM

30 eac Delivery: 548 days
#122

SUPPLY OF CABLE TIE 500MM

SUPPLY OF CABLE TIE 500MM

30 eac Delivery: 548 days
#123

SUPPLY OF LED TUBE LIGHT 20W

SUPPLY OF LED TUBE LIGHT 20W

17 eac Delivery: 548 days
#124

SUPPLY OF 0.75 KW SINGLE PHASE SUBMERSIBLE PUMP CONTROLLER

SUPPLY OF 0.75 KW SINGLE PHASE SUBMERSIBLE PUMP CONTROLLER

16 eac Delivery: 548 days
#125

SUPPLY OF COTTON WASTE

SUPPLY OF COTTON WASTE

650 kg Delivery: 548 days
#126

SUPPLY OF COPPER SULPHATE HALF CELL Cu-CuSO5

SUPPLY OF COPPER SULPHATE HALF CELL Cu-CuSO5

5 eac Delivery: 548 days
#127

Digital AC Voltmeter 400V Range Single Phase

Digital AC Voltmeter 400V Range Single Phase

4 eac Delivery: 548 days
#128

SS Allen Bolt M6

SS Allen Bolt M6

100 eac Delivery: 548 days
#129

25 sqmm Armoured Cable 100 Meter

25 sqmm Armoured Cable 100 Meter

100 m Delivery: 548 days
#130

25 sqmm Earthing Cable 100 Meter

25 sqmm Earthing Cable 100 Meter

200 m Delivery: 548 days
#131

1.5 sqmm 4 Pair Cable 150 Meter

1.5 sqmm 4 Pair Cable 150 Meter

200 m Delivery: 548 days
#132

25 sqmm Earthing Cable 100 Meter

25 sqmm Earthing Cable 100 Meter

200 m Delivery: 548 days
#133

1.5 sqmm 4 Pair Cable 150 Meter

1.5 sqmm 4 Pair Cable 150 Meter

200 m Delivery: 548 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer