TenderDekho Logo
Closed GEM

BHEL Copper Phosphorus Brazing Alloy Tender Haridwar Uttarakhand 2026 AA77015 BACUP5

Bid Publish Date

18-Sep-2026, 4:17 pm

Bid End Date

28-Sep-2026, 5:00 pm

Progress

Issue18-Sep-2026, 4:17 pm
AwardPending

Tender Overview

Organization: Bharat Heavy Electricals Limited (BHEL) under the Department of Heavy Industry, located in Haridwar, Uttarakhand. Product: COPPER PHOSPHORUS BRAZING ALLOY (Sheet/foil format AA77015 REV 02; size 0.2X5X25; GRADE BACUP5). No BOQ quantity disclosed; no explicit estimated value or start/end dates published. Tender emphasizes pre-qualification adherence and NDA/technical scrutiny for non-BHEL approved bidders. A key differentiator is the option clause allowing up to 25% quantity variation at contracted rates during or after initial delivery terms, with delivery time recalculation rules. GST considerations are bidder-responsibility, with reimbursement as per actuals or applicable rates. The vendor documentation flow includes PAN, GSTIN, cancelled cheque, and EFT mandate. Invoices must be raised in the consignee name with the consignee GSTIN.

Technical Specifications & Requirements

  • Product/service: COPPER PHOSPHORUS BRAZING ALLOY (SHIM OR FOIL) – AA77015 REV 02
  • Size/Dim: 0.2 X 5 X 25 mm; DIM. THXW IN MM; GRADE BACUP5
  • Standards/requirements: Not specified for public access; emphasis on PQR-based qualification; NDA endorsements required for non-approved bidders
  • Bid process notes: Pre-qualification (PQR) mandatory; only qualified Tech bids proceed to Part II (price bid); NDA endorsement needed for non-approved bidders
  • Delivery/quantity flexibility: Option clause permits up to 25% increase/decrease in quantity; delivery schedule tied to original delivery period with extended-time calculations
  • GST/invoicing: GST payable; invoice in consignee name with GSTIN; GST portal confirmation screenshot required

Terms, Conditions & Eligibility

  • EMD/financials: Not disclosed publicly; bidders must submit before technical evaluation
  • Delivery terms: Delivery window calculated from last date of original delivery order; extended period applies per option clause
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; endorsement of pre-qualification requirements
  • Compliance: Technical bid separate from commercial terms; NDA endorsement if bidder is not BHEL-approved
  • Warranty/penalties: Not specified in data; standard contract risk remains via option clause and pre-qualification outcomes
  • Invoice/Payments: GST-inclusive invoicing with GST portal payment confirmation

Key Specifications

  • Product: COPPER PHOSPHORUS BRAZING ALLOY - SHIM OR FOIL

  • Code: AA77015 REV: 02

  • Size: 0.2 X 5 X 25 (DIM: THXW MM)

  • Grade: BACUP5

  • Delivery: Option to alter quantity by up to 25% at contracted rates

  • GST: Bidder bears GST; invoice in consignee GSTIN; GST portal proof required

Terms & Conditions

  • Option Clause allows ±25% quantity change during/after contract period

  • Pre-qualification (PQR) required; non-qualifiers barred from technical evaluation

  • Invoices must be raised in consignee name with consignee GSTIN; GST compliance mandatory

Important Clauses

Payment Terms

GST payable; invoice to consignee with GSTIN; GST portal screenshot required

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time formula applies for option quantity changes

Penalties/Liquidated Damages

Not explicitly stated; governed by option clause and pre-qualification outcomes

Bidder Eligibility

  • Must meet pre-qualification requirements (PQR) as specified

  • Must be eligible for technical evaluation if PQR is satisfied

  • NDA endorsement required for non-BHEL approved bidders

Advertisement

Authority & Contact

Tender Data

Bid Details

Quantity

20

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

COPPER PHOSPHORUS BRAZING ALLOY

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Haridwar

Delivery Pincodes

249403

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Paras249403,Shipping Section, Central Plant Stores, HEEP, BHEL, Haridwar-249403 UttarakhandHaridwarUttarakhand2494032090-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-9913774.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 10

Required Documents

1

PAN Card copy

2

GSTIN copy

3

Cancelled cheque copy

4

EFT Mandate duly certified by bank

5

Endorsed copy of Pre-Qualification Requirements (PQR)

6

Technical bid documents (excluding commercial terms)

7

NDA endorsement (for non-BHEL approved bidders)

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for copper brazing alloy tender in Haridwar 2026

Bidders must satisfy the pre-qualification requirements, submit PAN, GSTIN, cancelled cheque, and EFT mandate, and endorse PQR. Technical bid is evaluated before price bid; NDA endorsement is needed for non-BHEL approved bidders. Delivery terms include an option clause for 25% quantity variation at contracted rates.

What documents are required for BHEL copper alloy tender in Uttarakhand

Submit PAN, GSTIN, cancelled cheque, EFT mandate, endorsed PQR, technical bid documents, and NDA if not BHEL-approved. Ensure GST invoice aligns with consignee name and GSTIN, with GST portal payment confirmation as part of invoice submission.

What are the technical specs for AA77015 BACUP5 copper alloy

Product is COPPER PHOSPHORUS BRAZING ALLOY SHIM/FOIL with code AA77015 REV 02, size 0.2 X 5 X 25 mm, Grade BACUP5. No explicit performance standards published; expect PQR-driven qualification and compliance with internal BHEL requirements.

When does delivery occur for option-based quantity changes

Delivery period begins from the last date of the original delivery order; if the option clause is exercised, additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What are the GST obligations for this BHEL tender in Haridwar

Bidders bear GST; reimbursement is as per actuals or applicable rates (whichever is lower). Ensure GST portal upload of GST invoice and payment confirmation, per terms.

What is required to qualify for technical evaluation in this tender

Submit endorsed PQR, pass pre-qualification screening, and provide technical bid excluding commercial terms. Non-BHEL approved bidders may need NDA endorsement to advance to price bid stage.

What are the invoicing requirements for consignee in Uttarakhand

Invoices must be raised in the consignee’s name with the consignee GSTIN; provide scanned GST invoice and GST portal payment confirmation with the bid submission.

What is the scope of quantity variation allowed by the option clause

The purchaser may vary quantity by up to 25% of bid/contract quantity, with corresponding extension of delivery time; extension formula ensures minimum 30 days unless original delivery exceeds that.