Tender Overview

National Aluminium Company Limited invites bids for the Upgradation of Anode Baking Furnace-III Ramp PLC at their Angul, Odisha facility. The procurement scope centers on PLC-based ramp upgrade within the Materials division, with no BOQ items listed. The tender references multiple EMD/PBG submission options (DD, FDR, online RTGS) and requires adherence to an Integrity Pact. Payment terms specify staged release tied to receipt, installation, and commissioning milestones. This is a focused, capital maintenance and upgrade project for a key smelting asset, with GST handling aligned to actuals and bidder-provided rates.

  • Organization: National Aluminium Company Limited (NALCO)
  • Location: Angul, Odisha 759037
  • Product/Service: Upgradation of Anode Baking Furnace-III Ramp PLC
  • Estimated value: Not disclosed
  • Delivery context: Post-award installation, commissioning and testing
  • Unique aspects: Integrity Pact compliance; multiple forms of performance security; online payment option; no BOQ items listed

Technical Specifications & Requirements

  • No technical specification data provided in the tender excerpt; however, key terms exist around financial and compliance requirements.
  • Payment terms: 70% of material cost with 100% GST released within 10 days of receipt at NALCO stores, subject to CPBG; remaining 30% of material cost plus 100% of service cost after successful installation, commissioning and testing.
  • Performance security options: Performance security via PBG, plus alternative forms: DD (in favour of NATIONAL Aluminium Co. Ltd, Angul), FDR (in favour of NALCO A/C), or online RTGS/IBN with proof uploads within 15 days of award.
  • GST handling: GST as actuals or as per applicable rates (whichever is lower), capped to quoted GST if applicable.
  • Integrity Pact: Upload scanned signed Integrity Pact per buyer policy prior to bid submission.
  • ATC/ATC-like clauses: NIT ref applies; ensure acceptance of terms and submission of required certificates.

Terms, Conditions & Eligibility

  • GST responsibility lies with bidders; reimbursement as actuals or lower rate.
  • Integrity Pact must be signed and uploaded with the bid.
  • EMD/Performance Security options: DD, FDR, or online RTGS; payment must include contract number and seller name in transfer details; hard copy delivery within 15 days of award.
  • Certificates: Offer may be rejected if required certificates/documents are missing.
  • Payment schedule: 70% material cost + 100% GST on receipt; 30% material cost + 100% service cost after installation/testing.
  • Submission prerequisites: GST, PAN, experience certificates, financial statements, EMD documentation, technical compliance certificates, OEM authorizations where applicable.

Key Specifications

  • Product/service names: Upgradation of Anode Baking Furnace-III Ramp PLC

  • Delivery/installation: Post-award installation, commissioning and testing of complete system

  • EMD/Performance security: DD, FDR, or online RTGS; hard copy within 15 days

  • GST handling: Reimbursement as actuals or applicable rates (whichever lower)

  • Integrity Pact: Signed copy required with bid submission

  • Bank/payment details: RTGS/Internet banking with contract number and seller name in details

Terms & Conditions

  • 70% material cost with 100% GST released within 10 days of receipt

  • Balance 30% material cost and 100% service cost released after installation and testing

  • Multiple EMD/Performance Security options (DD, FDR, online RTGS)

Important Clauses

Payment Terms

70% of material cost with 100% GST within 10 days of receipt; 30% material cost plus 100% service cost after successful installation and testing

Delivery Schedule

Installation, commissioning and testing of the Ramp PLC upgrade after award; no exact calendar dates provided in the excerpt

Penalties/Liquidated Damages

Not specified in the available data

Bidder Eligibility

  • Compliance with Integrity Pact and related ATC

  • Ability to submit EMD via DD/FDR/online RTGS

  • GST registration and appropriate tax handling

  • Experience in PLC-based upgrades or furnace control systems (implied by scope)

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Single Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

Yes (Mediation clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

UPGRADATION OF ANODE BAKING FURNACE-III RAMP PLC

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

14

Payment Timelines

Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Anugul

Delivery Pincodes

759145

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
SUBHENDU MISHRA759145,PURCHASE DEPARTMENT, NALCO SMELTER PLANT, NALCO NAGARAnugulOdisha7591451120-

Authority Records

MINISTRY OF MINES

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9899190.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Department

Materials

Office Name

Materials

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

14-Oct-2026

Extended Deadline

19-Oct-2026, 4:30 am

Opening Date

20-Oct-2026, 4:30 am

Advertisement

Categories 7

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for furnace PLC upgrades

4

Financial statements (latest audited/unaudited as required)

5

EMD submission proof (DD/FDR/RTGS receipt)

6

Technical bid documents and certificates of compliance

7

OEM authorization letters (if applicable)

8

Signed Integrity Pact and CPBG documentation

Frequently Asked Questions

Key insights about ODISHA tender market

How to bid for Nalco Anode Baking Furnace upgrade in Angul Odisha 2026

Bidders must sign and upload the Integrity Pact, submit GST and PAN, provide EMD via DD, FDR, or online RTGS, and attach technical/commercial certificates. The tender requires 70% material cost payment with GST within 10 days of receipt and 30% after installation and testing.

What documents are required for Nalco PLC upgrade tender in Angul

Required documents include GST registration, PAN, experience certificates for furnace PLC upgrades, financial statements, EMD proof (DD/FDR/RTGS receipt), technical compliance certificates, and OEM authorizations if applicable. Also include signed Integrity Pact and proof of CPBG as specified.

What are the payment terms for Nalco furnace upgrade tender Angul

Payment terms specify 70% of material cost with 100% GST released within 10 days of receipt at Nalco stores, after CPBG submission; the remaining 30% material cost plus 100% service cost paid after successful installation, commissioning and testing.

What is the EMD submission method for Nalco Angul tender

EMD may be submitted via Demand Draft in favour of NATIONAL ALUMINIUM CO.LTD, Angul; or via fixed deposit receipt or online RTGS/IBN transfer with contract number and seller name in the transfer details; ensure 15-day hard copy delivery post-award.

What standards or certifications are required for Nalco PLC upgrade tender

The tender requires compliance with Organization-specific Integrity Pact; GST compliance; CPBG submission; and certificates listed in the bid document, including any OEM authorizations. Specific IS/ISO standards are not detailed in the excerpt.

When will installation and commissioning be completed for Nalco upgrade

The tender specifies installation, commissioning and testing after award, with final payment linked to successful completion. Exact calendar milestones are not provided in the available data; bidders should seek clarification on schedule during bid stage.

What is the GST handling approach for Nalco Angul tender

GST will be reimbursed based on actuals or applicable rates that are lower, with the quoted GST percentage used if applicable; bidders must quote GST carefully to avoid higher reimbursements and ensure compliance with Nalco policy.