Indian Air Force Stabilizer Cover Procurement Tender Bangalore Karnataka 2025
Indian Air Force
BANGALORE, KARNATAKA
Bid Publish Date
03-Jul-2026, 10:37 am
Bid End Date
14-Jul-2026, 9:00 am
Location
Progress
Quantity
50
Bid Type
Two Packet Bid
The Indian Air Force invites bids for a stabilizer cover, to be delivered to Air Force Station Yelahanka. The procurement is governed by Buyer Added Terms and Conditions, including a 50% optional quantity increase and a delivery timeline linked to the original delivery period. A 6-month warranty is mandated for the successful bidder. The BOQ shows no listed items, so bidders should rely on the stated ATC clauses and the subject item’s technical references in the uploaded documents. This tender emphasizes strictly meeting delivery commitments at the contracted rates and adhering to the option clause during the currency of the contract, ensuring bidders plan for potential volume fluctuations. The opportunity focuses on supplying a single item category (stabilizer cover) with emphasis on timely delivery and warranty coverage as key differentiators.
Product category: Stabilizer Cover
Delivery location: Air Force Station Yelahanka
Warranty: 6 months
Quantity flexibility: up to 50% increase at contracted rates
Delivery period calculation: (additional quantity ÷ original quantity) × Original delivery period, minimum 30 days
BOQ: No items listed; rely on uploaded technical specification
Option clause allows 50% quantity variation at contracted rates
Delivery to Air Force Station Yelahanka with specified minimum 30-day period
6-month warranty required for the stabilizer cover
Not specified in data; review ATC for payment terms and any advance or milestone payments
Delivery must be to Air Force Station Yelahanka; delivery period computed per formula with minimum 30 days
Not specified in data; ATC may include LDs; bidders should verify during bid preparation
Acceptance of all Buyer Added Terms and Conditions including the quantity option clause
Ability to deliver stabilizer covers to Air Force Station Yelahanka within the specified delivery framework
Warranty commitment of 6 months on delivered stabilizer covers
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
STABLIZER COVER
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Air Force
BANGALORE, KARNATAKA
Bharat Heavy Electricals Limited
JHANSI, UTTAR PRADESH
Indian Army
Indian Air Force
Indian Air Force
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Undertaking Certificate confirming acceptance of Buyer Added Terms and Conditions and Scope of Work with official company stamp
Any uploaded technical specification document referenced in ATC clauses
GST registration certificate (if applicable per tender norms)
Pan card copy
Technical compliance certificates or OEM authorizations (if specified in ATC)
Any existing warranty terms and service/support documentation
To bid, confirm acceptance of Buyer Added Terms and Conditions, prepare an Undertaking Certificate with your company stamp, and submit with any uploaded technical specifications. Ensure your price reflects potential 50% quantity variation and complies with the 6-month warranty requirement for stabilizer covers.
Submit Undertaking Certificate with company stamp, GST and PAN details, proof of technical compliance (if provided), OEM authorizations, and standard bid documents. Include any uploaded ATC references and warranty terms to demonstrate conformity for the stabilizer cover purchase.
Delivery must be to Air Force Station Yelahanka as per ATC. The initial delivery period follows the contract terms, and any extension should respect the formula: additional quantity/original quantity × original delivery period, with a minimum of 30 days.
The contract requires a 6-month warranty on the stabilizer cover. Bidders should outline warranty coverage, including replacement or repair for manufacturing defects and support timelines within the warranty period.
The purchaser may increase or decrease the quantity by up to 50% at contract rates during bid and currency of contract. The delivery period adjusts based on the above formula, maintaining minimum 30 days for extended deliveries.
Specific technical standards are provided in uploaded ATC documents. Bidders must refer to the technical specification under Buyer Added terms and ensure ISI/ISO or equivalent conformance if listed, plus maintain the 6-month warranty and delivery requirements.
Prepare an Undertaking Certificate on official company letterhead, include your acceptance of ATC terms and scope of work, sign and stamp, and attach with the bid submission as proof of compliance with the Buyer Added Terms.
Since BOQ items are not listed, bidders must rely on uploaded technical specifications and ATC. Prices should reflect the stabilizer cover unit as described, with quantities treated per option clause and delivery terms.
Tata Memorial Centre
📍 MUMBAI, MAHARASHTRA
Indian Air Force
📍 VADODARA, GUJARAT
Indian Air Force
📍 CHANDIGARH, CHANDIGARH
Indian Army
📍 JODHPUR, RAJASTHAN
Munitions India Limited
📍 CHANDRAPUR, MAHARASHTRA
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS