TenderDekho Logo
Closed GEM

Contract Bidding Open For Part A - Supply and fixing of False Ceiling,Part A - Supply and fixing of Wall panelling,Part A - S in BANGALORE, KARNATAKA

Bid Publish Date

30-Jul-2026, 6:54 pm

Bid End Date

20-Aug-2026, 7:00 pm

EMD

₹18,70,000

Progress

Issue30-Jul-2026, 6:54 pm
AwardPending

Broadcast Engineering Consultants India Limited announces a tender for Part A - Supply and fixing of False Ceiling, Part A - Supply and fixing of Wall panelling, Part A - S in BANGALORE, KARNATAKA. Quantity: 3848. Submission Deadline: 20-08-2026 19: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

3848

Category

Part A - Supply of Software with minimum 3 Year subscription for MS Office, Digital teaching, A.i etc

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

45

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Bengaluru Urban

Delivery Pincodes

560094

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Usha Mangalgi560094,152, 2nd Main Rd, AG's Office Layout, RMV II Stage, Bengaluru, Karnataka 560094Bengaluru UrbanKarnataka560094648180-

Authority Records

MINISTRY OF INFORMATION AND BROADCASTING

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9684668.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 86 Items Sign in for GEM prices

#1

Part A - Supply and fixing of False Ceiling

Part A - Supply and fixing of False Ceiling

648 sqm Delivery: 180 days
#2

Part A - Supply and fixing of Wall panelling

Part A - Supply and fixing of Wall panelling

756 sqm Delivery: 180 days
#3

Part A - Supply and fixing of Roller Blinds

Part A - Supply and fixing of Roller Blinds

78 sqm Delivery: 180 days
#4

Part A - Supply and fixing of Floor vinyl

Part A - Supply and fixing of Floor vinyl

648 sqm Delivery: 180 days
#5

Part A - Supply and fixing of Office table

Part A - Supply and fixing of Office table

6 nos Delivery: 180 days
#6

Part A - Supply and fixing of Office chair

Part A - Supply and fixing of Office chair

6 nos Delivery: 180 days
#7

Part A - Supply and fixing of Desk Bench and Seater

Part A - Supply and fixing of Desk Bench and Seater

90 nos Delivery: 180 days
#8

Part A - Supply of Intelligent Display Screen

Part A - Supply of Intelligent Display Screen

6 nos Delivery: 180 days
#9

Part A - Supply of OPS for display

Part A - Supply of OPS for display

6 nos Delivery: 180 days
#10

Part A - Supply of Display wall Mounting

Part A - Supply of Display wall Mounting

6 nos Delivery: 180 days
#11

Part A - Supply of Software with minimum 3 Year subscription for MS Office, Digital teaching, A.i etc

Part A - Supply of Software with minimum 3 Year subscription for MS Office, Digital teaching, A.i etc

6 nos Delivery: 180 days
#12

Part A - Supply of Digital podium with PC

Part A - Supply of Digital podium with PC

6 nos Delivery: 180 days
#13

Part A - Supply of Speaker

Part A - Supply of Speaker

24 nos Delivery: 180 days
#14

Part A - Supply of Amplifier

Part A - Supply of Amplifier

6 nos Delivery: 180 days
#15

Part A - Supply of Microphones, Wireless handheld

Part A - Supply of Microphones, Wireless handheld

12 nos Delivery: 180 days
#16

Part A - Supply of Microphones, Wireless Lapel

Part A - Supply of Microphones, Wireless Lapel

12 nos Delivery: 180 days
#17

Part A - Supply of DSP

Part A - Supply of DSP

6 nos Delivery: 180 days
#18

Part A - Supply of PTZ Camera

Part A - Supply of PTZ Camera

6 nos Delivery: 180 days
#19

Part A - Supply of Recorder and Streamer

Part A - Supply of Recorder and Streamer

6 nos Delivery: 180 days
#20

Part A - Supply of UPS

Part A - Supply of UPS

6 nos Delivery: 180 days
#21

Part A - Supply of Battery

Part A - Supply of Battery

12 nos Delivery: 180 days
#22

Part A - Supply of CCTV Camera

Part A - Supply of CCTV Camera

12 nos Delivery: 180 days
#23

Part A - Supply of POE Switch

Part A - Supply of POE Switch

6 nos Delivery: 180 days
#24

Part A - Supply of Network Video Recorder

Part A - Supply of Network Video Recorder

6 nos Delivery: 180 days
#25

Part A - Supply of CCTV Display- 32 inches

Part A - Supply of CCTV Display- 32 inches

6 nos Delivery: 180 days
#26

Part A - Supply of Signage board with software - 55 inches

Part A - Supply of Signage board with software - 55 inches

6 nos Delivery: 180 days
#27

Part A - Supply of Equipment rack

Part A - Supply of Equipment rack

6 nos Delivery: 180 days
#28

Part A - Supply of TR Invertor type split Air conditioners 1.5 Ton capacity

Part A - Supply of TR Invertor type split Air conditioners 1.5 Ton capacity

12 nos Delivery: 180 days
#29

Part A - Supply and fixing of Stand fabricated

Part A - Supply and fixing of Stand fabricated

12 nos Delivery: 180 days
#30

Part A - Supply and fixing of copper tubing

Part A - Supply and fixing of copper tubing

70 mts Delivery: 180 days
#31

Part A - Installation for Split type air conditioner

Part A - Installation for Split type air conditioner

12 nos Delivery: 180 days
#32

Part A - Supply and fixing of recess mounting LED light 2X2

Part A - Supply and fixing of recess mounting LED light 2X2

36 nos Delivery: 180 days
#33

Part A - Supply of Installation cable, connectors and accessories

Part A - Supply of Installation cable, connectors and accessories

6 lot Delivery: 180 days
#34

Part A - Site Preparation installation and commissioning

Part A - Site Preparation installation and commissioning

6 lot Delivery: 180 days
#35

Part B - Supply and fixing of False ceiling

Part B - Supply and fixing of False ceiling

44 sqm Delivery: 180 days
#36

Part B - Supply and fixing of Wall panelling

Part B - Supply and fixing of Wall panelling

80 sqm Delivery: 180 days
#37

Part B - Supply and fixing of Roller Blinds

Part B - Supply and fixing of Roller Blinds

13 sqm Delivery: 180 days
#38

Part B - Supply and fixing of Flooring

Part B - Supply and fixing of Flooring

44 sqm Delivery: 180 days
#39

Part B - Supply and fixing of Conference table

Part B - Supply and fixing of Conference table

1 nos Delivery: 180 days
#40

Part B - Supply and fixing of High Back Cushion Chair

Part B - Supply and fixing of High Back Cushion Chair

24 nos Delivery: 180 days
#41

Part B - Supply of Chairs for vistors

Part B - Supply of Chairs for vistors

20 nos Delivery: 180 days
#42

Part B - Supply of 110 inches Display Screen

Part B - Supply of 110 inches Display Screen

1 nos Delivery: 180 days
#43

Part B - Supply of PC for display

Part B - Supply of PC for display

1 nos Delivery: 180 days
#44

Part B - Supply of Display Mounting

Part B - Supply of Display Mounting

1 nos Delivery: 180 days
#45

Part B - Supply of Software with minimum 3 Year subscription for MS Office, Digital teaching, A.i etc

Part B - Supply of Software with minimum 3 Year subscription for MS Office, Digital teaching, A.i etc

1 nos Delivery: 180 days
#46

Part B - Supply of Speaker

Part B - Supply of Speaker

4 nos Delivery: 180 days
#47

Part B - Supply of Amplifier

Part B - Supply of Amplifier

1 nos Delivery: 180 days
#48

Part B - Supply of Microphones, Wireless handheld

Part B - Supply of Microphones, Wireless handheld

2 nos Delivery: 180 days
#49

Part B - Supply of DSP

Part B - Supply of DSP

1 nos Delivery: 180 days
#50

Part B - Supply of VC Camera

Part B - Supply of VC Camera

1 nos Delivery: 180 days
#51

Part B - Supply of Conference Unit

Part B - Supply of Conference Unit

1 nos Delivery: 180 days
#52

Part B - Supply of UPS

Part B - Supply of UPS

1 nos Delivery: 180 days
#53

Part B - Supply of Battery

Part B - Supply of Battery

2 nos Delivery: 180 days
#54

Part B - Supply of CCTV Camera

Part B - Supply of CCTV Camera

2 nos Delivery: 180 days
#55

Part B - Supply of POE Switch

Part B - Supply of POE Switch

1 nos Delivery: 180 days
#56

Part B - Supply of Network Video Recorder

Part B - Supply of Network Video Recorder

1 nos Delivery: 180 days
#57

Part B - Supply of CCTV Display- 32 inches

Part B - Supply of CCTV Display- 32 inches

1 nos Delivery: 180 days
#58

Part B - Supply and fixing of recess mounting LED light 2X2

Part B - Supply and fixing of recess mounting LED light 2X2

1 nos Delivery: 180 days
#59

Part B - Supply of Equipment rack

Part B - Supply of Equipment rack

1 nos Delivery: 180 days
#60

Part B - Supply of Installation cable, connectors and accessories

Part B - Supply of Installation cable, connectors and accessories

1 lot Delivery: 180 days
#61

Part B - Site Preparation installation and commissioning

Part B - Site Preparation, installation and commissioning

1 lot Delivery: 180 days
#62

Part C - Supply and fixing of False Ceiling

Part C - Supply and fixing of False Ceiling

242 sqm Delivery: 180 days
#63

Part C - Supply and fixing of Wall panelling

Part C - Supply and fixing of Wall panelling

198 sqm Delivery: 180 days
#64

Part C - Supply and fixing of Roller Blinds

Part C - Supply and fixing of Roller Blinds

21 sqm Delivery: 180 days
#65

Part C - Supply and fixing of vinyl Seating Area

Part C - Supply and fixing of vinyl Seating Area

192 sqm Delivery: 180 days
#66

Part C - Supply and fixing of Wooden Flooring Stage Area

Part C - Supply and fixing of Wooden Flooring Stage Area

66 sqm Delivery: 180 days
#67

Part C - Supply and construction of stepped seating platform Deck

Part C - Supply and construction of stepped seating platform Deck

112 sqm Delivery: 180 days
#68

Part C - Supply and fixing of Auditorium push back chairs

Part C - Supply and fixing of Auditorium push back chairs

132 nos Delivery: 180 days
#69

Part C - Supply of 110 inches display, bracket and PC

Part C - Supply of 110 inches display, bracket and PC

1 nos Delivery: 180 days
#70

Part C - Supply of PC for display

Part C - Supply of PC for display

1 nos Delivery: 180 days
#71

Part C - Supply of Display Mounting

Part C - Supply of Display Mounting

1 nos Delivery: 180 days
#72

Part C - Supply of Digital podium

Part C - Supply of Digital podium

1 nos Delivery: 180 days
#73

Part C - Supply of Speaker

Part C - Supply of Speaker

4 nos Delivery: 180 days
#74

Part C - Supply of Amplifier

Part C - Supply of Amplifier

1 nos Delivery: 180 days
#75

Part C - Supply of Microphones, Wireless handheld

Part C - Supply of Microphones, Wireless handheld

2 nos Delivery: 180 days
#76

Part C - Supply of DSP

Part C - Supply of DSP

1 nos Delivery: 180 days
#77

Part C - Supply of UPS

Part C - Supply of UPS

1 nos Delivery: 180 days
#78

Part C - Supply of Battery

Part C - Supply of Battery

2 nos Delivery: 180 days
#79

Part C - Supply of Signage board with software 55 inches

Part C - Supply of Signage board with software 55 inches

1 nos Delivery: 180 days
#80

Part C - Supply and fixing of electrical wires

Part C - Supply and fixing of electrical wires

1 lot Delivery: 180 days
#81

Part C - Supply and fixing of electrical switches sockets

Part C - Supply and fixing of electrical switches sockets

1 lot Delivery: 180 days
#82

Part C - Supply and fixing of LED lights 34 36W

Part C - Supply and fixing of LED lights 34 36W

32 nos Delivery: 180 days
#83

Part C - Supply and fixing of LED lights 15 18W

Part C - Supply and fixing of LED lights 15 18W

32 nos Delivery: 180 days
#84

Part C - Supply of Equipment rack

Part C - Supply of Equipment rack

1 nos Delivery: 180 days
#85

Part C - Supply of Installation cable, connectors and accessories

Part C - Supply of Installation cable, connectors and accessories

1 lot Delivery: 180 days
#86

Part C - Site Preparation installation and commissioning

Part C - Site Preparation installation and commissioning

1 lot Delivery: 180 days

Categories 65

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer