Progress
The Indian Navy seeks a complete power backup solution comprising a 2800VA, 2520W UPS system, a 200Ah battery, a mobile trolley, and wiring using 2.5 SQ MM copper wire with FRLS PVC casing for safe installation. The scope includes wiring, installation charges, and associated accessories for deployment at a Goan air station, with delivery terms aligned to government procurement norms. The supplier must demonstrate onsite service capability, compliance with statutory provisions, and proximity to the consignee’s site in Goa. The tender notes a flexible quantity clause up to 25% and requires readiness for contract extension under identical rates. Emphasized differentiators include rapid service response, local service presence, and adherence to safety standards.
System capacity: 2800VA / 2520W UPS
Battery rating: 200Ah
Cable: 2.5 sq mm copper wire
Cable insulation: FRLS PVC casing and capping
Mobility: included trolley
Installation charges: included in scope
Service presence: local Goan office with documentary evidence
25% quantity/term option: contractor must accept increased/decreased scope within limit
Delivery timeline: minimum 30 days for added quantity; based on original/extended period
Site readiness: mandatory site visit confirmation and Goan service office evidence
contractor salaries paid upfront; reimbursement with statutory documents; payment terms to be aligned with government norms
delivery commences from last date of original delivery order; additional time calculated as (increased/ original) × original period with minimum 30 days
not explicitly specified in data; implied LD as per standard government contracts; ensure compliance
Presence of local service office in Goa with verifiable evidence
Experience in supplying/servicing military or government-grade UPS/back-up systems
Capability to supply 200Ah battery systems with FRLS PVC wiring and 2.5 sq mm copper wiring
Quantity
809
Category
POWER BACKUP SYSTEM OF 2800VA AND 2520W
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
Past Performance
30 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
POWER BACKUP SYSTEM OF 2800VA AND 2520W , BATTERY 200Ah , TROLLEY , WIRE 2 POINT 5 SQ MM COPPER WIRE FRLS , PVC CASING AND CAPPING , WIRING AND INSTALLATION CHARGES
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
South Goa
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | South Goa | South Goa | - | - | 2 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
POWER BACKUP SYSTEM OF 2800VA AND 2520W
POWER BACKUP SYSTEM OF 2800VA AND 2520W
BATTERY 200Ah
BATTERY 200Ah
TROLLEY
TROLLEY
WIRE 2 POINT 5 SQ MM COPPER WIRE FRLS
WIRE 2 POINT 5 SQ MM COPPER WIRE FRLS
PVC CASING AND CAPPING
PVC CASING AND CAPPING
WIRING AND INSTALLATION CHARGES
WIRING AND INSTALLATION CHARGES
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | POWER BACKUP SYSTEM OF 2800VA AND 2520W | POWER BACKUP SYSTEM OF 2800VA AND 2520W | 2 | nos | logocobra | 30 | |
| 2 | BATTERY 200Ah | BATTERY 200Ah | 4 | nos | logocobra | 30 | |
| 3 | TROLLEY | TROLLEY | 2 | nos | logocobra | 30 | |
| 4 | WIRE 2 POINT 5 SQ MM COPPER WIRE FRLS | WIRE 2 POINT 5 SQ MM COPPER WIRE FRLS | 400 | nos | logocobra | 30 | |
| 5 | PVC CASING AND CAPPING | PVC CASING AND CAPPING | 400 | m | logocobra | 30 | |
| 6 | WIRING AND INSTALLATION CHARGES | WIRING AND INSTALLATION CHARGES | 1 | job | logocobra | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about GOA tender market
Bidders must meet eligibility criteria including local Goa service office evidence, experience in military UPS provisioning, and FRLS PVC cabling capabilities. Submit GST, PAN, prior project certificates, EMD details, technical compliance, OEM authorizations, and site visit confirmation. Include 2800VA/2520W UPS and 200Ah battery specifications with 2.5 sq mm copper wiring.
Prepare GST certificate, PAN, company financials, experience certificates for analogous projects, EMD payment proof, technical bid, OEM authorization letter, and site visit confirmation. Ensure bids reflect 2800VA/2520W UPS and 200Ah battery, plus FRLS PVC wiring and trolley inclusion.
Bid to specify compliance with 2800VA/2520W UPS performance, 200Ah battery rating, FRLS PVC cabling standard, 2.5 sq mm copper conductor, and safety norms. Provide evidence of service capability near Goa air station and compliant installation procedures per government norms.
Delivery starts after the original delivery order date; if quantities increase up to 25%, additional time is calculated as (increased quantity ÷ original quantity) × original period, with a minimum of 30 days. Ensure readiness for extended delivery within contract terms.
EMD details are not explicitly stated in the data provided; bidders should refer to official tender terms for the exact amount, payment mode, and validity. Prepare the EMD as per instructions and ensure bank/online transfer readiness.
The scope explicitly includes wiring, installation charges, trolley, and FRLS PVC cabling. Provide a complete installation plan with site readiness confirmation, including 2.5 sq mm copper wiring runs and FRLS PVC casing, to ensure seamless deployment at the air station in Goa.