TenderDekho Logo
Closed GEM

BHEL Bharat Heavy Electricals Limited Framework Agreement for 700000 KGS Prefab IBR CS/AS Piping - Rajasthan 2026

Bid Publish Date

24-Jun-2026, 9:52 am

Bid End Date

16-Jul-2026, 4:00 pm

Generate Docs

Progress

RA
Issue24-Jun-2026, 9:52 am
Corrigendum07-Jul-2026
Reverse Auction18-Aug-2026, 11:00 am
AwardPending

Tender Overview

The procurement is a framework agreement by Bharat Heavy Electricals Limited (BHEL) for the supply of 700,000 KGS of Prefab IBR CS (99.75%) & AS (0.25%) grade piping. Scope is strictly supply of Goods, with an undiscussed estimated value and no BOQ items listed. Location details are not provided in the data. The initiative emphasizes a fixed-rate contract with potential quantity variation up to 25%, and a delivery mechanism tied to the original delivery period plus adjustments. A key differentiator is the explicit option clause enabling scale-up during the contract and a structured pre-dispatch inspection regime. The tender’s unique context centers on a single, large-volume piping supply obligation under a framework model, with standard inspection and warranty references implied.

Technical Specifications & Requirements

  • Product/service: Prefab IBR CS piping (99.75% CS, 0.25% AS) supplied under a framework.
  • Quantity target: 700,000 KGS total, supply-only scope.
  • Inspection: Pre-dispatch inspection at seller premises or nominated agency; inspection fees borne by Buyer; 7 days window for inspection from email notice; external labs may be involved; in-house testing provided at no cost.
  • Warranty: Warranty period mentioned but not fully specified in data; terms to be defined in contract.
  • Delivery: Delivery period mechanics defined by option clause: delivery time increases with quantity; minimum 30 days; extended duration possible up to original delivery period.
  • Standards/Compliance: Not specified in data beyond material grades; bidders should anticipate IS/GB-grade piping norms as applicable though not enumerated here.
  • Inspection readiness: Seller must notify Buyer of readiness; clearance precedes dispatch; rejection rights reserved by consignee.

Terms, Conditions & Eligibility

  • Scope of supply: Only supply of Goods (no services).
  • EMD/Security: Not specified in data; ensure default tender submission readiness.
  • Delivery terms: Delivery period governed by option clause; extended time formula provided; minimum 30 days.
  • Payment terms: Not detailed in data; contract will specify payment terms with delivery acceptance.
  • Documentation: Pre-dispatch inspection records, test reports, and compliance documentation to be arranged per GTC.
  • Warranty/LD: Warranty terms not fully defined; LD provisions not listed; contract will define after award.
  • Bidder qualifications: No explicit eligibility years or turnover data in the data; contract implies capability to supply large kilograms of piping and pass inspection.

Key Specifications

  • Product/service names: Prefab IBR CS piping; CS 99.75% and AS 0.25% grade

  • Quantities: 700,000 KGS (estimated quantity in framework)

  • Standards/Certification: Not explicitly specified in tender data; assume material grade compliance

  • Delivery: 30+ day minimum delivery period; option to increase quantity up to 25% with contracted rates

  • Inspection: Pre-dispatch inspection at seller premises; Buyer bears external inspection/lab charges; 7-day readiness notice

  • Warranty: Not fully specified in data; warranty term to be defined per contract

  • Scope: Supply-only; no installation or services mentioned

Terms & Conditions

  • EMD amount and exact payment terms are not detailed in the data, but bidders should prepare standard bid security per organization guidelines.

  • Delivery terms rely on an option clause permitting quantity variation up to 25%, with calculation to determine extended delivery time.

  • Pre-dispatch inspection is mandatory, with buyer/agency fees and 7-day readiness window; rejection rights reserved by consignee.

Important Clauses

Payment Terms

Not explicitly stated; final contract will define payment milestones and any advance/retention terms.

Delivery Schedule

Option clause allows ±25% quantity variation; additional time = (increased quantity / original quantity) × original delivery period, min 30 days.

Penalties/Liquidated Damages

Not specified in data; contract to define LD if delivery or quality defaults occur.

Bidder Eligibility

  • Ability to supply 700,000 KGS of Prefab IBR CS/AS piping

  • Compliance with pre-dispatch inspection process and related Quality Assurance

  • Financially capable with standard bid security and turnover documentation

Authority & Contact

Reverse Auction Schedule

Completed

Start

18-Aug-2026, 11:00 am

End

20-Aug-2026, 11:00 am

Duration: 48 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

700000

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

Yes

Requirements

Min. Avg. Annual Turnover

263

OEM Avg. Turnover

263

Past Performance

30 %

Warranty Period

2 years

Experience Required

3 Year (s)

Arbitration Clause

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

FRAMEWORK AGREEMENT FOR 700000 KGS OF PREFAB IBR CS(99.75% ) & AS(0.25% ) GRADE PIPING

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Bilaspur

Delivery Pincodes

495555

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Mamta Kumari495555,BHEL Site office, 1x800 MW NTPC SIPAT Stage III project, P.O. UJJWAL NAGARBilaspurChhattisgarh495555700000180-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9497706.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 3

Corrigendum Updates

2 Updates
#1

Update

07-Jul-2026
#2

Update

07-Jul-2026

Extended Deadline

16-Jul-2026, 10:30 am

Opening Date

16-Jul-2026, 11:00 am

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates showing relevant supply of piping (where applicable)

4

Financial statements (turnover evidence)

5

EMD/Security deposit documentation (as per contract terms)

6

Technical bid documents demonstrating ability to supply Prefab IBR CS piping

7

OEM authorizations or certifications (if required by tender process)

8

Any compliance or testing certificates linked to pre-dispatch inspection

9

Quality/ISO or ISI certifications if referenced by contract terms

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for BHEL piping framework tender 2026?

Bidders must submit GST, PAN, financial statements, and experience certificates; include OEM authorizations if required. Ensure pre-dispatch inspection readiness, and provide details of capability to supply 700,000 KGS of Prefab IBR CS/AS piping. Attachment of EMD documentation and technical bid is essential.

What documents are required for the BHEL piping tender in 2026?

Required documents include GST certificate, PAN, turnover statements, experience certificates for piping supply, technical bid, EMD documentation, and OEM authorizations if applicable. Prepare pre-dispatch inspection reports and lab testing certificates as per GTC terms.

What is the inspection process for the BHEL piping framework tender?

Pre-dispatch inspection occurs at seller premises or an authorized agency; buyer bears external inspection charges. Seller must notify readiness; 7 days for inspection after email notice; consignee may reject goods if non-conforming.

What are the delivery terms for quantity variation in this tender?

The buyer may increase quantity up to 25% of bid quantity and may extend delivery time proportionally, with a minimum extension of 30 days; delivery starts from the last date of the original order.

What are the warranty expectations for the piping supply framework?

Warranty is referenced but not fully specified in the data; bidders should await contract terms for warranty duration and coverage, and any AMC requirements after award.

What is the scope of supply for this BHEL piping tender 2026?

Scope is strictly supply of goods; there is no installation or service component mentioned. Ensure you can deliver 700,000 KGS of Prefab IBR CS/AS piping to the designated buyer locations.

What standards or certifications are required for the piping supply?

The tender data does not specify IS/ISO requirements; bidders should align with typical piping grade standards and expect contractually defined certification requirements, including quality and testing documents during pre-dispatch inspection.

When will inspection readiness notices be issued for this framework?

Buyer will send an email offering goods for inspection; the seller must report readiness promptly. The 7-day inspection clock starts from the date of email notification for readiness.