TenderDekho Logo
GEM

Invitation to Bid - Eccentric guide assembly for GBC 1,Eccentric guide assembly for GBC 2,Eccentric guide assembly for in DIBRUGARH, ASSAM

Bid Publish Date

10-Jul-2026, 12:46 pm

Bid End Date

31-Jul-2026, 1:00 pm

Value

₹85,00,000

Progress

Issue10-Jul-2026, 12:46 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

96

Category

Eccentric guide assembly for GBC 1

Bid Type

Two Packet Bid

Public procurement opportunity for North Eastern Electric Power Corporation Limited Eccentric guide assembly for GBC 1, Eccentric guide assembly for GBC 2, Eccentric guide assembly for GBC 3, Eccentric guide assembly for Inner casing, Eccentric guide assembly for BP gland, Threaded bush and spherical washer for GBC 1, Threaded bush and spherical washer for GBC 2, Threaded bush and spherical washer for GBC 3, Threaded bush and spherical washer for BP gland, Packer plate for inner casing with screw, Disc spring, Oil scrapping ring for front oil gland, Oil scrapping ring for rear oil gland front, Oil scrapping ring for rear oil gland rear, ESV Valve cone ESV part no 4, ESV Valve spindle ESV part no 21, Bush 40 x 65 x 94 ESV part no 17, Plug screw ESV position no 18, Threaded bush ESV part no 22, Stud M24 x 206 ESV part no 23, Cap nut ESV part no 33, Cap nut M30 ESV part no 34, Cap screw ESV part no 35, Washer 47 x 90 x 5 ESV part no 39, Hex nut M 24 ESV part no 42, Ring TRDL SELG Static ID400 thk 41 ESV part no 59, Clamping sleeve 6 x 60 ESV part no 56 and 57, Circlip for A90 ESV part no 55, Governing control valve packing part no 11, GCV spindle GCV part no 05 with lock nut part no 6 and 7 in DIBRUGARH, ASSAM. Quantity: 96 issued by. Submission Deadline: 31-07-2026 13: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Eccentric guide assembly for GBC 1 , Eccentric guide assembly for GBC 2 , Eccentric guide assembly for GBC 3 , Eccentric guide assembly for Inner casing , Eccentric guide assembly for BP gland , Threaded bush and spherical washer for GBC 1 , Threaded bush and spherical washer for GBC 2 , Threaded bush and spherical washer for GBC 3 , Threaded bush and spherical washer for BP gland , Packer plate for inner casing with screw , Disc spring , Oil scrapping ring for front oil gland , Oil scrapping ring for rear oil gland front , Oil scrapping ring for rear oil gland rear , ESV Valve cone ESV part no 4 , ESV Valve spindle ESV part no 21 , Bush 40 x 65 x 94 ESV part no 17 , Plug screw ESV position no 18 , Threaded bush ESV part no 22 , Stud M24 x 206 ESV part no 23 , Cap nut ESV part no 33 , Cap nut M30 ESV part no 34 , Cap screw ESV part no 35 , Washer 47 x 90 x 5 ESV part no 39 , Hex nut M 24 ESV part no 42 , Ring TRDL SELG Static ID400 thk 41 ESV part no 59 , Clamping sleeve 6 x 60 ESV part no 56 and 57 , Circlip for A90 ESV part no 55 , Governing control valve packing part no 11 , GCV spindle GCV part no 05 with lock nut part no 6 and 7

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Dibrugarh

Delivery Pincodes

786191

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Binita Dutta786191,AGBP, NEEPCO, Bokuloni, Dibrugarh, AssamDibrugarhAssam7861912180-

Authority Records

MINISTRY OF POWER

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9587832.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 30 Items Sign in for GEM prices

#1

Eccentric guide assembly for GBC 1

Eccentric guide assembly for GBC 1 includes guide bush and lock screw

2 set Delivery: 180 days
#2

Eccentric guide assembly for GBC 2

Eccentric guide assembly for GBC 2 includes guide bush and lock screw

2 set Delivery: 180 days
#3

Eccentric guide assembly for GBC 3

Eccentric guide assembly for GBC 3 includes guide bush and lock screw

2 set Delivery: 180 days
#4

Eccentric guide assembly for Inner casing

Eccentric guide assembly for Inner casing includes guide bush and lock screw

2 set Delivery: 180 days
#5

Eccentric guide assembly for BP gland

Eccentric guide assembly for BP gland includes guide bush and lock screw

2 set Delivery: 180 days
#6

Threaded bush and spherical washer for GBC 1

Threaded bush and spherical washer for GBC 1 each set includes threaded cup 1, threaded cup 2, two nos spherical washer and lock screw

4 set Delivery: 180 days
#7

Threaded bush and spherical washer for GBC 2

Threaded bush and spherical washer for GBC 2 each set includes threaded cup 1, threaded cup 2, two nos spherical washer and lock screw

8 set Delivery: 180 days
#8

Threaded bush and spherical washer for GBC 3

Threaded bush and spherical washer for GBC 3 each set includes threaded cup 1, threaded cup 2, two nos spherical washer and lock screw

4 set Delivery: 180 days
#9

Threaded bush and spherical washer for BP gland

Threaded bush and spherical washer for GBC 3 each set includes threaded cup 1, threaded cup 2, two nos spherical washer and lock screw

4 set Delivery: 180 days
#10

Packer plate for inner casing with screw

Packer plate for inner casing with screw

8 nos Delivery: 180 days
#11

Disc spring

Disc spring for turbine paws

4 nos Delivery: 180 days
#12

Oil scrapping ring for front oil gland

Oil scrapping ring for front oil gland

1 set Delivery: 180 days
#13

Oil scrapping ring for rear oil gland front

Oil scrapping ring for rear oil gland front

1 set Delivery: 180 days
#14

Oil scrapping ring for rear oil gland rear

Oil scrapping ring for rear oil gland rear

1 set Delivery: 180 days
#15

ESV Valve cone ESV part no 4

ESV Valve cone ESV part no 4

2 nos Delivery: 180 days
#16

ESV Valve spindle ESV part no 21

ESV Valve spindle ESV part no 21

2 nos Delivery: 180 days
#17

Bush 40 x 65 x 94 ESV part no 17

Bush 40 x 65 x 94 ESV part no 17

2 nos Delivery: 180 days
#18

Plug screw ESV position no 18

Plug screw ESV position no 18

2 nos Delivery: 180 days
#19

Threaded bush ESV part no 22

Threaded bush ESV part no 22

2 nos Delivery: 180 days
#20

Stud M24 x 206 ESV part no 23

Stud M24 x 206 ESV part no 23

12 nos Delivery: 180 days
#21

Cap nut ESV part no 33

Cap nut ESV part no 33

2 nos Delivery: 180 days
#22

Cap nut M30 ESV part no 34

Cap nut M30 ESV part no 34

2 nos Delivery: 180 days
#23

Cap screw ESV part no 35

Cap screw ESV part no 35

2 nos Delivery: 180 days
#24

Washer 47 x 90 x 5 ESV part no 39

Washer 47 x 90 x 5 ESV part no 39

2 nos Delivery: 180 days
#25

Hex nut M 24 ESV part no 42

Hex nut M 24 ESV part no 42

12 nos Delivery: 180 days
#26

Ring TRDL SELG Static ID400 thk 41 ESV part no 59

Ring TRDL SELG Static ID400 thk 41 ESV part no 59

2 nos Delivery: 180 days
#27

Clamping sleeve 6 x 60 ESV part no 56 and 57

Clamping sleeve 6 x 60 ESV part no 56 and 57

2 nos Delivery: 180 days
#28

Circlip for A90 ESV part no 55

Circlip for A90 ESV part no 55

2 nos Delivery: 180 days
#29

Governing control valve packing part no 11

Governing control valve packing part no 11

2 set Delivery: 180 days
#30

GCV spindle GCV part no 05 with lock nut part no 6 and 7

GCV spindle GCV part no 05 with lock nut part no 6 and 7

1 nos Delivery: 180 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer