TenderDekho Logo
Closed GEM

Bids are Invited For Hybrid Inverter,Lithium Battery Bank,DC Cable,AC Cable,Internal Wiring,MC4 Connectors,AC Distributi in SAMASTIPUR, BIHAR

Bid Publish Date

21-Jul-2026, 4:50 pm

Bid End Date

11-Aug-2026, 5:00 pm

Progress

RA
Issue21-Jul-2026, 4:50 pm
Reverse AuctionCompleted
Award30-Sep-2026, 8:13 pm

Public procurement opportunity for N/a Hybrid Inverter, Lithium Battery Bank, DC Cable, AC Cable, Internal Wiring, MC4 Connectors, AC Distribution Box, DC Distribution Box, Consumables in SAMASTIPUR, BIHAR. Quantity: 20 issued by. Submission Deadline: 11-08-2026 17: 00: 00. View full details and respond.

Advertisement

Authority & Contact

Organization

N/a

Office Name

Dr Rajendra Pd Central Agril University Bihar

Grievance Contact

[email protected]

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1BICOP INDIA SOLAR(MSE,MII)   Under PMA Winner ₹4,88,800Item Categories : Hybrid Inverter,Lithium Battery Bank,DC Cable,AC Cable,Internal Wiring,MC4 Connectors,AC Distributi
L2ASAP SOLUTIONS (MII)   Under PMA₹4,90,000Item Categories : Hybrid Inverter,Lithium Battery Bank,DC Cable,AC Cable,Internal Wiring,MC4 Connectors,AC Distributi
L3Prayag Solar Power (MII)   Under PMA₹6,49,000Item Categories : Hybrid Inverter,Lithium Battery Bank,DC Cable,AC Cable,Internal Wiring,MC4 Connectors,AC Distributi

🎉 L1 Winner

BICOP INDIA SOLAR(MSE,MII)   Under PMA

Final Price: ₹4,88,800

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.

Reverse Auction Schedule

Completed

Start

15-Sep-2026, 10:00 pm

End

17-Sep-2026, 9:00 am

Duration: 35 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

20

Category

Hybrid Inverter

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Hybrid Inverter , Lithium Battery Bank , DC Cable , AC Cable , Internal Wiring , MC4 Connectors , AC Distribution Box , DC Distribution Box , Consumables

Advisory Bank

PUNJAB NATIONAL BANK

ePBG Percentage

5%

ePBG Duration (Months)

62

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Samastipur

Delivery Pincodes

848125

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajeev Kumar848125,Dr. Rajendra Prasad Central Agricultural University, Pusa, Samastipur, BiharSamastipurBihar848125245-

Authority Records

MINISTRY OF AGRICULTURE AND FARMERS WELFAREAGRICULTURAL RESEARCH AND EDUCATION DEPARTMENT
Advertisement

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9409951.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

Hybrid Inverter

5 kW Single Phase Hybrid Inverter

2 pcs Delivery: 45 days
#2

Lithium Battery Bank

Lithium Battery Bank of 51.2 V, 100 Ah capacity with minimum 4-hour backup at full load

2 pcs Delivery: 45 days
#3

DC Cable

DC cable for connection from solar module to inverter

2 sets Delivery: 45 days
#4

AC Cable

AC cable for connection from inverter to Main LT Panel

2 sets Delivery: 45 days
#5

Internal Wiring

Internal wiring

2 sets Delivery: 45 days
#6

MC4 Connectors

Original and compatible MC4 connectors suitable for solar DC connections

2 sets Delivery: 45 days
#7

AC Distribution Box

ACDB suitable for 5 kW hybrid solar system with necessary MCB/MCCB, SPD

2 pcs Delivery: 45 days
#8

DC Distribution Box

DCDB suitable for solar PV application

2 pcs Delivery: 45 days
#9

Consumables

Supply of necessary consumables

2 as required Delivery: 45 days
#10

Consumables

Earthing Solar Plate Paint Panel etc

2 as required Delivery: 45 days

Categories 40

Advertisement