TenderDekho Logo
Closed GEM

Government Tender Published for PC with Drone Simulation Software and FPV Goggles EV 800 and Controller Radio Master and 600 VA UPS in SAGAR, MADHYA PRADESH

Bid Publish Date

16-Sep-2026, 2:51 pm

Bid End Date

01-Oct-2026, 7:00 pm

EMD

₹2,50,000

Generate Docs

Progress

RA
Issue16-Sep-2026, 2:51 pm
Corrigendum29-Sep-2026
Reverse Auction18-Oct-2026, 3:00 pm
AwardPending

Indian Army announces a tender for PC with Drone Simulation Software and FPV Goggles EV 800 and Controller Radio Master and 600 VA UPS, 4 K GPS Drone with Screen Recording, Day and Night Surveillance Thermal Imaging Drone, AC 1. 5 ton with stabilizer wiring and installation, 30 KVA Generator with installation and movable Chassis, Wooden Computer Table 9 x 2. 5ft, Computer Chair, Electric Boards with installation, Multiple Drone Charging Station, DSLR D70 Camera with Accys, Flexes and Info Boards, 3 Phase Wiring and DP Boxes and Earthing Work and Installation, Drone and Accys Storage Cabinet, Drone Training Hub LED Boards, Laptop, Infra Development and Upgradation. in SAGAR, MADHYA PRADESH. Quantity: 173. Submission Deadline: 01-10-2026 19: 00: 00. Last date to apply is approaching fast!

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Reverse Auction Schedule

Upcoming

Start

18-Oct-2026, 3:00 pm

End

19-Oct-2026, 3:00 pm

Duration: 24 hours

Reverse Auction Document

⏳ RA scheduled. Ensure you are registered to participate.

Tender Data

Bid Details

Quantity

173

Category

PC with Drone Simulation Software and FPV Goggles EV 800 and Controller Radio Master and 600 VA UPS

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

40

OEM Avg. Turnover

40

Past Performance

50 %

Warranty Period

3 years

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

PC with Drone Simulation Software and FPV Goggles EV 800 and Controller Radio Master and 600 VA UPS , 4 K GPS Drone with Screen Recording , Day and Night Surveillance Thermal Imaging Drone , AC 1.5 ton with stabilizer wiring and installation , 30 KVA Generator with installation and movable Chassis , Wooden Computer Table 9 x 2.5ft , Computer Chair , Electric Boards with installation , Multiple Drone Charging Station , DSLR D70 Camera with Accys , Flexes and Info Boards , 3 Phase Wiring and DP Boxes and Earthing Work and Installation , Drone and Accys Storage Cabinet , Drone Training Hub LED Boards , Laptop , Infra Development and Upgradation.

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

38

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

SAGAR

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-SAGARSAGAR--3045-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9862768.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 16 Items Sign in for GEM prices

#1

PC with Drone Simulation Software and FPV Goggles EV 800 and Controller Radio Master and 600 VA UPS

PC with Drone Simulation Software and FPV Goggles EV 800 and Controller Radio Master and 600 VA UPS

30 nos Delivery: 45 days
#2

4 K GPS Drone with Screen Recording

4 K GPS Drone with Screen Recording

40 nos Delivery: 45 days
#3

Day and Night Surveillance Thermal Imaging Drone

Day and Night Surveillance Thermal Imaging Drone

1 nos Delivery: 45 days
#4

AC 1.5 ton with stabilizer wiring and installation

AC 1.5 ton with stabilizer wiring and installation

10 nos Delivery: 45 days
#5

30 KVA Generator with installation and movable Chassis

30 KVA Generator with installation and movable Chassis

1 nos Delivery: 45 days
#6

Wooden Computer Table 9 x 2.5ft

Wooden Computer Table 9 x 2.5ft

10 nos Delivery: 45 days
#7

Computer Chair

Computer Chair

30 nos Delivery: 45 days
#8

Electric Boards with installation

Electric Boards with installation

30 nos Delivery: 45 days
#9

Multiple Drone Charging Station

Multiple Drone Charging Station

2 nos Delivery: 45 days
#10

DSLR D70 Camera with Accys

DSLR D70 Camera with Accys

1 nos Delivery: 45 days
#11

Flexes and Info Boards

Flexes and Info Boards

10 nos Delivery: 45 days
#12

3 Phase Wiring and DP Boxes and Earthing Work and Installation

3 Phase Wiring and DP Boxes and Earthing Work and Installation

1 nos Delivery: 45 days
#13

Drone and Accys Storage Cabinet

Drone and Accys Storage Cabinet

3 nos Delivery: 45 days
#14

Drone Training Hub LED Boards

Drone Training Hub LED Boards

1 nos Delivery: 45 days
#15

Laptop

Laptop

2 nos Delivery: 45 days
#16

Infra Development and Upgradation.

Infra Development and Upgradation.

1 job Delivery: 45 days

Categories 33

Corrigendum Updates

1 Update
#1

Update

29-Sep-2026

Extended Deadline

01-Oct-2026, 1:30 pm

Opening Date

02-Oct-2026, 1:30 pm

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement