Progress
Quantity
11
Category
ISOTHERMAL SEMI BATCH REACTOR SS 2 LTR
Bid Type
Two Packet Bid
Public procurement opportunity for Directorate Of Technical Education ISOTHERMAL SEMI BATCH REACTOR SS 2 LTR, ISOTHERMAL BATCH REACTOR SS, CSTR, PFR, NATURAL CONVECTION VERTICAL DUCT, THERMAL CONDUCTIVITY OF METAL ROD CU 600 MM, FORCED CONVECTION HORIZONTAL EXT HEATED 28 MM DIA, THERMAL CONDUCTIVITY OF INSULATING MATERIAL SLAB 180 MM DIA 12 MM THICK COOLING CHAMBER, CRITICAL HEAT FLUX SS RECTANGULAR, RECIPROCATING PUMP TEST RIG ISI 1 HP 250 RPM, CENTRIFUGAL PUMP TEST RIG ISI 1 HP 2800 RPM in BHARUCH, GUJARAT. Quantity: 11 issued by. Submission Deadline: 18-02-2026 18: 00: 00. View full details and respond.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
ISOTHERMAL SEMI BATCH REACTOR SS 2 LTR , ISOTHERMAL BATCH REACTOR SS , CSTR , PFR , NATURAL CONVECTION VERTICAL DUCT , THERMAL CONDUCTIVITY OF METAL ROD CU 600 MM , FORCED CONVECTION HORIZONTAL EXT HEATED 28 MM DIA , THERMAL CONDUCTIVITY OF INSULATING MATERIAL SLAB 180 MM DIA 12 MM THICK COOLING CHAMBER , CRITICAL HEAT FLUX SS RECTANGULAR , RECIPROCATING PUMP TEST RIG ISI 1 HP 250 RPM , CENTRIFUGAL PUMP TEST RIG ISI 1 HP 2800 RPM
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
ISOTHERMAL SEMI BATCH REACTOR SS 2 LTR
ISOTHERMAL SEMI BATCH REACTOR SS/ 2 LTR
ISOTHERMAL BATCH REACTOR SS
ISOTHERMAL BATCH REACTOR (SS)
CSTR
CSTR
PFR
PFR
NATURAL CONVECTION VERTICAL DUCT
NATURAL CONVECTION/ VERTICAL/ DUCT
THERMAL CONDUCTIVITY OF METAL ROD CU 600 MM
THERMAL CONDUCTIVITY OF METAL ROD/ CU/ 600 MM
FORCED CONVECTION HORIZONTAL EXT HEATED 28 MM DIA
FORCED CONVECTION/ HORIZONTAL/ EXT HEATED/ 28 MM DIA
THERMAL CONDUCTIVITY OF INSULATING MATERIAL SLAB 180 MM DIA 12 MM THICK COOLING CHAMBER
THERMAL CONDUCTIVITY OF INSULATING MATERIAL/ SLAB/ 180 MM DIA/ 12 MM THICK/ COOLING CHAMBER
CRITICAL HEAT FLUX SS RECTANGULAR
CRITICAL HEAT FLUX / SS/ RECTANGULAR
RECIPROCATING PUMP TEST RIG ISI 1 HP 250 RPM
RECIPROCATING PUMP TEST RIG/ ISI/ 1 HP / 250 RPM
CENTRIFUGAL PUMP TEST RIG ISI 1 HP 2800 RPM
CENTRIFUGAL PUMP TEST RIG/ ISI/ 1 HP / 2800 RPM
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | ISOTHERMAL SEMI BATCH REACTOR SS 2 LTR | ISOTHERMAL SEMI BATCH REACTOR SS/ 2 LTR | 1 | pieces | chemicalskjp@645 | 30 | |
| 2 | ISOTHERMAL BATCH REACTOR SS | ISOTHERMAL BATCH REACTOR (SS) | 1 | pieces | chemicalskjp@645 | 30 | |
| 3 | CSTR | CSTR | 1 | pieces | chemicalskjp@645 | 30 | |
| 4 | PFR | PFR | 1 | pieces | chemicalskjp@645 | 30 | |
| 5 | NATURAL CONVECTION VERTICAL DUCT | NATURAL CONVECTION/ VERTICAL/ DUCT | 1 | pieces | chemicalskjp@645 | 30 | |
| 6 | THERMAL CONDUCTIVITY OF METAL ROD CU 600 MM | THERMAL CONDUCTIVITY OF METAL ROD/ CU/ 600 MM | 1 | pieces | chemicalskjp@645 | 30 | |
| 7 | FORCED CONVECTION HORIZONTAL EXT HEATED 28 MM DIA | FORCED CONVECTION/ HORIZONTAL/ EXT HEATED/ 28 MM DIA | 1 | pieces | chemicalskjp@645 | 30 | |
| 8 | THERMAL CONDUCTIVITY OF INSULATING MATERIAL SLAB 180 MM DIA 12 MM THICK COOLING CHAMBER | THERMAL CONDUCTIVITY OF INSULATING MATERIAL/ SLAB/ 180 MM DIA/ 12 MM THICK/ COOLING CHAMBER | 1 | pieces | chemicalskjp@645 | 30 | |
| 9 | CRITICAL HEAT FLUX SS RECTANGULAR | CRITICAL HEAT FLUX / SS/ RECTANGULAR | 1 | pieces | chemicalskjp@645 | 30 | |
| 10 | RECIPROCATING PUMP TEST RIG ISI 1 HP 250 RPM | RECIPROCATING PUMP TEST RIG/ ISI/ 1 HP / 250 RPM | 1 | pieces | chemicalskjp@645 | 30 | |
| 11 | CENTRIFUGAL PUMP TEST RIG ISI 1 HP 2800 RPM | CENTRIFUGAL PUMP TEST RIG/ ISI/ 1 HP / 2800 RPM | 1 | pieces | chemicalskjp@645 | 30 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | CREATIVE LABS Under PMA | - | 18-02-2026 12:39:25 | |
| 2 | ETHER ENGINEERS Under PMA | - | 18-02-2026 17:32:23 | |
| 3 | INNOVATIVE RESEARCH EQUIPMENTS Under PMA | - | 10-02-2026 12:40:29 | |
| 4 | MASS INTERNATIONAL Under PMA | - | 16-02-2026 15:53:10 | |
| 5 | NITYUG TECHNOLOGIES LLP Under PMA | - | 18-02-2026 14:37:14 |
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS