Progress
Bharat Earth Movers Limited (BEML) invites bids for a DG SET 40kVA, 415V, 3-Phase unit aligned to Part No 58521103 under the Department of Defence Production. The tender notes a flexible quantity clause allowing up to 50% increase/decrease at contracted rates, with delivery time adjustments based on the extended period. Location details are not specified, but the procurement targets a robust, field-ready generator set suitable for defence production contexts. The exclusive focus on a high-capacity, industrial-grade DG SET emphasizes reliability, after-sales support, and compatible interface with defence logistics. The option clause is a critical differentiator, enabling scalable procurement within contract frameworks.
Product/service: DG SET 40kVA, 415V, 3-Phase
Part number: 58521103
Quantity: up to ±50% quantity variation at contract rates
Delivery: period adjusted based on added quantity with minimum 30 days
EMD/Value: not specified in available data
Standards/Testing: not specified; bidders should confirm standards alignment and testing protocols
Option Clause allows ±50% quantity change at contracted rates
Delivery extension uses a proportional formula with 30-day minimum
Delivery start timingbased on last date of original delivery order
Location and precise EMD/payment terms are not disclosed
Delivery periods can be adjusted for quantity changes; minimum extension 30 days.
Purchaser may increase or decrease quantity up to 50% during contract; rates remain fixed.
Not specified in current data; bidders should seek clarified terms with the buyer before submission.
Experience in supplying DG SETs of similar capacity
Financial capacity to handle up to 50% quantity variation
Compliance with defence procurement norms and documentation
Quantity
10
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
DG SET 40kVA, 415, 3Ph TO PART NO - 58521103
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
42
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
BANGALORE
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | BANGALORE | BANGALORE | - | - | 10 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience certificates for similar DG SET supply
Financial statements for the last 2-3 years
EMD/Security deposit details (if required) and payment proof
Technical bid documents confirming DG SET 40kVA, 415V 3-Phase capability
OEM authorization for part number 58521103 (if applicable)
Any existing ISI/ISO certifications or standards compliance proofs (if demanded)
Key insights about KARNATAKA tender market
Bidders should verify the exact unit specification: 40kVA, 415V, 3-Phase, Part No 58521103. Prepare bids with proof of GST, PAN, experience in similar DG SET supply, and financial statements. Clarify EMD terms and delivery schedule tied to quantity adjustments up to 50%.
Mandatory documents include GST certificate, PAN, experience certificates for similar DG SET supply, financial statements, EMD details, and OEM authorizations if applicable. Technical bid must confirm compliance with 40kVA, 415V, 3-Phase specifications and installation coordination.
The purchaser may increase or decrease the bid quantity by up to 50% at contracted rates. The delivery period will be adjusted proportionally, subject to a minimum extension of 30 days as per the option clause.
Delivery time scales with quantity changes using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Extensions may cover the full original delivery period if needed.
Standards are not explicitly listed in the available data. Bidders should confirm compatibility with defence electrical standards and provide any ISI/ISO certifications or testing results that demonstrate reliability for 40kVA, 415V, 3-Phase operation.
The tender specifies DG SET 40kVA, 415V, 3-Phase with Part No 58521103. Bidders must ensure their offering matches this model specification and can provide OEM confirmation or equivalent performance data.
Delivery starts from the last date of the original delivery order. If quantity increases, the additional time equals (increase/original quantity) × original period, with minimum 30 days; extensions can go up to the original delivery period.