Bid Publish Date
24-Apr-2026, 5:26 pm
Bid End Date
01-Jun-2026, 12:00 pm
EMD
₹20,000
Value
₹20,00,000
Location
Progress
RAQuantity
32394
Category
Carriage and Installation of 25 KVA Transformer
Bid Type
Two Packet Bid
A tender has been published for Uttar Pradesh Power Corporation Limited (uppcl) Carriage of PCC and STP poles 8. 5, 11 and 13 Mtr, Carriage of line material, Erection of PCC and STP poles 8. 5, 11 and 13 Mtr, Erection of Double poles 8. 5, 11 and 13 Mtr, Installation and fixing of 11 KV TPMO. , Erection and Grouting of stay set, Providing and fixing of insulator, Laying of ACSR Weasal, Rabbit and Dog Conductor. , Erection of ABC Conductor, Grouting of PCC and STP poles, Making of plinth, Fixing of earthing rod, Chopping of tree branches, Providing and Fixing of Clamps of LT, Providing and Fixing, Carriage and Installation of 25 KVA Transformer, Carriage and Installation of 63 KVA Transformer, Carriage and Installation of 100 KVA Transformer, Carriage and Installation of 400 KVA Transformer, Dismantling of old PCC and STP poles, Dismantling and removal of conductor, Erection of section Tee Pole, Carriage and Installation of LT Dist Box, Provding and Fixing, Filling cable joints, Safe carriage of cables, Laying of under ground cable, Laying of Overhead cable, Guarding of 11 KV Line by GI wire, Safe Carriage and Installation of metering unit, Safe carriage and Installation of metering cubicle, Provding and Fixing Wearing GI pipe in ALIGARH, UTTAR PRADESH. Quantity: 32394 by. Submission Deadline: 01-06-2026 12: 00: 00. Check eligibility and apply.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Carriage of PCC and STP poles 8.5, 11 and 13 Mtr , Carriage of line material , Erection of PCC and STP poles 8.5, 11 and 13 Mtr , Erection of Double poles 8.5, 11 and 13 Mtr , Installation and fixing of 11 KV TPMO. , Erection and Grouting of stay set , Providing and fixing of insulator , Laying of ACSR Weasal, Rabbit and Dog Conductor. , Erection of ABC Conductor , Grouting of PCC and STP poles , Making of plinth , Fixing of earthing rod , Chopping of tree branches , Providing and Fixing of Clamps of LT , Providing and Fixing , Carriage and Installation of 25 KVA Transformer , Carriage and Installation of 63 KVA Transformer , Carriage and Installation of 100 KVA Transformer , Carriage and Installation of 400 KVA Transformer , Dismantling of old PCC and STP poles , Dismantling and removal of conductor , Erection of section Tee Pole , Carriage and Installation of LT Dist Box , Provding and Fixing, Filling cable joints , Safe carriage of cables , Laying of under ground cable , Laying of Overhead cable , Guarding of 11 KV Line by GI wire , Safe Carriage and Installation of metering unit , Safe carriage and Installation of metering cubicle , Provding and Fixing Wearing GI pipe
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Carriage of PCC and STP poles 8.5, 11 and 13 Mtr
Carriage of PCC and STP poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, T and P carrier etc required for proper completion of work Dist 0 to 50 Kms
Carriage of line material
Carriage of line material viz LT Cable, Conductor, GI earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, T and P carrier etc required for proper completion of work Dist 0 to 50 Kms
Erection of PCC and STP poles 8.5, 11 and 13 Mtr
Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Erection of Double poles 8.5, 11 and 13 Mtr
Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Installation and fixing of 11 KV TPMO.
Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Erection and Grouting of stay set
Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work
Providing and fixing of insulator
Providing and fixing of stay insulator
Laying of ACSR Weasal, Rabbit and Dog Conductor.
Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work
Erection of ABC Conductor
ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm
Grouting of PCC and STP poles
Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms
Making of plinth
Making the plinth of Steel poles
Fixing of earthing rod
Fixing of earthing rod as per RESSPO manual and as per direction of supervising engineer including the cost of labour, T and P etc Required for proper completion of work
Chopping of tree branches
Chopping of tree branches which are touching to HT and LT lines
Providing and Fixing of Clamps of LT
Providing and Fixing of Clamps of LT, Cross Arm Holding, F Clamp, Stay Clamp, Danger board clamp and all type clamps with Nut and Bolts as per actual site requirement
Providing and Fixing
Providing and Fixing of LT shackle insulator
Providing and Fixing
Providing and Fixing of missing Nut bolts and washer
Carriage and Installation of 25 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
Carriage and Installation of 63 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
Carriage and Installation of 100 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
Carriage and Installation of 400 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
Dismantling of old PCC and STP poles
Dismentling of old PCC and STP poles for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T and P carrier etc required for proper completion of work
Dismantling and removal of conductor
Dismantling and removal of existing conductor, cable, GI Wire from the various area preparing their coils and then stacking in the respective JEOs Store as per direction of Supervising Engineer It includes the work of cartage, cost of labour, T nad P carrier etc required for proper completion of work
Erection of section Tee Pole
Erection of section Tee pole including fixing of all fittings as per RESPO norms
Carriage and Installation of LT Dist Box
Carriage and Installation of LT distribution box three phase distribution box from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESSPO norms
Provding and Fixing, Filling cable joints
Provding and Fixing and Filling of 3x70,3x120,3X185 11 KV XLPE heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour T and P carrier etc for proper completion of work
Safe carriage of cables
Safe carriage of 3x70,3x120,3X185,3x300 Sqmm 33 KV by 11 KV XLPE Cable from Store Center to respective site of work including loading and unloading at both ends for proper completion of work
Laying of under ground cable
Laying of 3x70,3x120,3X185,3x300 Sqmm 33 KV and 11 KV under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling Spare cable shall be left and buried in the trench in the shape of rings at both ends All material except cable, labour, T and P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost
Laying of Overhead cable
Laying of 3x70,3x120,3X185,3x300 Sqmm 33 KV and 11 KV Overhead cable work includes labour, T and P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost
Guarding of 11 KV Line by GI wire
Guarding of 11 KV Line by laying two nos GI wire parallel and fixing of lacings tilli at a distance at 2 to 3 Mtr as per RESPO manual and also including the cost of arragement of labour, T and P etc required for proper completion of work
Safe Carriage and Installation of metering unit
Safe Carriage and Installation of 33KV by 11 KV CT and PT Pole Mounted metering unit on double pole after fixing of channel with M S Clamps and nuts bolts for holding the channel angle etc The unit body shall be earthed by connecting M S strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 KV line shall be connected to unit as per instructions of SDO and AE M The M S Strip and earth rod shall be included in the scope of work
Safe carriage and Installation of metering cubicle
Safe carriage and Installation of 33KV by 11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work
Provding and Fixing Wearing GI pipe
Provding and Fixing Wearing GI pipe 6 inch dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 KV feeder cable with boxes on the feeder double pole structure and making connections including supply
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Carriage of PCC and STP poles 8.5, 11 and 13 Mtr | Carriage of PCC and STP poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, T and P carrier etc required for proper completion of work Dist 0 to 50 Kms | 270 | nos | edcaligarh2consignee | 21 | |
| 2 | Carriage of line material | Carriage of line material viz LT Cable, Conductor, GI earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, T and P carrier etc required for proper completion of work Dist 0 to 50 Kms | 7,000 | kg | edcaligarh2consignee | 21 | |
| 3 | Erection of PCC and STP poles 8.5, 11 and 13 Mtr | Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 134 | nos | edcaligarh2consignee | 21 | |
| 4 | Erection of Double poles 8.5, 11 and 13 Mtr | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 64 | nos | edcaligarh2consignee | 21 | |
| 5 | Installation and fixing of 11 KV TPMO. | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 64 | nos | edcaligarh2consignee | 21 | |
| 6 | Erection and Grouting of stay set | Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work | 140 | nos | edcaligarh2consignee | 21 | |
| 7 | Providing and fixing of insulator | Providing and fixing of stay insulator | 140 | nos | edcaligarh2consignee | 21 | |
| 8 | Laying of ACSR Weasal, Rabbit and Dog Conductor. | Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work | 20,000 | mtr | edcaligarh2consignee | 21 | |
| 9 | Erection of ABC Conductor | ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm | 800 | mtr | edcaligarh2consignee | 21 | |
| 10 | Grouting of PCC and STP poles | Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms | 260 | nos | edcaligarh2consignee | 21 | |
| 11 | Making of plinth | Making the plinth of Steel poles | 12 | nos | edcaligarh2consignee | 21 | |
| 12 | Fixing of earthing rod | Fixing of earthing rod as per RESSPO manual and as per direction of supervising engineer including the cost of labour, T and P etc Required for proper completion of work | 270 | nos | edcaligarh2consignee | 21 | |
| 13 | Chopping of tree branches | Chopping of tree branches which are touching to HT and LT lines | 40 | nos | edcaligarh2consignee | 21 | |
| 14 | Providing and Fixing of Clamps of LT | Providing and Fixing of Clamps of LT, Cross Arm Holding, F Clamp, Stay Clamp, Danger board clamp and all type clamps with Nut and Bolts as per actual site requirement | 320 | nos | edcaligarh2consignee | 21 | |
| 15 | Providing and Fixing | Providing and Fixing of LT shackle insulator | 20 | nos | edcaligarh2consignee | 21 | |
| 16 | Providing and Fixing | Providing and Fixing of missing Nut bolts and washer | 120 | kg | edcaligarh2consignee | 21 | |
| 17 | Carriage and Installation of 25 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 48 | nos | edcaligarh2consignee | 21 | |
| 18 | Carriage and Installation of 63 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 12 | nos | edcaligarh2consignee | 21 | |
| 19 | Carriage and Installation of 100 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 10 | nos | edcaligarh2consignee | 21 | |
| 20 | Carriage and Installation of 400 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 4 | nos | edcaligarh2consignee | 21 | |
| 21 | Dismantling of old PCC and STP poles | Dismentling of old PCC and STP poles for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T and P carrier etc required for proper completion of work | 4 | nos | edcaligarh2consignee | 21 | |
| 22 | Dismantling and removal of conductor | Dismantling and removal of existing conductor, cable, GI Wire from the various area preparing their coils and then stacking in the respective JEOs Store as per direction of Supervising Engineer It includes the work of cartage, cost of labour, T nad P carrier etc required for proper completion of work | 200 | mtr | edcaligarh2consignee | 21 | |
| 23 | Erection of section Tee Pole | Erection of section Tee pole including fixing of all fittings as per RESPO norms | 8 | nos | edcaligarh2consignee | 21 | |
| 24 | Carriage and Installation of LT Dist Box | Carriage and Installation of LT distribution box three phase distribution box from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESSPO norms | 32 | nos | edcaligarh2consignee | 21 | |
| 25 | Provding and Fixing, Filling cable joints | Provding and Fixing and Filling of 3x70,3x120,3X185 11 KV XLPE heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour T and P carrier etc for proper completion of work | 10 | nos | edcaligarh2consignee | 21 | |
| 26 | Safe carriage of cables | Safe carriage of 3x70,3x120,3X185,3x300 Sqmm 33 KV by 11 KV XLPE Cable from Store Center to respective site of work including loading and unloading at both ends for proper completion of work | 800 | mtr | edcaligarh2consignee | 21 | |
| 27 | Laying of under ground cable | Laying of 3x70,3x120,3X185,3x300 Sqmm 33 KV and 11 KV under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling Spare cable shall be left and buried in the trench in the shape of rings at both ends All material except cable, labour, T and P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost | 800 | mtr | edcaligarh2consignee | 21 | |
| 28 | Laying of Overhead cable | Laying of 3x70,3x120,3X185,3x300 Sqmm 33 KV and 11 KV Overhead cable work includes labour, T and P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost | 100 | mtr | edcaligarh2consignee | 21 | |
| 29 | Guarding of 11 KV Line by GI wire | Guarding of 11 KV Line by laying two nos GI wire parallel and fixing of lacings tilli at a distance at 2 to 3 Mtr as per RESPO manual and also including the cost of arragement of labour, T and P etc required for proper completion of work | 700 | mtr | edcaligarh2consignee | 21 | |
| 30 | Safe Carriage and Installation of metering unit | Safe Carriage and Installation of 33KV by 11 KV CT and PT Pole Mounted metering unit on double pole after fixing of channel with M S Clamps and nuts bolts for holding the channel angle etc The unit body shall be earthed by connecting M S strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 KV line shall be connected to unit as per instructions of SDO and AE M The M S Strip and earth rod shall be included in the scope of work | 4 | nos | edcaligarh2consignee | 21 | |
| 31 | Safe carriage and Installation of metering cubicle | Safe carriage and Installation of 33KV by 11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work | 4 | nos | edcaligarh2consignee | 21 | |
| 32 | Provding and Fixing Wearing GI pipe | Provding and Fixing Wearing GI pipe 6 inch dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 KV feeder cable with boxes on the feeder double pole structure and making connections including supply | 4 | job | edcaligarh2consignee | 21 |
Experience Criteria
Past Performance
Bidder Turnover
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
01-Jun-2026, 12:00 pm
Opening Date
01-Jun-2026, 12:30 pm
Extended Deadline
28-May-2026, 12:00 pm
Opening Date
28-May-2026, 12:30 pm
Extended Deadline
25-May-2026, 12:00 pm
Opening Date
25-May-2026, 12:30 pm
Start
18-Jun-2026, 12:00 pm
End
19-Jun-2026, 4:00 pm
Duration: 28 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ********** Under PMA | - | 20-05-2026 21:12:28 | |
| 2 | ********** Under PMA | - | 27-05-2026 18:55:14 |
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS