TenderDekho Logo
Active GEM

Contract Bidding Open For 8 Port POE Switch with 2 SFP Port,PVC Conduit Channel Flexible Conduit HDPE Pipe,Rack 2U 4U,6 Core in BIKANER, RAJASTHAN

Bid Publish Date

09-Oct-2026, 4:38 pm

Bid End Date

30-Oct-2026, 5:00 pm

Value

₹2,88,392

Progress

Issue09-Oct-2026, 4:38 pm
AwardPending

Indian Army announces a tender for 8 Port POE Switch with 2 SFP Port, PVC Conduit Channel Flexible Conduit HDPE Pipe, Rack 2U 4U, 6 Core Armored SM Outdoor OFC Cable, Media Converters Fiber Module, Laying of OFC UTP Charges, Junction Box Mounting Clamps, Patch Cord Pigtails JC Boxes Connectors Clamps, MCB Thimble DIN Rail Power Connectors Junction Bow Mounting Clamps, Installation and commissioning Charges, Internal Storage Device (SSD/HDD) (V2) (Q2), Ethernet Cables (Q2), Camera for CCTV System (V3) (Q2) in BIKANER, RAJASTHAN. Quantity: 3081. Submission Deadline: 30-10-2026 17: 00: 00. Last date to apply is approaching fast!

Advertisement

Tender Data

Bid Details

Quantity

3081

Category

8 Port POE Switch with 2 SFP Port

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

1

OEM Avg. Turnover

7

Past Performance

50 %

Experience Required

2 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

8 Port POE Switch with 2 SFP Port , PVC Conduit Channel Flexible Conduit HDPE Pipe , Rack 2U 4U , 6 Core Armored SM Outdoor OFC Cable , Media Converters Fiber Module , Laying of OFC UTP Charges , Junction Box Mounting Clamps , Patch Cord Pigtails JC Boxes Connectors Clamps , MCB Thimble DIN Rail Power Connectors Junction Bow Mounting Clamps , Installation and commissioning Charges , Internal Storage Device (SSD/HDD) (V2) (Q2) , Ethernet Cables (Q2) , Camera for CCTV System (V3) (Q2)

Pre-Bid & Qualification

Pre-Bid Date

28-10-2026 10:00:00

Pre-Bid Venue

Main Office 524 ASC Bn

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Bikaner

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BikanerBikaner--345-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-10007565.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 10 Items Sign in for GEM prices

#1

8 Port POE Switch with 2 SFP Port

8 Port POE Switch with 2 SFP Port

3 pieces Delivery: 45 days
#2

PVC Conduit Channel Flexible Conduit HDPE Pipe

PVC Conduit Channel Flexible Conduit HDPE Pipe

50 meter Delivery: 45 days
#3

Rack 2U 4U

Rack 2U 4U

4 pieces Delivery: 45 days
#4

6 Core Armored SM Outdoor OFC Cable

6 Core Armored SM Outdoor OFC Cable

700 meter Delivery: 45 days
#5

Media Converters Fiber Module

Media Converters Fiber Module

6 pieces Delivery: 45 days
#6

Laying of OFC UTP Charges

Laying of OFC UTP Charges

1,500 meter Delivery: 45 days
#7

Junction Box Mounting Clamps

Junction Box Mounting Clamps

1 pieces Delivery: 45 days
#8

Patch Cord Pigtails JC Boxes Connectors Clamps

Patch Cord Pigtails JC Boxes Connectors Clamps

1 pieces Delivery: 45 days
#9

MCB Thimble DIN Rail Power Connectors Junction Bow Mounting Clamps

MCB Thimble DIN Rail Power Connectors Junction Bow Mounting Clamps

1 pieces Delivery: 45 days
#10

Installation and commissioning Charges

Installation and commissioning Charges

1 pieces Delivery: 45 days

Categories 42

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement