Bid Publish Date
05-Feb-2026, 1:54 pm
Bid End Date
16-Feb-2026, 1:00 pm
Location
Progress
RAQuantity
900
Category
COPPER SILVER BRAZING ALLOY-1
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited (BHEL) invites bids for COPPER SILVER BRAZING ALLOY-1 and COPPER SILVER BRAZING ALLOY-2. The scope is defined by bidder-supplied materials with pre-dispatch inspection by TPIA and post-receipt inspection at BHEL BhopaL. Key terms include a 25% quantity option during contract, and termination rights for non-compliance, delivery delays, or insolvency. A Material Test Certificate must accompany supplies, with QA/QC checks determining acceptance. No BOQ items are listed, emphasizing material-level procurement and compliance. The tender emphasizes supplier ability to meet inspection and certification requirements within the buyer’s framework.
Product: COPPER SILVER BRAZING ALLOY-1
Product: COPPER SILVER BRAZING ALLOY-2
Inspection: Pre-dispatch by TPIA per QA/MT/BOI/018 REV NO-04 DT-18.02.2020
Inspection: Post-receipt at BHEL Bhopal
Documentation: Material Test Certificate required with supply
Option clause allows +/-25% quantity adjustment during/after contract
Delivery timing is linked to the last date of the original delivery order
Material Test Certificate and QA/QC inspection govern acceptance
Termination rights available for non-compliance or delivery failure
Not explicitly stated; terms influenced by 25% quantity option and contract at contracted rates
Delivery starts from last date of original delivery order; extended time based on formula (Increase/Original) × Original delivery period, min 30 days
Not detailed; termination clause for delays or non-compliance is specified
Eligibility to supply copper-silver brazing alloys with QA/QC capability
Ability to submit Material Test Certificate with each lot
Compliance with pre-dispatch and post-receipt inspection procedures
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
COPPER SILVER BRAZING ALLOY-1 , COPPER SILVER BRAZING ALLOY-2
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates for similar copper-silver alloy supply
Financial statements (if requested in T&C)
EMD/Security deposit documentation (as applicable in terms)
Technical bid documents demonstrating QA/QC capability
OEM authorizations (if OEM required) and certificate
Material Test Certificate (MTC) to accompany each supply
Start
19-Mar-2026, 4:00 pm
End
23-Mar-2026, 2:00 pm
Duration: 94 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | ********** Under PMA | Make : Rajat Model : Copper Silver Brazing Alloy Wire Title : COPPER SILVER BRAZING ALLOY-1 | 16-02-2026 11:07:47 | |
| 2 | ********** Under PMA | Make : Alfa Model : ALFA105 Title : COPPER SILVER BRAZING ALLOY-1 | 13-02-2026 16:27:54 | |
| 3 | ********** Under PMA | Make : OEM Model : BACUP4 BRAZING ALLOY WIRE Title : COPPER SILVER BRAZING ALLOY-1 | 15-02-2026 17:11:24 | |
| 4 | ********** Under PMA | Make : RAJAT ALLOYS Model : RAJAT ALLOYS Title : COPPER SILVER BRAZING ALLOY-1 | 16-02-2026 12:14:07 | |
| 5 | ********** Under PMA | Make : TECHBRAZE Model : TECHBRAZE SILVER ALLOYS AG05% BACUP4 Title : COPPER SILVER BRAZING ALLOY-1 | 14-02-2026 17:20:16 |
Key insights about MADHYA PRADESH tender market
Bidders must submit GST registration, PAN, experience certificates for similar alloy supply, financial statements if requested, EMD documentation, technical bid, OEM authorization if required, and a Material Test Certificate with each delivery, plus QA/QC compliance evidence.
The buyer may increase contracted quantity up to 25% during placement and during the contract period at contracted rates. Delivery time extends based on a calculated formula from the original delivery period, with a minimum 30 days added.
Pre-dispatch inspection is conducted at the seller’s works as per QA/MT/BOI/018 REV NO-04 DT-18.02.2020, ensuring compliance before shipment. Supplier must accommodate this inspection as part of acceptance.
Post-receipt inspection is conducted at the consignee site (BHEL Bhopal) to confirm material conformity. Acceptance hinges on lab results from the buyer’s testing, not solely on supplier documentation.
A Material Test Certificate must accompany each supply and will be used by BHEL’s lab to determine acceptance. The certificate should confirm chemical composition and conformity to alloy specifications.
The tender requires uploading applicable certificates per ATC; however, explicit IS/ISO codes are not listed. Vendors should provide QA/QC certificates and any OEM/industry certifications that validate brazing alloy quality.
Delivery timing starts after the last date of the original delivery order. If the option clause is exercised, extended time is calculated by (Increase/Original) × Original period, with a minimum of 30 days.
Buyer may terminate the contract or portion thereof for failure to deliver or other material breaches. Additionally, termination can occur for insolvency, misrepresentation, or failure to replace/reject defective material promptly.
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS