PIN ASSEMBLY
Gliders India Limited
Bid Publish Date
03-Jul-2026, 9:05 am
Bid End Date
13-Jul-2026, 2:00 pm
Value
₹57,500
Progress
Quantity
1
Bid Type
Two Packet Bid
Bharat Earth Movers Limited (BEML), under the Department of Defence Production, seeks supply of an Alignment Pin for Hoist Str Assembly BH100. Estimated value: ₹57,500.00. Location details are not specified in the data. The procurement category centers on Supply of Goods only, with the winner delivering to the designated site after contract award. The option clause allows quantity variation up to 50% during and after the contract, at contracted rates, with delivery timelines adapting proportionally. The tender emphasizes compliance with the bidder’s filled NIT and specification documents, GST and HS/NAC codes, and post-acceptance inspection at the consignee site. Unique aspects include a formal ATC requirement mandating detailed bid compliance uploads. The BOQ shows zero items, implying a tight, single-line supply requirement or incomplete data.
Product/service: Alignment Pin for Hoist Str Assembly BH100
Estimated value: ₹57,500.00
Delivery scope: Supply of Goods only
Inspection: Post Receipt Inspection at consignee site
Documentation: NIT and Specification with GST/HSN/SAC details
ATC: Must upload filled bid-compliance with technical bid
Option clause allows ±50% quantity variation during/after contract
Bid price must cover all cost components for goods supply
Post-receipt inspection at consignee site is required
Submit GST, PAN, experience, financials, EMD, and OEM authorizations
Must sign/upload NIT and Specification; include HSN/SAC codes
Not detailed in data; bidders should verify terms within bid submission
Delivery period computed from last date of original delivery order; extended time follows option clause with minimum 30 days
No explicit LD terms in data; implied penalties may be part of contract per standard rules
Experience in supplying alignment pins or similar hoist components
GST registration and valid GST compliance
Financial stability evidenced by recent financial statements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Alignment Pin for Hoist str Assy BH100
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
MYSORE
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | MYSORE | MYSORE | - | - | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Gliders India Limited
Central Coalfields Limited
HAZARIBAGH, JHARKHAND
Nmdc Steel Limited
BASTAR, CHHATTISGARH
Gliders India Limited
Ntpc Limited
MURSHIDABAD, WEST BENGAL
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar supply of goods
Financial statements (last 2-3 years)
EMD/Security deposit documents (as applicable in tender terms)
Technical bid documents
OEM authorization certificates (if required by bidder)
NIT and Specification document duly signed, sealed and uploaded
HSN code / SAC code declaration and GST structure
Bidders must sign and upload the NIT and specification with the technical bid, include HSN/SAC codes and GST structure, and submit post-receipt inspection readiness at the consignee site. Ensure the bid covers all supply costs and complies with the option clause for quantity changes.
Required documents include GST registration, PAN, recent financial statements, experience certificates for similar goods, OEM authorizations if applicable, technical bid documents, and the signed NIT/specification. EMD details should align with tender terms if applicable.
Delivery period binds to the last date of the original delivery order; if the option clause is exercised, additional time equals (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Post Receipt Inspection is conducted at the consignee site before acceptance; pre-dispatch inspection is not required unless specified in ATC. The inspecting agency is designated at the buyer’s works in the ATC terms.
Yes, bidders must include HSN/SAC codes and GST structure in the technical bid, ensuring proper GST compliance and transparent tax invoicing aligned with tender norms.
Scope is limited to the supply of goods only; no installation services are included. The bid must incorporate all cost components for the supply of the alignment pin and related accessories if specified.
If quantity increases by up to 50%, the contract price remains at the contracted rate; delivery time adjusts proportionally, calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
The tender data does not specify explicit standards; bidders should provide OEM authorizations and quality compliance documents per internal QA practices, along with GST/HST filings and NIT/spec compliance.
Armoured Vehicles Nigam Limited
Advanced Weapons And Equipment India Limited
Department of Defence Production
📍 KANPUR NAGAR, UTTAR PRADESH
Advanced Weapons And Equipment India Limited
📍 KANPUR NAGAR, UTTAR PRADESH
Nlc India Limited
📍 CUDDALORE, TAMIL NADU
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS