Bid Publish Date
10-Oct-2026, 12:10 pm
Bid End Date
27-Oct-2026, 11:00 am
Location
Progress
The opportunity is issued by Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow, for procurement of 10 PIN PLUG SOCKET / MC-SOCKET components in the jurisdiction of Sonbhadra, Uttar Pradesh (231205). The call references a supply contract with an option clause allowing +/- 25% quantity changes and a delivery schedule linked to the original delivery order dating. Bidders should anticipate potential extensions and must align with the purchaser’s contracted rates for any additional quantity. The BOQ shows no listed items, signaling a possible consolidated or upcoming scope. The invocation of ATC terms indicates mandatory compliance with uploaded certificates and documents.
Product category: 10 PIN PLUG SOCKET / MC-SOCKET
Code references: 91350601005 00 51, 91350601005 00 03
Quantity variation: +/- 25% of bid quantity
Delivery: minimum 30 days for added quantity; calculation formula provided
Certificates: mandatory uploads as per ATC
Option clause permits 25% quantity variation during contract
Delivery period recalculation uses (increase/original) × original days
Mandatory certificate uploads; rejection for missing docs
No explicit payment terms in data; refer to bid document and ATC for schedule and milestones
Delivery begins post original order date; extended delivery time applies for increased quantity with minimum 30 days
Not specified in provided data; check ATC for LD provisions
Eligibility aligned with standard UP government procurement for electrical components
Must upload mandatory certificates per ATC
Experience in supplying electrical sockets or similar electrical hardware
Quantity
56
Category
10 PIN PLUG SOCKET 91350601005 00 51
Bid Type
Single Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
5 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
10 PIN PLUG SOCKET 91350601005 00 51 , MC-SOCKET 91350601005 00 03
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Sonbhadra
Delivery Pincodes
231225
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| ADALAT VERMA | 231225,DTPS, Anpara Thermal Power Plant | Sonbhadra | Uttar Pradesh | 231225 | 6 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
27-Oct-2026, 5:30 am
Opening Date
28-Oct-2026, 5:30 am
Extended Deadline
24-Oct-2026, 5:30 am
Opening Date
25-Oct-2026, 5:30 am
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar electrical socket procurement
Financial statements or bank solvency proof
EMD payment proof (as per bid document)
Technical compliance certificates (as applicable)
OEM authorizations or distributorship certificates if applicable
Any certificates specified in Buyer Added ATC or Corrigendum
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD proof, and technical compliance docs as per the terms. Review the ATC file for any additional certificates and ensure all uploads precede the bid submission deadline. The contract allows ±25% quantity variation and requires adherence to delivery calculations.
Required submissions include GST certificate, PAN, experience certificates, financial statements, EMD proof, OEM authorizations if applicable, and technical compliance certificates. Also attach any mandatory certificates specified in the Buyer Added ATC; missing items can lead to bid rejection.
Delivery can include up to 25% additional quantity at contract rates. Additional delivery time is computed as (increase quantity / original quantity) × original delivery period, with a minimum of 30 days unless the original period exceeds that. This applies within the currency of the contract.
Upload all certificates sought in the bid document and ATC. This typically includes GST, PAN, experience certificates, financials, EMD proof, and any OEM authorizations. Incomplete uploads may lead to bid rejection per the ATC.
The BOQ shows 0 total items in the current data, indicating that detailed scope or itemization may be forthcoming. Bidders should monitor for addenda or corrigenda and prepare documentation for generic socket procurement readiness.
Delivery time for increased quantity starts from the last date of the original delivery order, with a minimum 30 days additional period; the supplier must align with contracted rates for any incremental quantity during the currency of the contract.
Evaluation will hinge on compliance with ATC certificates, technical capability for electrical sockets, experience in similar supply, financial stability, and adherence to delivery terms; the option clause may influence bid scoring due to cost and delivery flexibility.
Ensure registration (GST), valid PAN, demonstrable experience in similar socket supply, financial statements, and decisive EMD submission per bid doc. Review ATC for any organization-specific prerequisites and certify OEM authorizations if required.