Hiring of Consultants - Milestone/Deliverable Based - Appointment of Independent Engineer for Trans
Central Transmission Utility Of India Limited
Progress
Quantity
1
Bid Type
Two Packet Bid
Central Transmission Utility Of India Limited seeks an Independent Engineer for the transmission evacuation schemes of Ratle HEP (850 MW) and Kiru HEP (624 MW) in a milestone/deliverable-based engagement. The assignment is located in Gurgaon, Haryana and targets consultancy services with no BOQ quantities published. The project emphasizes specialist oversight for high-capacity renewable integration and hydropower evacuation. The contract allows a 25% fluctuation in quantity or duration, enabling responsive scoping to project evolution. An EIC is designated as Shri Ranveer Singh, DGM-PMG, signaling a structured, OTP-aligned governance framework. The engagement type aligns with large-scale, regulated infrastructure delivery and requires rigorous technical and financial tender compliance.
Independent Engineer consultancy for transmission evacuation schemes
Project scope: Ratle HEP (850 MW) and Kiru HEP (624 MW) evacuation
EMD: ₹133,000; GeM portal submission
No itemized BOQ; scope defined via RFP/milestone deliverables
ATC terms supersede GeM GTC/SLA; compliance with RFP documents
EIC: Shri Ranveer Singh, DGM-PMG
EMD amount and submission via GeM portal: ₹133,000
Contract quantity/duration may adjust by up to 25%
Excess settlement allowed with supporting documents; invoicing must declare applicability
Payment terms to be determined by RFP; milestones linked to deliverables; compliant with GeM ATC. Ensure invoicing aligns with approved milestones and included documentation for any excess charges.
Delivery timelines are defined in the RFP documentation uploaded on GeM; follow milestone-based deliverables and EIC approvals as per Shri Ranveer Singh guidance.
LD clauses to be stated in RFP ATC; ensure compliance with performance metrics and milestone-based penalties if deliverables are delayed.
Experience in consultancy for transmission/evacuation projects, preferably hydropower integration
Financial capacity aligned with RFP turnover requirements and EMD readiness
Compliance with ATC terms and GeM portal submission requirements
Main Document
SCOPE_OF_WORK
OTHER
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Central Transmission Utility Of India Limited
Central Transmission Utility Of India Limited
Central Transmission Utility Of India Limited
GURGAON, HARYANA
Central Transmission Utility Of India Limited
GURGAON, HARYANA
Central Transmission Utility Of India Limited
GURGAON, HARYANA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for hydro/power transmission consultancy
Financial statements and annual turnover details
EMD submission documentation (₹133,000)
Technical bid documents and compliance certificates
OEM authorizations or consultant authorizations if applicable
Extended Deadline
12-Jan-2026, 3:00 pm
Opening Date
12-Jan-2026, 3:30 pm
Extended Deadline
05-Jan-2026, 3:00 pm
Opening Date
05-Jan-2026, 3:30 pm
Extended Deadline
29-Dec-2025, 3:00 pm
Opening Date
29-Dec-2025, 3:30 pm
Extended Deadline
22-Dec-2025, 3:00 pm
Opening Date
22-Dec-2025, 3:30 pm
Key insights about HARYANA tender market
Bidders must submit GST, PAN, EMD ₹133,000, technical bid, and experience certificates via the GeM portal. Ensure compliance with the RFP ATC, documentation for excess settlement, and the designated EIC contact Shri Ranveer Singh. Follow milestone-based deliverables to align with project scope.
Required documents include GST certificate, PAN, financial statements, experience certificates for power transmission consultancy, EMD submission, technical bid, and OEM/consultant authorizations if applicable. Ensure all papers are current and reflect project eligibility for Ratle and Kiru hydropower evacuation.
ATC terms supersede standard GeM GTC/SLA. RFP documents take precedence, including performance and invoicing rules for excess charges. Ensure full compliance with the RFP upload and the EIC directives for Shri Ranveer Singh as project overseer.
EMD of ₹133,000 is required to participate. Submit via the GeM portal with the bid, along with GST, PAN, and experience credentials. This ensures bid validity and compliance with the RFP terms for the hydroelectric evacuation project.
Delivery milestones are defined in the RFP; the contract allows a ±25% fluctuation in quantity or duration. Milestones must be achieved per EIC approvals; late deliverables may trigger penalties under the ATC terms.
Bidders should demonstrate relevant hydro/power transmission consultancy experience, robust financials, and compliance with the GeM-based submission process. Prior exposure to RATLE and Kiru project scopes is advantageous, along with ability to meet milestone-based deliverables.
IS/ISI or ISO standards are not explicitly listed in the data; verify relevant RFP sections for required standards, certifications, and audits. Prepare to align with energy project governance, EIC oversight, and any standard prerequisites defined in the uploaded ATC documents.
Shri Ranveer Singh, DGM-PMG, serves as Engineer-In-Charge for the package, coordinating technical oversight, milestone approvals, and contract administration. Align proposals to his governance framework and ensure timely responses to technical queries and milestone reviews.
Maharashtra State Electricity Transmission Corporation Limited
📍 MUMBAI, MAHARASHTRA
Gujarat State Electricity Corporation Limited (gsecl) Vadodara
📍 VADODARA, GUJARAT
Gujarat State Electricity Corporation Limited (gsecl) Vadodara
📍 VADODARA, GUJARAT
Indian Army
📍 KANCHIPURAM, TAMIL NADU
Sign up now to access all documents
Main Document
SCOPE_OF_WORK
OTHER
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS