TenderDekho Logo
GEM

Indian Army Tarpaulins HDPE Woven Fabrics IS 7903 (Q3) Tender Tawang Arunachal Pradesh 2025

Bid Publish Date

16-Dec-2025, 8:58 pm

Bid End Date

22-Dec-2025, 9:00 am

Latest Corrigendum Available

Progress

Issue16-Dec-2025, 8:58 pm
Corrigendum20-Dec-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2016

Bid Type

Two Packet Bid

Key Highlights

  • IS 7903 (Q3) conformance requirement for HDPE tarpaulins
  • Mandatory Detailed Design Drawings submission within 5 days of award
  • Up to 25% quantity variation allowed during contract execution
  • Functional Service Centre requirement in each consignee state or establish within 30 days
  • Three-year turnover requirement with audited or CA-certified evidence
  • Delivery timelines adjusted for drawing approval delays without LD
  • BOQ contains zero items indicating standard-class tarpaulin procurement rather than a multi-item schedule
  • Region-specific procurement location: Tawang, Arunachal Pradesh

Categories 1

Tender Overview

The Indian Army invites bids for Tarpaulins Made from High Density Polyethylene (HDPE) Woven Fabrics conforming to IS 7903 (Q3) at the TAWANG, ARUNACHAL PRADESH - 790104 location. The procurement category is HDPE tarpaulins with a potential quantity adjustment up to 25% under the generic option clause. The project encompasses supply of HDPE woven tarpaulins for military needs, with delivery terms linked to the original order timeline and possible extended periods. The tender emphasizes compliance with buyer’s design approvals and service-coverage requirements, highlighting the unique regional deployment in Arunachal Pradesh.

Technical Specifications & Requirements

  • Product category: Tarpaulins from HDPE woven fabrics; standard reference: IS 7903 (Q3).
  • Standalone specifications are not published; the BOQ lists zero items, signaling a purchase aligned to the IS 7903 (Q3) tarpaulin standard rather than a multi-item schedule.
  • Key process terms include: mandatory submission of detailed drawings within 5 days of award for buyer approval; non-approval timelines may reset delivery accordingly.
  • Price scope includes option to increase/decrease quantity by up to 25% either at contract award or during contract execution at contracted rates.
  • Service capability: bidders must have a functional service center in the state of each consignee location for carry-in warranty; if not existing, a center must be established within 30 days of contract award.
  • Turnover requirement references three-year average annual turnover as per bid document; audited statements or CA certificates are required for validation.

Terms, Conditions & Eligibility

  • EMD amount: not disclosed in the available excerpt; bidders should confirm exact value and acceptable payment mode.
  • Delivery: delivery period starts from the last date of the original delivery order; extended periods are calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
  • Post-award design approval: successful bidder must submit Detailed Design Drawings within 5 days; buyer to approve or request modifications within 5 days; delays from buyer can extend delivery without LD.
  • Financials: bidders must meet turnover criteria over the last three years; provide audited balance sheets or CA certificates showing turnover against the criteria.
  • Warranty/Support: service center requirements imply on-site or carry-in support depending on warranty type; on-site warranty may bypass service center requirements.

Key Specifications

  • Product: Tarpaulins made from HDPE woven fabrics

  • Standard: IS 7903 (Q3)

  • Quantity flexibility: up to 25% increase/decrease

  • Delivery period: from last date of original delivery order; extended periods per formula with minimum 30 days

  • Service center requirement: functional in each consignee state or establishment within 30 days

  • Drawing approval: 5 days for submission; buyer to respond within 5 days

  • Turnover: minimum average turnover over last 3 years as per bid document

Terms & Conditions

  • Quantity variation up to 25% at contract and during currency

  • Service center presence or establishment within 30 days of award

  • Mandatory Detailed Design Drawings submission within 5 days and buyer approval window

Important Clauses

Payment Terms

Details not provided in excerpt; bidders should verify EMD mode and payment schedule with issuing authority

Delivery Schedule

Delivery starts after original order; extended delivery time determined by (increased quantity/original quantity) × original period, min 30 days

Penalties/Liquidated Damages

Not specified in available data; anticipated under standard government procurement terms

Bidder Eligibility

  • Three-year average annual turnover meeting bid document criteria

  • Proven capability to supply HDPE tarpaulins adhering to IS 7903 (Q3)

  • Establishable or existing service center in each consignee state

Documents 2

GeM-Bidding-8724521.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Tarpaulins Made from High Density Polyethylene (HDPE) Woven Fabrics (V3) Conforming to IS 7903

Food Corporation Of India (fci)

KANPUR NAGAR, UTTAR PRADESH

Posted: 11 February 2026
Closed: 18 February 2026
GEM

Food Corporation Of India BIS Marked HDPE Tarpaulin Tender Sambalpur Odisha 2026

Food Corporation Of India (fci)

SAMBALPUR, ODISHA

Posted: 23 January 2026
Closed: 2 February 2026
GEM

Tarpaulins Made from High Density Polyethylene (HDPE) Woven Fabrics (V3) Conforming to IS 7903

Food Corporation Of India (fci)

WEST TRIPURA, TRIPURA

Posted: 5 February 2026
Closed: 12 February 2026
GEM

Food Corporation Of India Tarpaulins HDPE IS 7903:2017 Kalyani Nadia 20x30 ft 200 GSM 2026

Food Corporation Of India (fci)

NADIA, WEST BENGAL

Posted: 15 January 2026
Closed: 20 January 2026
GEM

Food Corporation Of India tarpaulins HDPE ISI BIS IS 7903 2017 tender 2026

Food Corporation Of India (fci)

SOUTH 24 PARGANAS, WEST BENGAL

Posted: 3 January 2026
Closed: 13 January 2026
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Audited financial statements or CA certificate indicating last 3 years turnover

4

Experience certificates for similar HDPE tarpaulins or IS 7903 (Q3) products

5

OEM authorization or manufacturer credentials

6

Technical bid documents and compliance statements

7

Proof of functional Service Centre or plan to establish within 30 days

8

Detailed Design Drawings submission plan as per buyer approval timeline

Corrigendum Updates

1 Update
#1

Update

20-Dec-2025

Extended Deadline

22-Dec-2025, 9:00 am

Opening Date

22-Dec-2025, 9:30 am

Frequently Asked Questions

Key insights about ARUNACHAL PRADESH tender market

How to bid for IS 7903 Q3 tarpaulins tender in Tawang Arunachal Pradesh

Bidders should prepare IS 7903 (Q3) compliant HDPE tarpaulins, provide Detailed Design Drawings within 5 days of award, establish a service center in the consignee state within 30 days if not existing, and submit audited turnover documentation showing three-year average turnover meeting the bid criteria. Ensure understanding of 25% quantity variation and delivery-time adjustments.

What documents are required for tarpaulin procurement in Indian Army tender

Required documents include GST certificate, PAN card, audited financial statements or CA certificates showing turnover, experience certificates for IS 7903 tarpaulins, OEM authorization, technical bid, and proof of service-center capability or plans to establish within 30 days. Also include Detailed Design Drawings plan and warranty/service details.

What are the delivery terms for quantity variation in this Army bid

Delivery terms allow up to 25% quantity increase or decrease at contract placement and during contract execution at contracted rates. If extended, delivery time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days. Delays due to drawing approvals may shift delivery without LD.

What standards govern the tarpaulins in this procurement

Tarpaulins must conform to IS 7903 with the qualification Q3. Bidders should demonstrate IS 7903 compliance in technical bids and provide test certificates or manufacturer declarations confirming adherence to the IS 7903 standard.

What is required for service-center presence in consignee states

Bidders must have a functional service center in each consignee state for carry-in warranty; if not present, establish within 30 days of contract award. Payment is released only after documentary evidence of a functional service center is submitted.

When is the Detailed Design Drawings submission deadline

The successful bidder must submit Detailed Design Drawings within 5 days of award. The buyer will approve or list modifications within 5 days; delays by the buyer extend the delivery period without LD, and the bidder must align production to the approved drawings.

What turnover evidence is required for eligibility

Provide the minimum average annual turnover for the last three years as per bid document, supported by audited balance sheets or CA certificates. If the bidder is under 3 years old, use turnover figures for completed financial years after incorporation to meet criteria.