supply, installation, testing & commissioning of LT distribution panel
N/a
KARGIL, JAMMU & KASHMIR
Bid Publish Date
17-Dec-2024, 6:57 pm
Bid End Date
07-Jan-2025, 7:00 pm
Location
Progress
Quantity
785
Category
Supply installation testing and commissioning of Micro Processor based FIRE ALARM CONTROL PANEL FOUR ZONE
Bid Type
Two Packet Bid
Public procurement opportunity for Indian Army Supply installation testing and commissioning of Micro Processor based FIRE ALARM CONTROL PANEL FOUR ZONE, Supply installation testing and commissioning of Electronic Hooter 24 volt, Supply installation testing and commissioning of Manual call point break glass type, Supply installation testing and commissioning of conventional Optical SMOKE HEAT DETECTOR, Supply installation testing and commissioning of MCC Panel typr Motor Starter for 5 HP, Supply installation testing and commissioning of copper cable 3 core x 2 5 mm for panel to motor electric supply, Core Cutting charges if required, Supply installation testing and commissioning of copper cable 2 x 1 5 mm with necessary saddle screw etc, Flexible for sprinkler Dropping to False ceiling 1 mtr with chrome finish roseats plate in MEERUT, UTTAR PRADESH. Quantity: 785 issued by. Submission Deadline: 07-01-2025 19: 00: 00. View full details and respond.
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
KARGIL, JAMMU & KASHMIR
Hindustan Petroleum Corporation Ltd
KOKRAJHAR, ASSAM
North East Frontier Railway
DIBRUGARH, ASSAM
Indian Navy
PUNE, MAHARASHTRA
Gail India Limited
RANCHI, JHARKHAND
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Supply installation testing and commissioning of Micro Processor based FIRE ALARM CONTROL PANEL FOUR ZONE | Supply installation testing and commissioning of Micro Processor based FIRE ALARM CONTROL PANEL FOUR ZONE | 1 | nos | [email protected] | 60 |
| 2 | Supply installation testing and commissioning of Electronic Hooter 24 volt | Supply installation testing and commissioning of Electronic Hooter 24 volt | 4 | nos | [email protected] | 60 |
| 3 | Supply installation testing and commissioning of Manual call point break glass type | Supply installation testing and commissioning of Manual call point break glass type | 4 | nos | [email protected] | 60 |
| 4 | Supply installation testing and commissioning of conventional Optical SMOKE HEAT DETECTOR | Supply installation testing and commissioning of conventional Optical SMOKE HEAT DETECTOR | 50 | nos | [email protected] | 60 |
| 5 | Supply installation testing and commissioning of MCC Panel typr Motor Starter for 5 HP | Supply installation testing and commissioning of MCC Panel typr Motor Starter for 5 HP | 1 | nos | [email protected] | 60 |
| 6 | Supply installation testing and commissioning of copper cable 3 core x 2 5 mm for panel to motor electric supply | Supply installation testing and commissioning of copper cable 3 core x 2 5 mm for panel to motor electric supply | 60 | rm | [email protected] | 60 |
| 7 | Core Cutting charges if required | Core Cutting charges if required | 10 | nos | [email protected] | 60 |
| 8 | Supply installation testing and commissioning of copper cable 2 x 1 5 mm with necessary saddle screw etc | Supply installation testing and commissioning of copper cable 2 x 1 5 mm with necessary saddle screw etc | 600 | rm | [email protected] | 60 |
| 9 | Flexible for sprinkler Dropping to False ceiling 1 mtr with chrome finish roseats plate | Flexible for sprinkler Dropping to False ceiling 1 mtr with chrome finish roseats plate | 55 | nos | [email protected] | 60 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | EASY FIRE CONTROL SYSTEMS Under PMA | - | 07-01-2025 17:44:04 | Disqualified |
| 2 | HADWISE TECHNOLOGIES PRIVATE LIMITED Under PMA | - | 07-01-2025 17:30:43 | Disqualified |
| 3 | M/S KRISHNA TRADING COMPANY Under PMA | - | 05-01-2025 22:53:39 | Qualified |
| 4 | NIRMAL SALES CORPORATION Under PMA | - | 06-01-2025 13:00:12 | Disqualified |
| 5 | PARI ENTERPRISES Under PMA | - | 05-01-2025 22:23:03 | Qualified |
| 6 | PRAJAPATI SAFETY ENTERPRISES Under PMA | - | 11-01-2025 17:02:27 | Disqualified |
| 7 | PYRO DEFENCE CONTROL SYSTEM Under PMA | - | 11-01-2025 17:59:34 | Disqualified |
| 8 | SBC ENTERPRISES Under PMA | - | 07-01-2025 13:29:43 | Disqualified |
| 9 | SHREE GANESH ENTERPRISES Under PMA | - | 05-01-2025 22:37:12 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | PARI ENTERPRISES(MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹6,23,720 | Item Categories : Supply installation testing and commissioning of Micro Processor based FIRE ALARM CONTROL PANEL FOU |
| L2 | SHREE GANESH ENTERPRISES (MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹8,05,720 | Item Categories : Supply installation testing and commissioning of Micro Processor based FIRE ALARM CONTROL PANEL FOU |
| L3 | M/S KRISHNA TRADING COMPANY (MSE,MII)( MSE Social Category:OBC ) Under PMA | ₹9,40,714 | Item Categories : Supply installation testing and commissioning of Micro Processor based FIRE ALARM CONTROL PANEL FOU |
Key insights about UTTAR PRADESH tender market
The eligibility requirements include registration as a recognized entity, evidence of a minimum of two years of prior experience in similar projects, and compliance with all technical specifications required in the tender documentation.
Bidders must submit documents that demonstrate compliance with experience criteria, past performance records, and financial turnover along with any additional certificates as requested in the Additional Terms and Conditions (ATC).
To register, bidders must access the designated bidding platform, create an account, and submit the necessary documentation outlined in the tender notice. Follow the guidelines provided in the main document for detailed steps.
Documents must be submitted in standard formats like PDF or Word according to the specifications in the tender documentation. Ensure that all files are clearly labeled and comply with upload guidelines.
The technical specifications include a Micro Processor based Fire Alarm Control Panel, electronic hooters, manual call points, and smoke heat detectors with the necessary installation equipment as detailed in the BoQ.
All components must adhere to the appropriate quality standards for military specifications, ensuring safety, functionality, and reliability per specified criteria in the tender documents.
Bidders must comply with all documented criteria outlined in the tender in terms of technical specifications, qualifications, and any additional requirements for successful participation in the evaluation process.
The EMD amount required will be specified in the tender documentation. Bidders are required to submit the deposit along with their bids to ensure commitment to the tender process.
Winning bidders may be required to submit a performance bank guarantee, typically a percentage of the contract value, to ensure compliance with the terms of the tender and project execution.
Payment terms will be detailed in the contract agreement post-evaluation and award of the tender. Generally, payments may be milestone-based or upon satisfactory completion of the work.
The price evaluation considerations include the total bid price, compliance with the specifications, past performance ratings, and overall technical capability of the bidder.
Bids must be submitted through the designated online portal, following all submission protocols and including all required documentation as per the instructions outlined in the tender.
Bidders should refer to the tender documentation for a comprehensive overview of critical deadlines, including bid submission, opening dates, and the validity of offers.
Bids will undergo a multistage evaluation based on technical compliance, financial viability, and past performance metrics before being shortlisted for final consideration.
Results will be communicated through the official bidding platform. Notification is typically sent once the evaluation process is completed and decisions have been made.
The tender includes provisions allowing MSEs to access benefits related to experience exemptions or financial turnover, as long as proper documentation is submitted to support their eligibility.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS