TenderDekho Logo
Active GEM

Indian Air Force Air Charging Trolley with Regulator Tender 2026 – 1 Year OEM Warranty & 50% Quantity Variation

Bid Publish Date

15-Jul-2026, 11:41 am

Bid End Date

25-Jul-2026, 12:00 pm

Progress

Issue15-Jul-2026, 11:41 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

3

Bid Type

Two Packet Bid

Categories 6

Tender Overview

Organization: Indian Air Force. Product: Air charging trolley with regulator. Location: not specified. Estimated value: not disclosed; Quantity: up to 50% variation allowed under option clause. Tender context centers on airborne ground support equipment procurement with a 1-year OEM warranty, installation, commissioning, and post-sales service requirements. Unique aspects include the buyer’s right to adjust quantity during and after the contract at contracted rates and a minimum 30-day delivery extension rule. This tender emphasizes robust after-sales support and India-wide service center coverage.

Technical Specifications & Requirements

  • Warranty: 1 year from final acceptance or post-installation testing, whichever is applicable, with OEM warranty certificates to be submitted at delivery.
  • Service capability: Seller must have established Installation, Commissioning, Training, Troubleshooting, and Maintenance Service groups in INDIA; service centers near consignee destinations must be uploaded with bid.
  • Option clause: Quantity may increase up to 50% of bid quantity during contract and extended period, with delivery time calculated as (increased quantity / original quantity) × original delivery period, min 30 days.
  • Delivery concept: Delivery period commences from the last date of original delivery order; extension economics defined by the option clause.
  • ATC/ATC documents: OEM warranty and service-related documentation required at bid submission.

Terms, Conditions & Eligibility

  • Warranty obligations: 1-year OEM warranty; rectification of breakdowns during the guarantee period.
  • Certification requirement: Upload of required certificates is mandatory; non-submission may lead to rejection.
  • Installation/Training: Comprehensive installation, commissioning, and training must be provided; service network details to be uploaded.
  • Delivery terms: Extension rules apply if option clause is exercised; delivery start from last original delivery date.
  • ATC compliance: Bid must include certificates and documents sought in Bid document, ATC, and corrigenda if any.

Key Specifications

  • Product/service names: Air charging trolley with regulator

  • Category/type: Airfield ground support equipment

  • Estimated value: not disclosed; quantity variation up to 50%

  • Experience requirement: proven installation, commissioning, and after-sales service capability in INDIA

  • Quality/standards: OEM warranty with annual maintenance service; certification uploads required

  • Delivery/install requirements: delivery timelines governed by option clause; extended time rules apply

Terms & Conditions

  • Option to increase/decrease order quantity up to 50% at contracted rates

  • Delivery period determined from date of original delivery order; minimum 30 days extension

  • 1-year OEM warranty with on-site service and maintenance support in INDIA

Important Clauses

Payment Terms

Not specified in available data; bidders should await ATC details and contract terms for payment schedule and milestones

Delivery Schedule

Delivery period starts after the last date of original delivery order; option clause may extend this period with proportional time adjustment and a minimum 30-day extension

Penalties/Liquidated Damages

Not detailed in provided information; ATC may specify LD for delayed delivery or performance failures

Bidder Eligibility

  • Proven capability to supply air charging trolley with regulator and provide installation, commissioning, and training in INDIA

  • OEM authorization or manufacturer-backed bid with warranty from original equipment maker

  • Demonstrated post-sales service network and maintenance facilities near consignee locations

  • Compliance with all certificates and documentation as required by ATC and bid documents

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

AIR CHARGING TROLLEY WITH REGULATOR

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

NORTH PARAGANAS

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-NORTH 24 PARAGANASNORTH PARAGANAS--330-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN AIR FORCE

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9609063.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates of similar airfield/ground support equipment supply

4

Financial statements (last 2-3 years)

5

EMD/Security deposit proof (as applicable by contract terms)

6

OEM authorisation or manufacturer’s certificate

7

Technical compliance certificates related to air charging trolley with regulator

8

OEM warranties and post-sales service commitments

9

Details of service centres near consignee destinations

10

Installation, commissioning & testing reports (past projects)

Frequently Asked Questions

How to bid for the air charging trolley tender in India 2026

Bidders should submit all required certificates, OEM authorisation, and OEM warranty documentation at bid submission. Ensure installation, commissioning, and after-sales service capabilities are proven by listing India-based service centers. The 1-year OEM warranty must be guaranteed and supported with service records.

What documents are required for the air charging trolley bid in India

Required documents include GST registration, PAN card, experience certificates for similar equipment, financial statements, EMD proof, OEM authorisation, technical compliance certificates, and service center details near consignee destinations; ensure all ATC-specified documents are uploaded with the bid.

What are the delivery terms for IAF air charging trolley procurement

Delivery starts from the last date of the original delivery order. The supplier may face an extension if the option clause is exercised, with the extended period calculated as (increased quantity/original quantity) × original delivery period, and a minimum of 30 days.

What warranties are required for air charging trolley with regulator

A 1-year OEM warranty is required from final acceptance or after installation, testing, and commissioning. OEM warranty certificates must be submitted at delivery; the supplier must cover rectification of breakdowns during the guarantee period.

How to verify eligibility criteria for this procurement in India

Verify eligibility by demonstrating installation/commissioning capability in INDIA, OEM authorization, and a robust service network. Ensure all required certificates are uploaded per Bid Document/ATC and provide service-center details near the consignee destinations.

What standards or certifications are sought for the air trolley

The tender requires OEM warranty documentation and compliance with the supplier’s stated quality assurances. Upload relevant technical compliance certificates; ensure service and maintenance capabilities are demonstrated by in-country installation teams.

What is the payment approach for this procurement

Payment terms are not detailed in the provided data; bidders should consult the ATC for milestone-based payment terms, ensure compliance with contract delivery schedules, and align with extended delivery obligations if the option clause is exercised.

What are the penalties for delayed delivery under this tender

Penalty details are not specified here; bidders should review the final ATC and contract for liquidated damages, delivery penalties, and performance bonds to quantify potential costs for late supply.