TenderDekho Logo
Closed GEM

Indian Army Department Of Military Affairs Washing Equipment Tender 2026 - Vertical Washing Machine & Vacuum Ironing Table Procurement

Bid Publish Date

16-Aug-2026, 10:18 am

Bid End Date

28-Aug-2026, 11:00 am

EMD

₹1,00,000

Value

₹20,00,000

Progress

Issue16-Aug-2026, 10:18 am
AwardPending

Key Highlights

  • Defense procurement context: Indian Army, Department Of Military Affairs
  • Quantity variation up to 25% during contract and currency of contract
  • Packing policy: in original packing, non-returnable, standardized weights
  • Demurrage at 0.5% of contract value per day if items not lifted within 48 hours

Tender Overview

Indian Army (Department Of Military Affairs) invites bids for a multi-item laundry equipment package spanning Vertical Washing Machine, Direct Drive Hydro Extractor, Drying Tumbler, Vacuum Ironing Table with tray steam press and Teflon shoe, Portable Electric Steam Generator for Vacuum Ironing Table, Washroom Trolley, and Dry Linen Trolley. Estimated value: ₹2,000,000 with an EMD of ₹100,000. Scope covers procurement for military facilities, with a mix of washing, drying, pressing, and related utility trolleys. Location unspecified; the package references multiple washing/ironing equipment categories and related accessories. The tender emphasizes quantity flexibility up to 25% and standard packing/delivery terms, plus demurrage clauses and tax-inclusive pricing. A Rate Contract approach may apply, with demurrage at 0.5% per day if rejected items are not lifted within 48 hours. This opportunity targets suppliers capable of delivering standardized packing and timely fulfillment under defense procurement norms.

Technical Specifications & Requirements

  • Items: 7 total BOQ entries; specific item details are not disclosed in the data.
  • Estimated value: ₹2,000,000; EMD: ₹100,000.
  • Key terms: 25% quantity variation during contract; additional time formula: (additional quantity/original quantity) × original delivery period with a 30-day minimum; no return of packing material; standard packing weights; no toll/entry taxes paid separately by the buyer; packing material weight not counted in quantity.
  • Delivery/packing: Original packing, standardized weights; delivery time scales tied to contract start and option exercise; penalties for demurrage and item destruction after one month if not lifted.
  • Standards/quality: No explicit technical standards listed; procurement is framed as a rate contract with standard terms and conditions.

Terms, Conditions & Eligibility

  • EMD: ₹100,000; required as part of bid security.
  • Delivery terms: Delivery period linked to delivery orders and option clause; extended time rules apply with minimum 30 days.
  • Demurrage: 0.5% of total contract value per day for non-lift within 48 hours; items not lifted within a month may be destroyed.
  • Taxes/Duties: Taxes included in basic rate; no separate toll/entry/octroi charges payable.
  • Packing: Items in original packing; packing material non-returnable; standardized weights only.
  • Qualification: As per rate contract model; supplier must comply with the option and delivery terms; no specific brand or OEM mentioned in data.

Key Specifications

  • Laundry equipment categories: Vertical Washing Machine, Direct Drive Hydro Extractor, Drying Tumbler, Vacuum Ironing Table with tray steam press and Teflon shoe, Portable Electric Steam Generator for Vacuum Ironing Table, Washroom Trolley, Dry Linen Trolley

  • Estimated contract value: ₹2,000,000

  • EMD: ₹100,000

  • Option clause: +/- up to 25% quantity; delivery extension based on formula; minimum 30 days

  • Packing: original packing, standardized weights; no return of packing material

  • Demurrage: 0.5% per day for 48 hours delay; destruction after 1 month if unlifted

Terms & Conditions

  • EMD amount and bid security submission required

  • 25% quantity variation permitted during contract

  • 48-hour lift window; demurrage applies

  • Tax/duties included in basic rate; no separate charges

  • Original packing and standardized weights mandatory

Important Clauses

Payment Terms

Taxes included; no separate toll/entry duties; payment terms not detailed in data

Delivery Schedule

Delivery period linked to last date of original delivery order; option-based extensions; minimum 30 days

Penalties/Liquidated Damages

Demurrage at 0.5% of contract value per day for 48-hour non-lift; destruction after one month if not lifted

Bidder Eligibility

  • Proven experience in supplying defense or government laundry equipment

  • Valid GST registration and PAN; financial stability documentation

  • Ability to supply items in original packing with standardized weights

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

11

Category

Vertical Washing machine

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

10

OEM Avg. Turnover

80

Past Performance

30 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Vertical Washing machine , Direct Drive hydro Extractor , Drying Tumbler , vaccum ironing table without swivelling arm buck including tray steam press and teflon shoe , Protable Electric Steam Generator for Vaccum Ironing Table , Washroom Trolley , Dry Linen Trolley

Advisory Bank

State Bank of India

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

RAMGARH

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-RAMGARHRAMGARH--260-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9699090.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

Vertical Washing machine

Capacity 60 kg

2 pieces Delivery: 60 days
#2

Direct Drive hydro Extractor

Capacity 30 Kg

2 pieces Delivery: 60 days
#3

Drying Tumbler

Capacity 30 Kg

2 pieces Delivery: 60 days
#4

vaccum ironing table without swivelling arm buck including tray steam press and teflon shoe

vaccum ironing table without swivelling arm buck including tray steam press and teflon shoe

2 pieces Delivery: 30 days
#5

Protable Electric Steam Generator for Vaccum Ironing Table

Capacity 10 Kg hr

1 pieces Delivery: 30 days
#6

Washroom Trolley

Capacity 70 Kg

1 pieces Delivery: 30 days
#7

Dry Linen Trolley

Capacity 50 Kg

1 pieces Delivery: 30 days

Categories 12

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates from similar procurement

4

Financial statements / turnover evidence

5

EMD submission proof (₹100,000)

6

Technical bid documents (compliance statements)

7

OEM authorizations (if applicable)

Frequently Asked Questions

Key insights about JHARKHAND tender market

How to bid for Indian Army laundry equipment tender in 2026?

Bidders should prepare EMD of ₹100,000, GST and PAN, financial statements, experience certificates, OEM authorizations if needed, and technical bid documents. Ensure compliance with the option clause (25% quantity variation) and confirm delivery timelines tied to last order date. Include packing and tax considerations as specified.

What documents are required for this tender in India?

Submit GST certificate, PAN, experience certificates for similar procurement, financial statements, EMD proof of ₹100,000, technical compliance documents, and OEM authorizations if applicable. Ensure original packing compliance and standardized weight packing as per terms, plus any defense-specific bid forms.

What are the delivery and demurrage terms for this tender?

Delivery terms reference the last date of the original delivery order with minimum 30 days extension. Demurrage is charged at 0.5% of total contract value per day if unlifted beyond 48 hours; items unlifted after one month may be destroyed by the station board of officers.

Which items are included under the laundry equipment package?

The package includes Vertical Washing Machine, Direct Drive Hydro Extractor, Drying Tumbler, Vacuum Ironing Table with tray steam press and Teflon shoe, Portable Electric Steam Generator for Vacuum Ironing Table, Washroom Trolley, and Dry Linen Trolley, totaling 7 BOQ items though exact quantities are not disclosed.

Are there any brand or OEM requirements for this bid?

Data does not specify mandatory OEM brands; however, OEM authorizations may be required if applicable. Bidders should verify whether IS or defense-specific standards apply and ensure packing and delivery meet standardized weights.

What is the estimated contract value and EMD for this tender?

The estimated contract value is ₹2,000,000 with an EMD of ₹100,000. Bidders must submit the EMD as part of bid security and ensure pricing includes all taxes since tax/duties are not billed separately.

What are the packing and tax implications for this procurement?

Items must be in original packing with standardized weights; packing material is non-returnable and not counted in quantity. Taxes, toll, and local duties are embedded in the basic rate; no extra charges payable by the buyer beyond quoted price.

How does the 25% quantity option affect delivery timelines?

If quantity is increased by up to 25%, the delivery period adjusts using the formula: (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days; extended delivery may be allowed within the contracted period.