TenderDekho Logo
Closed GEM

Invitation to Bid - Supply of 8.5 Mtr.long ,180Kg . PCC Poles,Supply of Stone Pad 300x300x75mm,Supply of AB XLPE Cable in AGRA, UTTAR PRADESH

Bid Publish Date

02-Jan-2026, 1:20 pm

Bid End Date

28-Jan-2026, 2:00 pm

Value

₹1,89,00,000

Generate Docs

Progress

RA
Issue02-Jan-2026, 1:20 pm
Reverse AuctionCompleted
Award09-Apr-2026, 4:56 am
Explore all 4 tabs to view complete tender details

Quantity

35064

Category

Supply of 25 KVA 11KV-433V TF

Bid Type

Two Packet Bid

Categories 76

A tender has been published for Uttar Pradesh Power Corporation Limited (uppcl) Supply of 8. 5 Mtr. long, 180Kg. PCC Poles, Supply of Stone Pad 300x300x75mm, Supply of AB XLPE Cable in AGRA, UTTAR PRADESH. Quantity: 35064 by. Submission Deadline: 28-01-2026 14: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-8773730.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 116 Items Sign in for GEM prices

#1

Supply of 8.5 Mtr.long ,180Kg . PCC Poles

Supply of 8.5 Mtr.long ,180Kg . PCC Poles as per Approved Drawing and Technical specification

777 nos Delivery: 365 days
#2

Supply of Stone Pad 300x300x75mm

Supply of Stone Pad (300x300x75mm)

777 nos Delivery: 365 days
#3

Supply of AB XLPE Cable 3x50sqmm

Supply of Aerial Bunched XLPE Cable 3X50 (Ph) + 1X35 ( Bare messenger cum neutral) + 1x16 (insulated Street lighting) sqmm

19 km Delivery: 365 days
#4

Supply of LT XLPE cable 4x35 Sq mm

Supply of LT XLPE cable 4x35 Sq mm

220 mtr Delivery: 365 days
#5

Supply of LT XLPE cable 1x70 Sq mm

Supply of LT XLPE cable 1x70 Sq mm

90 mtr Delivery: 365 days
#6

Supply of 1x35 mm2 Un-armoured XLPE insulated Al. LT Cable

Supply of 1x35 mm2 Un-armoured XLPE insulated Al. LT Cable for energising the distribution boxes.

3,562 mtr Delivery: 365 days
#7

Supply of ACSR Weasel Conductor

Supply of ACSR Weasel Conductor

46 km Delivery: 365 days
#8

Supply of ACSR Rabbit Conductor

Supply of ACSR Rabbit Conductor -Jumpering Works

500 mtr Delivery: 365 days
#9

Supply of Aluminium binding wire - 6 SWG

Supply of Aluminium binding wire - 6 SWG

60 kg Delivery: 365 days
#10

Supply of 11KV Fuse Set Drop out

Supply of 11KV Fuse Set (Drop out)

25 set Delivery: 365 days
#11

Supply of 11KV TPMO

Supply of 11KV TPMO

25 set Delivery: 365 days
#12

Supply of 25 KVA 11KV-433V TF

Supply of 25 KVA , 11/0.433 KV T/F (Level-1 Self Protected Aluminium Wound Type)

22 nos Delivery: 365 days
#13

Supply of 63 KVA 11KV-433V TF

Supply of 63 KVA , 11/0.433 KV T/F (Level-1 Self Protected Aluminium Wound Type)

3 nos Delivery: 365 days
#14

Supply of LT Distribution box polyester sheet moulding compound SMC for 25 kVA

Supply of LT Distribution box polyester sheet moulding compound (SMC) for 25 kVA Distribution transformer with arrangement of suitable bus-bars and MCCBs as per scope of works of SBD

22 nos Delivery: 365 days
#15

Supply of LT Distribution box polyester sheet moulding compound SMC for 63 kVA

Supply of LT Distribution box polyester sheet moulding compound (SMC) for 63 kVA Distribution transformer with arrangement of suitable bus-bars and MCCBs as per scope of works of SBD

3 nos Delivery: 365 days
#16

Supply of 9 KV LA , 5 KA

Supply of 9 KV LA , 5 KA (Distribution Class)

75 nos Delivery: 365 days
#17

Supply of Earthing Coil connected with Bentonite Powder

Supply of Earthing Coil connected with Bentonite Powder

460 nos Delivery: 365 days
#18

Supply of GI Flat 25X3 for Earthing

Supply of GI Flat 25X3 for Earthing

500 mtr Delivery: 365 days
#19

Supply of Earthing Arrangement of chemical pipe size of 80mm , 3000 mm.long

Supply of Earthing Arrangement of chemical pipe size of 80mm , 3000 mm.long

90 nos Delivery: 365 days
#20

Supply of G.I. Barbed Wire

Supply of G.I. Barbed Wire

331 kg Delivery: 365 days
#21

Supply of G.I. Wire No. 16 SWG for binding

Supply of G.I. Wire No. 16 SWG for binding

15 kg Delivery: 365 days
#22

Supply of G.I. Wire 6 SWG for Protective Guarding

Supply of G.I. Wire 6 SWG for Protective Guarding

119 kg Delivery: 365 days
#23

Supply of G.I. Wire 8 SWG for protective Guarding and Earthings

Supply of G.I. Wire 8 SWG for protective Guarding and Earthings

89 kg Delivery: 365 days
#24

Supply of 11 KV Disc Fitting T and C type

Supply of 11 KV Disc Fitting T and C type

164 nos Delivery: 365 days
#25

Supply of 11 KV Polymer Disc Insulators 45 KN TandC Type

Supply of 11 KV Polymer Disc Insulators 45 KN TandC Type

164 nos Delivery: 365 days
#26

Supply of 11 KV Pin Insulator Polymer Type as per TS

Supply of 11 KV Pin Insulator Polymer Type as per TS

873 nos Delivery: 365 days
#27

Supply of Dead End clamp Insulated

Supply of Dead End clamp (Insulated)

179 nos Delivery: 365 days
#28

Supply of End Cap for AB cable

Supply of End Cap for AB cable

855 nos Delivery: 365 days
#29

Supply of Suspension clamps Insulated

Supply of Suspension clamps (Insulated)

606 nos Delivery: 365 days
#30

Supply of Pole Clamps with with I-Hook for laying ABC

Supply of Pole Clamps with with I-Hook for laying ABC

446 set Delivery: 365 days
#31

Supply of Insulating Piercing Connector 16-95 sq.mm

Supply of Insulating Piercing Connector (16-95 sq.mm)

1,069 nos Delivery: 365 days
#32

Supply of Single phase Glass Fiber Reinforced Polyester Sheet Moulding Compound SMC

Supply of Single phase Glass Fiber Reinforced Polyester Sheet Moulding Compound (SMC) Pole top distribution box with clamps (40x3 mm) and nut and bolts

357 nos Delivery: 365 days
#33

Supply of PG Clamps 16 Sq mm .- 50 sq mm

Supply of PG Clamps 16 Sq mm .- 50 sq mm (For line to line jumpering of massenger wire and energizing DB Neutral)

446 nos Delivery: 365 days
#34

Supply of PG Clamp for Rabbit

Supply of PG Clamp for Rabbit

89 nos Delivery: 365 days
#35

Supply of GI Stay Wire 7-10 SWG

Supply of GI Stay Wire 7/10 SWG

1,823 kg Delivery: 365 days
#36

Supply of HT Guy Insulator

Supply of HT Guy Insulator

154 nos Delivery: 365 days
#37

Supply of LT Guy Insulator

Supply of LT Guy Insulator

179 nos Delivery: 365 days
#38

Supply of Stay Complete

Supply of Stay Complete (GI Stay Rod 16x1800 mm-1 nos , Eye Bolt -1 nos, Anchor plate -1 nos,Turn Buckle -1 nos, Hellically Formed End Fitting, Square Washer and thimble, Nuts Bolt and Washers Ref- Drg - REC/RDSS/GEN/09

333 set Delivery: 365 days
#39

Supply of HT Stay Clamp

Supply of HT Stay Clamp as per approved drawing-11 KV

307 nos Delivery: 365 days
#40

Supply of LT Stay Clamp

Supply of LT Stay Clamp as per approved drawing

357 nos Delivery: 365 days
#41

Supply of Pre-fabricated galvanised steel items zinc 610gms-sqm

Supply of Pre-fabricated galvanised steel items (zinc 610gms/sqm), like V cross arm, top clamp, DC cross arm, bracket, clamps, cross bracings,Tea off, guarding channels, back clamp, DTs Structure etc made of GS Channels , GS angle , GS flats (50x8mm) of given sizes for over head structures as per technical specification, approved drawings and scope of work.

8 mt Delivery: 365 days
#42

Supply of GS Nuts, bolts

Supply of GS Nuts, bolts and washers as per technical specification, approved drawings and scope of work.

1 mt Delivery: 365 days
#43

Supply of Eye Bolt for Guarding

Supply of Eye Bolt for Guarding

119 nos Delivery: 365 days
#44

Supply of Jointing sleave -ACSR Weasel

Supply of Jointing sleave -ACSR Weasel

45 nos Delivery: 365 days
#45

Supply of 11 KV Danger Board

Supply of 11 KV Danger Board

281 nos Delivery: 365 days
#46

Supply of 11 KV Number Plate

Supply of 11 KV Number Plate

30 nos Delivery: 365 days
#47

Supply of Armoured Service Cable 2CX6 SQMM

Supply of Armoured Service Cable 2CX6 SQMM

17 km Delivery: 365 days
#48

Erection of HT Line-Route survey and pole spotting for 11 KV line

Erection of HT Line-Route survey and pole spotting for 11 KV line

15 ckm Delivery: 365 days
#49

Erection of HT Line-8.5 Mtr.long ,180Kg . PCC Poles

Erection of HT Line-8.5 Mtr.long ,180Kg . PCC Poles as per Approved Drawing and Technical specification

281 nos Delivery: 365 days
#50

Erection of HT Line-ACSR Weasel Conductor

Erection of HT Line-ACSR Weasel Conductor

15 ckm Delivery: 365 days
#51

Erection of HT Line-Stone Pad 300x300x75mm

Erection of HT Line-Stone Pad (300x300x75mm)

281 nos Delivery: 365 days
#52

Erection of HT Line-Pre-fabricated galvanised steel items zinc 610gms-sqm

Erection of HT Line-Pre-fabricated galvanised steel items (zinc 610gms/sqm), like V cross arm, top clamp, DC cross arm, bracket, clamps, cross bracings,Tea off, guarding channels, back clamp, DTs Structure etc made of GS Channels , GS angle , GS flats (50x8mm) of given sizes for over head structures as per technical specification, approved drawings and scope of work.

3 mt Delivery: 365 days
#53

Erection of HT Line-GS Nuts, bolts and washers

Erection of HT Line-GS Nuts, bolts and washers as per technical specification, approved drawings and scope of work.

1 mt Delivery: 365 days
#54

Erection of HT Line-G.I. Wire 6 SWG for Protective Guarding

Erection of HT Line-G.I. Wire 6 SWG for Protective Guarding

119 kg Delivery: 365 days
#55

Erection of HT Line-G.I. Wire 8 SWG for protective Guarding and Earthings

Erection of HT Line-G.I. Wire 8 SWG for protective Guarding and Earthings

89 kg Delivery: 365 days
#56

Erection of HT Line-Eye Bolt

Erection of HT Line-Eye Bolt

119 nos Delivery: 365 days
#57

Erection of HT Line-G.I. Wire No. 16 SWG for binding

Erection of HT Line-G.I. Wire No. 16 SWG for binding

15 kg Delivery: 365 days
#58

Erection of HT Line-Earthing Arrangement of chemical pipe size of 80mm

Erection of HT Line-Earthing Arrangement of chemical pipe size of 80mm , 3000 mm.long and 6 SWG earthing wire etc.

15 nos Delivery: 365 days
#59

Erection of HT Line-11 KV Pin Insulator Polymer Type as per TS

Erection of HT Line-11 KV Pin Insulator Polymer Type as per TS

798 nos Delivery: 365 days
#60

Erection of HT Line-11 KV Polymer Disc Insulators 45 KN TandC Type

Erection of HT Line-11 KV Polymer Disc Insulators 45 KN TandC Type

89 nos Delivery: 365 days
#61

Erection of HT Line-11 KV Disc Fitting T and C type

Erection of HT Line-11 KV Disc Fitting T and C type

89 nos Delivery: 365 days
#62

Erection of HT Line-PG Clamp for Rabbit

Erection of HT Line-PG Clamp for Rabbit

89 nos Delivery: 365 days
#63

Erection of HT Line-Aluminium binding wire - 6 SWG

Erection of HT Line-Aluminium binding wire - 6 SWG

60 kg Delivery: 365 days
#64

Erection of HT Line-Jointing sleave -ACSR Weasel

Erection of HT Line-Jointing sleave -ACSR Weasel

45 nos Delivery: 365 days
#65

Erection of HT Line-11 KV Danger Board

Erection of HT Line-11 KV Danger Board

281 nos Delivery: 365 days
#66

Erection of HT Line-G.I. Barbed Wire

Erection of HT Line-G.I. Barbed Wire

281 kg Delivery: 365 days
#67

Erection of HT Line-Earthing Coil connected with nutbolt using Bentonite Powder

Erection of HT Line-Earthing Coil connected with nutbolt using Bentonite Powder

281 nos Delivery: 365 days
#68

Erection of HT Line-Stay Complete

Erection of HT Line-Stay Complete (GI Stay Rod 16x1800 mm-1 nos , Eye Bolt -1 nos, Anchor plate -1 nos,Turn Buckle -1 nos, Hellically Formed End Fitting, Square Washer and thimble, Nuts Bolt and Washers Ref- Drg - REC/RDSS/GEN/09

104 set Delivery: 365 days
#69

Erection of HT Line-HT Guy Insulator

Erection of HT Line-HT Guy Insulator

104 nos Delivery: 365 days
#70

Erection of HT Line-GI Stay Wire 7-10 SWG

Erection of HT Line-GI Stay Wire 7/10 SWG

568 kg Delivery: 365 days
#71

Erection of HT Line-HT Stay Clamp as per approved drawing-11 KV

Erection of HT Line-HT Stay Clamp as per approved drawing-11 KV

207 nos Delivery: 365 days
#72

Erection of HT Line-11 KV Number Plate

Erection of HT Line-11 KV Number Plate

30 nos Delivery: 365 days
#73

Erection of HT Line-Concreting Works of Poles

Erection of HT Line-Concreting Works of Poles using cement concreting foundation 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1x2x4)-0.268 Cmt (8.5 Meter - PCC pole) as per approved Drawing

281 nos Delivery: 365 days
#74

Erection of DTR-25 KVA , 11-0.433 KV T-F Level-1 Self Protected Aluminium Wound Type

Erection of DTR-25 KVA , 11/0.433 KV T/F (Level-1 Self Protected Aluminium Wound Type)

22 nos Delivery: 365 days
#75

Erection of DTR-63 KVA , 11-0.433 KV T-F Level-1 Self Protected Aluminium Wound Type

Erection of DTR-63 KVA , 11/0.433 KV T/F (Level-1 Self Protected Aluminium Wound Type)

3 nos Delivery: 365 days
#76

Erection of DTR-8.5 Mtr.long ,180Kg . PCC Poles as per Approved Drawing and Technical specification

Erection of DTR-8.5 Mtr.long ,180Kg . PCC Poles as per Approved Drawing and Technical specification

50 nos Delivery: 365 days
#77

Erection of DTR-Stone Pad 300x300x75mm

Erection of DTR-Stone Pad (300x300x75mm)

50 nos Delivery: 365 days
#78

Erection of DTR-Pre-fabricated galvanised steel items zinc 610gms-sqm

Erection of DTR-Pre-fabricated galvanised steel items (zinc 610gms/sqm), like V cross arm, top clamp, DC cross arm, bracket, clamps, cross bracings,Tea off, guarding channels, back clamp, DTs Structure etc made of GS Channels , GS angle , GS flats (50x8mm) of given sizes for over head structures as per technical specification, approved drawings and scope of work.

5 mt Delivery: 365 days
#79

Erection of DTR-GS Nuts, bolts and washers

Erection of DTR-GS Nuts, bolts and washers as per technical specification, approved drawings and scope of work.

1 mt Delivery: 365 days
#80

Erection of DTR-11 KV Polymer Disc Insulators 45 KN TandC Type

Erection of DTR-11 KV Polymer Disc Insulators 45 KN TandC Type

75 nos Delivery: 365 days
#81

Erection of DTR-11 KV Disc Fitting T and C type

Erection of DTR-11 KV Disc Fitting T and C type

75 nos Delivery: 365 days
#82

Erection of DTR-11 KV Pin Insulator Polymer Type as per TS

Erection of DTR-11 KV Pin Insulator Polymer Type as per TS

75 nos Delivery: 365 days
#83

Erection of DTR-11KV TPMO

Erection of DTR-11KV TPMO

25 set Delivery: 365 days
#84

Erection of DTR-11KV Fuse Set Drop out

Erection of DTR-11KV Fuse Set (Drop out)

25 set Delivery: 365 days
#85

Erection of DTR-9 KV LA , 5 KA Distribution Class

Erection of DTR-9 KV LA , 5 KA (Distribution Class)

75 nos Delivery: 365 days
#86

Erection of DTR-LT Distribution box polyester sheet moulding compound SMC for 25 kVA

Erection of DTR-LT Distribution box polyester sheet moulding compound (SMC) for 25 kVA Distribution transformer with arrangement of suitable bus-bars and MCCBs as per scope of works of SBD

22 nos Delivery: 365 days
#87

Erection of DTR-LT Distribution box polyester sheet moulding compound SMC for 63 kVA

Erection of DTR-LT Distribution box polyester sheet moulding compound (SMC) for 63 kVA Distribution transformer with arrangement of suitable bus-bars and MCCBs as per scope of works of SBD

3 nos Delivery: 365 days
#88

Erection of DTR-LT XLPE cable 4x35 Sq mm

Erection of DTR-LT XLPE cable 4x35 Sq mm

220 mtr Delivery: 365 days
#89

Erection of DTR-LT XLPE cable 1x70 Sq mm

Erection of DTR-LT XLPE cable 1x70 Sq mm

90 mtr Delivery: 365 days
#90

Erection of DTR-G.I. Barbed Wire

Erection of DTR-G.I. Barbed Wire

50 kg Delivery: 365 days
#91

Erection of DTR-ACSR Rabbit Conductor -Jumpering Works

Erection of DTR-ACSR Rabbit Conductor -Jumpering Works

500 mtr Delivery: 365 days
#92

Erection of DTR-Stay Complete

Erection of DTR-Stay Complete (GI Stay Rod 16x1800 mm-1 nos , Eye Bolt -1 nos, Anchor plate -1 nos,Turn Buckle -1 nos, Hellically Formed End Fitting, Square Washer and thimble, Nuts Bolt and Washers Ref- Drg - REC/RDSS/GEN/09

50 set Delivery: 365 days
#93

Erection of DTR-HT Guy Insulator

Erection of DTR-HT Guy Insulator

50 nos Delivery: 365 days
#94

Erection of DTR-GI Stay Wire 7-10 SWG

Erection of DTR-GI Stay Wire 7/10 SWG

275 kg Delivery: 365 days
#95

Erection of DTR-HT Stay Clamp

Erection of DTR-HT Stay Clamp as per approved drawing-11 KV

100 nos Delivery: 365 days
#96

Erection of DTR-Earthing Arrangement of chemical pipe size of 80mm

Erection of DTR-Earthing Arrangement of chemical pipe size of 80mm , 3000 mm.long and 8 SWG earthing wire etc.

75 nos Delivery: 365 days
#97

Erection of DTR-GI Flat 25X3 for Earthing

Erection of DTR-GI Flat 25X3 for Earthing

500 mtr Delivery: 365 days
#98

Erection of DTR-Concreting Works of Poles

Erection of DTR-Concreting Works of Poles using cement concreting foundation 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1x2x4)-0.268 Cmt (8.5 Meter - PCC pole) as per approved Drawing

50 nos Delivery: 365 days
#99

Erection of LT Line-8.5 Mtr.long ,180Kg . PCC Poles

Erection of LT Line-8.5 Mtr.long ,180Kg . PCC Poles as per Approved Drawing and Technical specification

446 nos Delivery: 365 days
#100

Erection of LT Line-Stone Pad 300x300x75mm

Erection of LT Line-Stone Pad (300x300x75mm)

446 nos Delivery: 365 days
#101

Erection of LT Line-AB XLPE Cable 3X50 sqmm

Erection of LT Line-Aerial Bunched XLPE Cable 3X50 (Ph) + 1X35 ( Bare messenger cum neutral) + 1x16 (insulated Street lighting) sqmm

18 ckm Delivery: 365 days
#102

Erection of LT Line-Pole Clamps with I-Hook for laying ABC

Erection of LT Line-Pole Clamps with with I-Hook for laying ABC

446 set Delivery: 365 days
#103

Erection of LT Line-Dead End clamp Insulated

Erection of LT Line-Dead End clamp (Insulated)

179 nos Delivery: 365 days
#104

Erection of LT Line-Suspension clamps Insulated

Erection of LT Line-Suspension clamps (Insulated)

606 nos Delivery: 365 days
#105

Erection of LT Line-End Cap for AB cable

Erection of LT Line-End Cap for AB cable

855 nos Delivery: 365 days
#106

Erection of LT Line-PG Clamps 16 Sq mm .- 50 sq mm

Erection of LT Line-PG Clamps 16 Sq mm .- 50 sq mm (For line to line jumpering of massenger wire and energizing DB Neutral)

446 nos Delivery: 365 days
#107

Erection of LT Line-Insulating Piercing Connector 16-95 sq.mm

Erection of LT Line-Insulating Piercing Connector (16-95 sq.mm)

1,069 nos Delivery: 365 days
#108

Erection of LT Line-1x35 mm2 Un-armoured XLPE insulated Al.

Erection of LT Line-1x35 mm2 Un-armoured XLPE insulated Al. LT Cable for energising the distribution boxes.

3,562 mtr Delivery: 365 days
#109

Erection of LT Line-Single phase Glass Fiber Reinforced Polyester Sheet Moulding Compound SMC

Erection of LT Line-Single phase Glass Fiber Reinforced Polyester Sheet Moulding Compound (SMC) Pole top distribution box with clamps (40x3 mm) and nut and bolts

357 nos Delivery: 365 days
#110

Erection of LT Line-Earthing Coil connected with nutbolt using Bentonite Powder

Erection of LT Line-Earthing Coil connected with nutbolt using Bentonite Powder

179 nos Delivery: 365 days
#111

Erection of LT Line-Stay Complete

Erection of LT Line-Stay Complete (GI Stay Rod 16x1800 mm-1 nos , Eye Bolt -1 nos, Anchor plate -1 nos,Turn Buckle -1 nos, Hellically Formed End Fitting, Square Washer and thimble, Nuts Bolt and Washers Ref- Drg - REC/RDSS/GEN/09

179 set Delivery: 365 days
#112

Erection of LT Line-LT Guy Insulator

Erection of LT Line-LT Guy Insulator

179 nos Delivery: 365 days
#113

Erection of LT Line-GI Stay Wire 7-10 SWG

Erection of LT Line-GI Stay Wire 7/10 SWG

980 kg Delivery: 365 days
#114

Erection of LT Line-LT Stay Clamp

Erection of LT Line-LT Stay Clamp as per approved drawing

357 nos Delivery: 365 days
#115

Erection of LT Line-Concreting Works of

Erection of LT Line-Concreting Works of Poles using cement concreting foundation 1 part cement, 2 part sand, 4 part 20 mm size stone aggregate chips (1x2x4)-0.268 Cmt (8.5 Meter - PCC pole) as per approved Drawing

446 nos Delivery: 365 days
#116

Erection of Armoured Service Cable-Installation of Armoured Service Cable Connections

Erection of Armoured Service Cable-Installation of Armoured Service Cable 2CX6 SQMM for Connections with all accessories

856 nos Delivery: 365 days

Corrigendum Updates

1 Update
#1

Update

23-Jan-2026

Extended Deadline

28-Jan-2026, 2:00 pm

Opening Date

28-Jan-2026, 2:30 pm

Reverse Auction Schedule

Completed

Start

10-Feb-2026, 6:00 pm

End

12-Feb-2026, 10:00 am

Duration: 40 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Technical Results

S.No Seller Item Date Status
1
Apoorba Electricals   Under PMA
-27-01-2026 16:55:03
2
S. R. INFRACONSTRUCTION PRIVATE LIMITED   Under PMA
-28-01-2026 12:00:04
3
SMM INFRATECH PRIVATE LIMITED   Under PMA
-27-01-2026 17:35:11
4
SPARK UTILITY SERVICES PRIVATE LIMITED   Under PMA
-22-01-2026 12:07:15

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1SPARK UTILITY SERVICES PRIVATE LIMITED   Under PMA Winner ₹2,06,52,884Item Categories : Supply of 8.5 Mtr.long ,180Kg . PCC Poles,Supply of Stone Pad 300x300x75mm,Supply of AB XLPE Cable
L2SMM INFRATECH PRIVATE LIMITED   Under PMA₹2,07,87,550Item Categories : Supply of 8.5 Mtr.long ,180Kg . PCC Poles,Supply of Stone Pad 300x300x75mm,Supply of AB XLPE Cable

🎉 L1 Winner

SPARK UTILITY SERVICES PRIVATE LIMITED   Under PMA

Final Price: ₹2,06,52,884