TenderDekho Logo
Active GEM

Procurement Opportunity: 2 POLE ISOLATOR SWITCH,CLUTCH MASTER CYL,LINED SHOE,AIR DRYER,BEARING INNER,ROLLER BEARING,VALVE RE in JALANDHAR, PUNJAB

Bid Publish Date

25-Aug-2026, 9:21 am

Bid End Date

04-Sep-2026, 10:00 am

Progress

Issue25-Aug-2026, 9:21 am
AwardPending

Indian Army announces a tender for 2 POLE ISOLATOR SWITCH, CLUTCH MASTER CYL, LINED SHOE, AIR DRYER, BEARING INNER, ROLLER BEARING, VALVE RELAY AIR PRESSURE in JALANDHAR, PUNJAB. Quantity: 13. Submission Deadline: 04-09-2026 10: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

13

Category

2 POLE ISOLATOR SWITCH

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

2 POLE ISOLATOR SWITCH , CLUTCH MASTER CYL , LINED SHOE , AIR DRYER , BEARING INNER , ROLLER BEARING , VALVE RELAY AIR PRESSURE

Pre-Bid & Qualification

Pre-Bid Date

03-09-2026 10:00:00

Pre-Bid Venue

THE SELLER SHALL MEET THE BUYER AT THE BUYER S DESIGNATED LOCATION FOR VERIFICATION OF PRODUCT SPECIFICATIONS AND QUALITY OF PRODUCT SAMPLE BEFORE PARTICIPATION IN THE BID. IF THE SELLER IS FROM AN OUTSIDE LOCATION, THEY WILL CONTACT THE BUYER FOR CLARIFICATION OF PRODUCT. IN CASE THE SELLER BECOMES THE L1 BIDDER, INSTALLATION OF THE PRODUCT AT THE BUYER S SITE SHALL BE THE SOLE RESPONSIBILITY OF THE SELLER. THE PRODUCT SAMPLE AND DEMONSTRATION SHALL BE PROVIDED FREE OF COST BY THE SELLER. ALL INSTALLATION COSTS INCLUDING LABOR, TRAVEL, TOOLS, AND CONSUMABLES, SHALL BE BORNE ENTIRELY BY THE SELLER. ALL ABOVE CHARGES FOR THE PRODUCT ARE INCLUDED IN BID AMOUNT. IF THE SELLER FAILS TO FULFILL THESE CONDITIONS OR DEFAULTS ON COMMITMENTS, THE BUYER RESERVES THE RIGHT TO CANCEL THE BID/CONTRACT AT ANY STAGE WITHOUT FINANCIAL LIABILITY

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

JALANDHAR CITY

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JALANDHAR CITYJALANDHAR CITY--115-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9802246.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 7 Items Sign in for GEM prices

#1

2 POLE ISOLATOR SWITCH

TATA

1 nos Delivery: 15 days
#2

CLUTCH MASTER CYL

TATA

1 nos Delivery: 15 days
#3

LINED SHOE

TATA

4 nos Delivery: 15 days
#4

AIR DRYER

TATA

2 nos Delivery: 15 days
#5

BEARING INNER

TATA

2 nos Delivery: 15 days
#6

ROLLER BEARING

TATA

2 nos Delivery: 15 days
#7

VALVE RELAY AIR PRESSURE

TATA

1 nos Delivery: 15 days

Categories 12

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer