Tender Notice for 1_Supply of 1000 mm OD Neoprene rubber bellow _ 1013 mm GT side _ as per specification in Drawing K in SURAT, GUJARAT

Bid Publish Date

08-Jan-2025, 2:53 pm

Bid End Date

18-Jan-2025, 4:00 pm

EMD

₹6,96,877

Progress

Issue08-Jan-2025, 2:53 pm
Technical18-01-2025 10:37:24
Financial
AwardCompleted
Explore all 5 tabs to view complete tender details

Quantity

280

Category

1_Supply of 1000 mm OD Neoprene rubber bellow _ 1013 mm GT side _ as per specification in Drawing K-12-51130- 2512-ED and K-12-51130-2513-ED

Bid Type

Two Packet Bid

Categories 15

Nuclear Power Corporation Of India Limited invites bids for 1_Supply of 1000 mm OD Neoprene rubber bellow _ 1013 mm GT side _ as per specification in Drawing K-12-51130- 2512-ED and K-12-51130-2513-ED, 2_Installation of Neoprene rubber bellow 1000 mm OD _1013 mm GT side _ as per specification in Drawing K-12-51130-2512-ED and K- 12-51130-2513-ED, 3_Supply of 1000 mm OD Neoprene rubber bellow as per specification in Drawing K-12-51130- 2512-ED and K-12-51130-2513-ED, 4_Installation of Neoprene rubber bellow 1000 mm OD as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED, 5_Supply of 680 mm OD Neoprene rubber bellow as per specification in Drawing K-12-51130-2512-ED and K-12- 51130-2513-ED, 6_Installation of 680 mm OD Neoprene rubber bellow as per specification in Drawing K-12-51130- 2512-ED and K-12-51130-2513-ED, 7_Installation of 500 mm OD Neoprene rubber bellow at Generator terminal as per specification in Drawing K-12-51130-2511-ED, 8_Supply of spare 500 mm OD Neoprene rubber bellow Generator terminal as per specification in Drawing K-12-51130-2511- ED, 9_Supply and installation of IPBD Inspection Window Gasket and repairing of lock nut arrangement as per specification in Drawing K-12-51130-2524-ED and K-12- 51130-2544-ED, 10_Installation of 1000 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529- ED, 11_Supply of 1000 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529-ED, 12_Installation of 680 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529-ED and K-12- 51130-2508-DD, 13_Supply of spare 680 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529- ED and K-12-51130-2508-DD, 14_Installation of 24 kV Bus support insulator as per specification in Drawing K-12- 51130-2527-ED and K-12-51130-2525-ED, 15_Supply of spare 24 kV bus support insulator as per specification in Drawing K-12-51130-2527-ED and K-12-51130-2525-ED in SURAT, GUJARAT. Quantity: 280. Submission Deadline: 18-01-2025 16: 00: 00. Submit your proposal before the deadline.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

1_Supply of 1000 mm OD Neoprene rubber bellow _ 1013 mm GT side _ as per specification in Drawing K-12-51130- 2512-ED and K-12-51130-2513-ED , 2_Installation of Neoprene rubber bellow 1000 mm OD _1013 mm GT side _ as per specification in Drawing K-12-51130-2512-ED and K- 12-51130-2513-ED , 3_Supply of 1000 mm OD Neoprene rubber bellow as per specification in Drawing K-12-51130- 2512-ED and K-12-51130-2513-ED , 4_Installation of Neoprene rubber bellow 1000 mm OD as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED , 5_Supply of 680 mm OD Neoprene rubber bellow as per specification in Drawing K-12-51130-2512-ED and K-12- 51130-2513-ED , 6_Installation of 680 mm OD Neoprene rubber bellow as per specification in Drawing K-12-51130- 2512-ED and K-12-51130-2513-ED , 7_Installation of 500 mm OD Neoprene rubber bellow at Generator terminal as per specification in Drawing K-12-51130-2511-ED , 8_Supply of spare 500 mm OD Neoprene rubber bellow Generator terminal as per specification in Drawing K-12-51130-2511- ED , 9_Supply and installation of IPBD Inspection Window Gasket and repairing of lock nut arrangement as per specification in Drawing K-12-51130-2524-ED and K-12- 51130-2544-ED , 10_Installation of 1000 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529- ED , 11_Supply of 1000 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529-ED , 12_Installation of 680 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529-ED and K-12- 51130-2508-DD , 13_Supply of spare 680 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529- ED and K-12-51130-2508-DD , 14_Installation of 24 kV Bus support insulator as per specification in Drawing K-12- 51130-2527-ED and K-12-51130-2525-ED , 15_Supply of spare 24 kV bus support insulator as per specification in Drawing K-12-51130-2527-ED and K-12-51130-2525-ED

Authority Records

DEPARTMENT OF ATOMIC ENERGY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-7340422.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

1_Supply of 1000 mm OD Neoprene rubber bellow _ 1013 mm GT side _ as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

1_Supply of 1000 mm O/D Neoprene rubber bellow (1013 mm GT side)as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

7 no Delivery: 365 days
#2

2_Installation of Neoprene rubber bellow 1000 mm OD _1013 mm GT side _ as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

2_Installation of Neoprene rubber bellow 1000 mm O/D (1013 mm GT side)as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

6 no Delivery: 730 days
#3

3_Supply of 1000 mm OD Neoprene rubber bellow as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

3_Supply of 1000 mm O/D Neoprene rubber bellow as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

7 no Delivery: 365 days
#4

4_Installation of Neoprene rubber bellow 1000 mm OD as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

4_Installation of Neoprene rubber bellow 1000 mm O/D as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

6 no Delivery: 730 days
#5

5_Supply of 680 mm OD Neoprene rubber bellow as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

5_Supply of 680 mm O/D Neoprene rubber bellow as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

9 no Delivery: 365 days
#6

6_Installation of 680 mm OD Neoprene rubber bellow as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

6_Installation of 680 mm O/D Neoprene rubber bellow as per specification in Drawing K-12-51130-2512-ED and K-12-51130-2513-ED

8 no Delivery: 730 days
#7

7_Installation of 500 mm OD Neoprene rubber bellow at Generator terminal as per specification in Drawing K-12-51130-2511-ED

7_Installation of 500 mm O/D Neoprene rubber bellow at Generator terminal as per specification in Drawing K-12-51130-2511-ED

6 no Delivery: 730 days
#8

8_Supply of spare 500 mm OD Neoprene rubber bellow Generator terminal as per specification in Drawing K-12-51130-2511-ED

8_Supply of spare 500 mm O/D Neoprene rubber bellow Generator terminal as per specification in Drawing K-12-51130-2511-ED

9 no Delivery: 365 days
#9

9_Supply and installation of IPBD Inspection Window Gasket and repairing of lock nut arrangement as per specification in Drawing K-12-51130-2524-ED and K-12-51130-2544-ED

9_Supply and installation of IPBD Inspection Window Gasket and repairing of lock nut arrangement as per specification in Drawing K-12-51130-2524-ED and K-12-51130-2544-ED

132 no Delivery: 730 days
#10

10_Installation of 1000 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529-ED

10_Installation of 1000 mm O/D seal-off bushing as per specification in Drawing K-12-51130-2529-ED

24 no Delivery: 730 days
#11

11_Supply of 1000 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529-ED

11_Supply of 1000 mm O/D seal-off bushing as per specification in Drawing K-12-51130-2529-ED

25 no Delivery: 365 days
#12

12_Installation of 680 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529-ED and K-12-51130-2508-DD

12_Installation of 680 mm O/D seal-off bushing as per specification in Drawing K-12-51130-2529-ED and K-12-51130-2508-DD

6 no Delivery: 730 days
#13

13_Supply of spare 680 mm OD seal-off bushing as per specification in Drawing K-12-51130-2529-ED and K-12-51130-2508-DD

13_Supply of spare 680 mm O/D seal-off bushing as per specification in Drawing K-12-51130-2529-ED and K-12-51130-2508-DD

7 no Delivery: 365 days
#14

14_Installation of 24 kV Bus support insulator as per specification in Drawing K-12-51130-2527-ED and K-12-51130-2525-ED

14_Installation of 24 kV Bus support insulator as per specification in Drawing K-12-51130-2527-ED and K-12-51130-2525-ED

3 no Delivery: 730 days
#15

15_Supply of spare 24 kV bus support insulator as per specification in Drawing K-12-51130-2527-ED and K-12-51130-2525-ED

15_Supply of spare 24 kV bus support insulator as per specification in Drawing K-12-51130-2527-ED and K-12-51130-2525-ED

25 no Delivery: 365 days

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate

3

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

4

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Results

S.No Seller Item Date Status
1
BHARAT HEAVY ELECTRICALS LIMITED   Under PMA
-18-01-2025 10:37:24

Financial Results

Rank Seller Price Item
L1
BHARAT HEAVY ELECTRICALS LIMITED(MII)   Under PMA
Item Categories : 1_Supply of 1000 mm OD Neoprene rubber bellow _ 1013 mm GT side _ as per specification in Drawing K

Frequently Asked Questions

Key insights about GUJARAT tender market

What are the eligibility requirements for participating in this tender?

To participate, the eligibility requirements include being a registered entity with relevant industry experience. Bidders must present documents verifying their past experiences and compliance with the tender specifications.

Is OEM authorization required for this tender?

Yes, bidders must submit an OEM Authorization Certificate alongside their bid to validate the specification compliance of the Neoprene rubber bellow being supplied.

What documents are required for submission?

The required documents include compliance certificates, experience documentation, and any exemptions claims relevant to eligibility criteria must be included with the bid submission.

Can you explain the registration process for bidders?

Bidders need to ensure they are appropriately registered with the necessary government agencies and have all relevant certifications available, allowing them to engage in public sector tenders.

What are the technical specifications for the Neoprene rubber bellow?

The technical specifications involve adherence to defined quality standards for Neoprene rubber materials, as detailed in the provided drawings, such as Drawing K-12-51130-2512-ED and K-12-51130-2513-ED.

Are there specific quality standards that must be met?

Yes, all materials supplied must meet strict quality standards outlined in the tender documents. Compliance checks will be part of the evaluation process.

What is the Earnest Money Deposit (EMD) amount for this tender?

The Earnest Money Deposit (EMD) required for this tender is 696,877 INR, which must be submitted along with the proposal.

What are the payment terms for the contract?

Payment terms will be specified in the tender documentation, generally structured to ensure timely compensation upon successful delivery and installation of the specified bellow units.

What submission methods are acceptable for the documents?

Documents should be submitted through the official online procurement portal designated for the tender, adhering to specified formats and protocols.

How will the evaluation process be conducted?

The evaluation will follow a total value-wise evaluation approach to gauge the competitive pricing, technical compliance, and overall value proposition of the bidders.

When will bidders be notified of the results?

Notification of results will typically be communicated through standard channels outlined in the tender documentation once the evaluation process is finalized.

Are there benefits available for Micro and Small Enterprises?

Yes, MSEs may avail special provisions such as exemptions in certain eligibility criteria which will foster their participation in the tender process.

Does this tender align with 'Make in India' policies?

Bidders are encouraged to comply with 'Make in India' policies, promoting local manufacturing and procurement facilitation, and can enhance the chances of a favorable evaluation.

What local procurement rules must be followed?

Bidders must adhere to local content and procurement rules established under current government regulations, which ensure that a certain percentage of the materials supplied are sourced locally.