LED Garden Light (V2)
Urban Development And Housing Department
DARBHANGA, BIHAR
Bid Publish Date
16-Jul-2026, 10:53 am
Bid End Date
27-Jul-2026, 11:00 am
Location
Progress
Quantity
25
Bid Type
Two Packet Bid
Organization: Bharatiya Nabhikiya Vidyut Nigam Limited, under the Department of Atomic Energy. Procurement: 30 W LED post lanterns for exterior garden lighting, package quantity 25 nos. Delivery window: 28 days from order. Approved makes: WIPRO, CROMPTON, LIGHTING TECHNOLOGIES, PHILIPS, EVE READY, HAVELL’S, SURYA; only OEM or Authorized channel partners may participate. Include authorized OEM certificate if bidding via an Authorized partner. Scope: supply, transportation, and safe delivery of complete lighting units. Unique aspects: mandatory warranty, LD as per GeM, IP ISI-focused housing, and IP IS 10322 (Part 1):1982 compliance. Targeted for government procurement with GeM ATC adherence and IP protection standards. This tender targets fixed municipal-scale outdoor lighting with specific brand control and post-delivery warranty requirements, not direct buying. Keywords integrated: tender in Bhavini, Bhavini procurement, LED post lantern supply.
30 W LED post lanterns
Quantity: 25 nos
Approved brands: WIPRO/CROMPTON/LIGHTING TECHNOLOGIES/PHILIPS/EVE READY/HAVELLS/SURYA
ISI marked materials for GI/MS/CI components
IP rating per IS 10322 (Part 1):1982
Three-core connecting wire length provided with each lantern
Regional wind withstand capacity in m/s
Warranty for lighting system and LED source
BEE star rating for LED bulbs
Delivery within 28 days; LDs apply per GeM terms
Quantity can be increased up to 25% during contract
Only OEM or authorized channel partners may bid with proper authorization
Bid price includes all costs; no separate service charges; LDs per GeM terms
Delivery to commence after order; 28 days target; extended time via option clause with minimum 30 days
Liquidated damages applicable as per GeM terms; failure to submit required ATC documents may lead to rejection
OEM or Authorized channel partner for listed brands
Authorized certificate from OEM to be enclosed with bid
Ability to supply 25 units of 30 W LED post lantern within 28 days
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LED Garden Light (V2) (Q2)
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
28
Delivery Locations
1
Delivery Cities
Chengalpattu
Delivery Pincodes
603102
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Viswanathan K | 603102,BHAVINI PFBR PLANT SITE KALPAKKAM | Chengalpattu | Tamil Nadu | 603102 | 25 | 28 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Urban Development And Housing Department
DARBHANGA, BIHAR
Munitions India Limited
PUNE, MAHARASHTRA
N/a
CHANDIGARH, CHANDIGARH
Bhakra Beas Management Board
Rail Wheel Factory Yelahanka
BANGALORE, KARNATAKA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Type of Garden Light | LED post top lantern/luminaire with pole |
| GENERIC | Material of Garden Lighting pole including lighting system (lantern/luminaire) (Note: Wherever GI, MS, CI materials used, materials shall be ISI Marked) | LED post top with out pole. Hence not applicable |
| GENERIC | Pole height inlcluding lantern/luminaire (in m) | without pole |
| GENERIC | No.of lantern/luminaire with each pole (in m) | LED post top with out pole. Hence not applicable |
| LIGHT SOURCE | Type of light source - BEE star rating of LED Bulb | SMD LED Chip |
| LIGHT SOURCE | LED Rating in each lantern/luminaire/lighting system (in Watts) | 30.0 |
| LIGHT SOURCE | LED Lamp/System efficacy in each lantern / luminaire (in lumen / watt) | ≥ 105 and < 120 |
| LIGHT SOURCE | In case of LED bulb - Cap designation of each lamp and holder in each lantern / luminaire | Not applicable (for SMP LED Chip) |
| LIGHT SOURCE | Colour temperature of each light source | 6000 +/-500K |
| PROTECTION | Automatic Lower / Higher Cut off voltage | Yes. Lower cut off 120 V, Higher cut off 300 V |
| PROTECTION | Protection against surges and transients - External | > / = 10 KV Or higher |
| THERMAL MANAGEMENT | Minimum Operating Temperature (in deg. C) | -10 |
| THERMAL MANAGEMENT | Maximum Operating Temperature (in deg. C) | 50 |
| LANTERN/LUMINAIRE - CONSTRUCTION | Diffuser Material | UV stabilized - Poly Carbonate |
| LANTERN/LUMINAIRE - CONSTRUCTION | Impact resistance on diffuser material (in IK) | 7 |
| LANTERN/LUMINAIRE - CONSTRUCTION | Protection of the entire housing (in IP) Protection of the entire housing as per IS:10322 (Part 1):1982 latest | 65 |
| LANTERN/LUMINAIRE - CONSTRUCTION | Length of ISI marked three core connecting wire (Provided along with each lantern/luminiare) - (in m) | 0.5 |
| LANTERN/LUMINAIRE - CONSTRUCTION | Regional wind withstand capacity which the pole structure support is suitable to withstand (in m/s) | 33 |
| CERTIFICATIONS | Warranty for free replacement of lighting systems including lightsource (in years) | 1 |
| CERTIFICATIONS | Type of LED Bulb / Type of control gear for LED Modules | Type 3 (as Per IS: 16103 (Part-2): 2012) DC or AC Supplied Electronic Control Gear for LED Modules - Performance Requirements as per IS:16104:2012 latest /IEC 62384:2020 |
| CERTIFICATIONS | Availabiliy of BIS CRS compliance | Yes as per IS 15885 (Part 2/Sec 13 |
| ADVANCE SAMPLE | Agreed to provide Advance Sample(s) for buyer's approval before commencement of supply. ( hint: Applicable in case of orders placed against bid and not applicable in case of Direct Buying ) | No |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates of similar LED lighting supply
Financial statements for last 2-3 years
Bid security/EMD as applicable by GeM terms
Technical bid documents and BOM
OEM authorization or authorized channel partner certificate
Compliance certificates for ISI/BS/CIS standards per ATC
Warranty terms documentation and post-sale support details
Bidders must be OEM or an authorized partner for listed brands, submit OEM authorization, ISI/CRS certificates, and ATC-compliant documents. Ensure 28-day delivery, 30 W LED capacity, 25 units, and warranty details. Provide GeM-compliant bid with LD terms and sample submission if required.
Submit GST, PAN, last 2-3 years financial statements, experience certificates for similar LED lighting supply, EMD as per GeM, OEM authorization, technical bid, and ISI/BIS compliance certificates per ATC. Include warranty terms and post-sale support details.
Spec requires 30 W LED, BEE star rating, LED efficacy in lumens/watt, ISI marked housing, diffuser material, IK impact rating, IP housing per IS 10322:1982, 3-core wire length, wind resistance in m/s, and LED lamp compatibility.
Delivery target is 28 days from order; LDs apply per GeM terms. If quantity increases by up to 25%, additional time is calculated with a minimum of 30 days under the option clause.
Only OEMs or authorized partners for WIPRO, CROMPTON, LIGHTING TECHNOLOGIES, PHILIPS, EVE READY, HAVELLS, SURYA can bid. If bidding via an authorized channel partner, a valid OEM authorization certificate must be enclosed; otherwise bid will be rejected.
Scope covers supply, transportation, and safe delivery of 25 units of 30 W LED post lanterns; bid price must include all components. The contract is for supply only, with no service component, and inclusion of LDs as per GeM terms.
Advance sample submission is required per ATC before commencement of supply; ensure samples are approved by buyer prior to full order execution; this is applicable in RFQ bids rather than direct purchases.
Mandatory ISI marked materials, BIS CRS compliance, BEE star rating for LEDs, and IS 10322 (Part 1):1982 for housing protection. OEM authorization and documentation must confirm these certifications for bid evaluation.
Northern Railway
📍 AMBALA, HARYANA
Northern Railway
Southern Railway
📍 VELLORE, TAMIL NADU
East Coast Railway
N/a
📍 NORTH AND MIDDLE ANDAMAN, ANDAMAN & NICOBAR
Sign up now to access all documents
Main Document
OTHER
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS